Back to kitchen remodel contractors
C T W Mechanical
- Based in
- San Francisco
- On San Francisco permits
- Sep 2000 to Oct 2026
- Last 24 months
- 12 permits filed
101 permits since 2000: 72 completed, 9 in progress, 16 never finaled, 4 expired or cancelled.
Of the 16 never-finaled permits, 1 is 3 to 5 years old, 8 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 13 completed, 2 in progress, 1 never finaled. Typically 12 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 15, 2026 | In progress issued Jun 2026 | 1030 Illinois St | add one type i hood to (e) kitchen, install two split type heatpumps an exhaust fanDetails
add one type i hood to (e) kitchen, install two split type heatpumps an exhaust fan | $45,000 |
| May 20, 2026 | In progress issued Jun 2026 | 1043 Stockton St | new store front and ada restroom, build new kitchen with new type 1 hood with exhaust fan and make up fan, new ductless heat lampDetails
new store front and ada restroom, build new kitchen with new type 1 hood with exhaust fan and make up fan, new ductless heat lamp | $250,000 |
| Mar 12, 2024 | Completed final sign-off Feb 2025 | 1242 Stockton St | remove extg kitchen floor tile, aprox. 1000 sf per ab-17Details
remove extg kitchen floor tile, aprox. 1000 sf per ab-17 | $2,000 |
| Mar 8, 2024 | Completed final sign-off Oct 2024 | 295 Divisadero St | install general ventilation system, remodel kitchen & bar.Details
install general ventilation system, remodel kitchen & bar. | $150,000 |
| Mar 29, 2023 | Completed final sign-off Sep 2023 | 42 Columbus Av | renovate e kitchen with new hood and equipment. install exhaust fan and makeup unitDetails
renovate e kitchen with new hood and equipment. install exhaust fan and makeup unit | $160,000 |
| Sep 28, 2022 | Completed final sign-off Dec 2022 | 822 Irving St | replace existing kitchen exhaust fan with new for restaurant.Details
replace existing kitchen exhaust fan with new for restaurant. | $6,000 |
| Aug 24, 2021 | Completed final sign-off Apr 2023 | 33 Walter U Lum Pl | change of use & occupancy at basement lvl on walter u. lum place from m-retail to a-2 restaurant. including commercial kitchen, refrigeration units, seating area, storage, and accessibility upgrades. no changes to building facade or structural systems.Details
change of use & occupancy at basement lvl on walter u. lum place from m-retail to a-2 restaurant. including commercial kitchen, refrigeration units, seating area, storage, and accessibility upgrades. no changes to building facade or structural systems. | $400,000 |
| Oct 23, 2019 | Completed final sign-off Mar 2020 | 838 Grant Av | add kitchen equipment plan to current permit 2019-0326-6198 per sfdph request. no other workDetails
add kitchen equipment plan to current permit 2019-0326-6198 per sfdph request. no other work | |
| May 17, 2018 | Never finaled issued Jun 2018, no final | 62 02nd St | add one ada restroom to ground 2nd floor restaurant. change 2nd floor dining space to restaurant administrative space and remove kitchen and multi-stall restroomsDetails
add one ada restroom to ground 2nd floor restaurant. change 2nd floor dining space to restaurant administrative space and remove kitchen and multi-stall restrooms | $26,700 |
| Apr 16, 2018 | Completed final sign-off Apr 2019 | 41 Drumm St | 2nd fl office ti - remodel (e) accessible restroom & kitchenette, voluntary upgrade to full ada complianceDetails
2nd fl office ti - remodel (e) accessible restroom & kitchenette, voluntary upgrade to full ada compliance | $32,000 |
| Oct 13, 2017 | Completed final sign-off Mar 2020 | 838 Grant Av | 6th full floor ti: remodel (e) restaurant. add (3)(n) unisex ada compliant restrooms.first fl remodel elvator loby. no change to structural.upgrade service elevator to ada compliance at each fl. kitchen remodel, mep, fire under separate permit(s).Details
6th full floor ti: remodel (e) restaurant. add (3)(n) unisex ada compliant restrooms.first fl remodel elvator loby. no change to structural.upgrade service elevator to ada compliance at each fl. kitchen remodel, mep, fire under separate permit(s). | $60,000 |
| Oct 10, 2017 | Completed final sign-off Mar 2018 | 2226 29th Av | 2nd fl: remodel kitchen and bath, add 1 full bath. 3rd fl- remodel bath. no exterior work on the building visible to streetDetails
2nd fl: remodel kitchen and bath, add 1 full bath. 3rd fl- remodel bath. no exterior work on the building visible to street | $50,000 |
| Jul 1, 2015 | Completed final sign-off May 2016 | 1368 09th Av | change of use from retail to limit restaurant. modify (e) entrance to comply with ada requirement. remodle kitchen & new ada bathroom.Details
change of use from retail to limit restaurant. modify (e) entrance to comply with ada requirement. remodle kitchen & new ada bathroom. | $130,000 |
| May 12, 2015 | Completed final sign-off Jan 2016 | 728 Pacific Av | #118: demolish existing kitchen exhaust and make up system. install new dusts and fans. maher n/a.Details
#118: demolish existing kitchen exhaust and make up system. install new dusts and fans. maher n/a. | $35,000 |
| Oct 29, 2012 | Completed final sign-off May 2013 | 354 Clement St | remodel 2 restrooms, dining area, kitchen area, change exterior door configuration on 5th ave.Details
remodel 2 restrooms, dining area, kitchen area, change exterior door configuration on 5th ave. | $35,000 |
| Jun 29, 2010 | Completed final sign-off Nov 2010 | 2608 Ocean Av | install kitchen hoods, hood -1, and hood-2 a and b with grease exhaust fans and ductwork. install 1 makeup air supply fan, ref appl #2008.1105.5933 (arch).Details
install kitchen hoods, hood -1, and hood-2 a and b with grease exhaust fans and ductwork. install 1 makeup air supply fan, ref appl #2008.1105.5933 (arch). | $20,000 |