C D R Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Sep 2026
- Last 24 months
- 4 permits filed
61 permits since 2000: 40 completed, 3 in progress, 16 never finaled, 2 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 in progress.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1715 22nd St | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as requireDetails
exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |