Back to bathroom remodel contractors
C D R Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Sep 2026
- Last 24 months
- 4 permits filed
61 permits since 2000: 40 completed, 3 in progress, 16 never finaled, 2 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 10 completed, 3 in progress, 2 expired or cancelled. Typically 12 days from filing to permit and 314 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 29, 2026 | In progress filed Sep 2026, not yet issued | 1715 22nd St | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as requireDetails
exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |
| Sep 18, 2026 | In progress issued Sep 2026 | 1838 Golden Gate Av | kithen and bath renovation. interior renovation,include new finishes, mill work, lighting, electrical, and appliances. new plumbing fixtures new windows in (e) window opening to exterior rear yard some minor non load bearing walls to be removed.Details
kithen and bath renovation. interior renovation,include new finishes, mill work, lighting, electrical, and appliances. new plumbing fixtures new windows in (e) window opening to exterior rear yard some minor non load bearing walls to be removed. | $250,000 |
| Aug 4, 2026 | Completed final sign-off Sep 2026 | 132 Locust St | demo & hauling of old bath tub & change for new walkin shower. plumbing for new shower drain, change existing shower head, shower pan & tiling.Details
demo & hauling of old bath tub & change for new walkin shower. plumbing for new shower drain, change existing shower head, shower pan & tiling. | $6,000 |
| Feb 18, 2026 | In progress issued Feb 2026 | 2051 33rd Av | remodel bathroom in kind, new toilet, shower and tub locations to stay the same, shower pan, new tiles on floor and walls, new lighting 3 cans 1 sconse and 1 new gfi outlet, painting.Details
remodel bathroom in kind, new toilet, shower and tub locations to stay the same, shower pan, new tiles on floor and walls, new lighting 3 cans 1 sconse and 1 new gfi outlet, painting. | $20,000 |
| Sep 1, 2022 | Completed final sign-off Feb 2025 | 1546 46th Av | 324 sqft addition to existing lower level at rear. maximize lower level space to create a master suite with full closet, skylights, and remodel bathroom. remodel (e) laundry room. remove interior column in lower level. create hallway to get from stairs to outside.Details
324 sqft addition to existing lower level at rear. maximize lower level space to create a master suite with full closet, skylights, and remodel bathroom. remodel (e) laundry room. remove interior column in lower level. create hallway to get from stairs to outside. | $75,000 |
| Feb 14, 2022 | Completed final sign-off Feb 2023 | 649 Darien Wy | to remodel a ground floor bathroom, change the tile, the fixtures and waterproof the shower.Details
to remodel a ground floor bathroom, change the tile, the fixtures and waterproof the shower. | $10,000 |
| Aug 15, 2017 | Completed final sign-off Nov 2024 | 1705 Jones St | remodel of (e) basement storage space into studio unit & bathroom. (e) garage door to be relocated & entry way to be rebuilt.Details
remodel of (e) basement storage space into studio unit & bathroom. (e) garage door to be relocated & entry way to be rebuilt. | $50,000 |
| Feb 19, 2016 | Completed final sign-off Sep 2016 | 1333 Columbus Av | bar remodel - bathroom remodel to be ada compliant - work on ground floor only. mep under sep permit. maher naDetails
bar remodel - bathroom remodel to be ada compliant - work on ground floor only. mep under sep permit. maher na | $45,000 |
| Jan 13, 2016 | Completed final sign-off Apr 2016 | 2154 Mission St | replace toilet and sink in bathroom. replace sinks in kitchen and prep area. replace lighting fixtures, paint walls, add stainless steel to hood area. frp to prep area.Details
replace toilet and sink in bathroom. replace sinks in kitchen and prep area. replace lighting fixtures, paint walls, add stainless steel to hood area. frp to prep area. | $10,000 |
| Dec 8, 2014 | Expired or cancelled cancelled Apr 2020 | 8 Octavia St | change of use from (e) vacant commercial to restaurant. new bar, kitchen, seating & accessible unisex bathrooms. plumbing, electrical & lighting work. no structural work. no exterior work to be performed. ** maher: compliance with ordinance no# 155-13 not required **Details
change of use from (e) vacant commercial to restaurant. new bar, kitchen, seating & accessible unisex bathrooms. plumbing, electrical & lighting work. no structural work. no exterior work to be performed. ** maher: compliance with ordinance no# 155-13 not required ** | $250,000 |
| Aug 20, 2013 | Completed final sign-off Mar 2015 | 1790 Page St | to comply with nov 200879069 dated 10/3/2008- remodel masterbath, demolish (e) fixtures & install a new shower, toilet, sink. relocate interior bathroom wall, new title 24 compliant to install lights, outlets & fans. no square footage is being added to the bldg. replace 1 window & add 1 new window.Details
to comply with nov 200879069 dated 10/3/2008- remodel masterbath, demolish (e) fixtures & install a new shower, toilet, sink. relocate interior bathroom wall, new title 24 compliant to install lights, outlets & fans. no square footage is being added to the bldg. replace 1 window & add 1 new window. | $8,500 |
| Mar 1, 2013 | Completed final sign-off Mar 2015 | 1790 Page St | interior alter. of (e) 2nd fl-remodel (e) kitchen, master bedroom & dining area. new closet in master bedroom, new opening & pocket doors in dining area. 3rd fl-remodel (e) kitchen & bathroom. replace 2 windows in kitchen & bathroom. interior wall to be relocated. electrical panels to be replaced.Details
interior alter. of (e) 2nd fl-remodel (e) kitchen, master bedroom & dining area. new closet in master bedroom, new opening & pocket doors in dining area. 3rd fl-remodel (e) kitchen & bathroom. replace 2 windows in kitchen & bathroom. interior wall to be relocated. electrical panels to be replaced. | $55,000 |
| Feb 7, 2013 | Completed final sign-off Jul 2013 | 702 22nd St | interior renovations to existing building including demolition and constructon of interior walls, accessibility upgrades to baths, replacement of bar equipment, installation of built in seating. light fixutres, replacement of skylightsDetails
interior renovations to existing building including demolition and constructon of interior walls, accessibility upgrades to baths, replacement of bar equipment, installation of built in seating. light fixutres, replacement of skylights | $40,000 |
| Dec 27, 2011 | Expired or cancelled cancelled Jan 2026 | 550 Bryant St | at ground fl office: remove existing partitions, install new partitions, beams, install new bath. remove existing rollup door, new exit door.Details
at ground fl office: remove existing partitions, install new partitions, beams, install new bath. remove existing rollup door, new exit door. | $40,000 |
| May 21, 2010 | Completed final sign-off Jun 2011 | 281 Turk St | change of use from locksmith to pharmacy. remodel (e) bath, (n) heating, upgrade (e) electrical, (n) partition walls, replace ceiling tile in (e) grid. (all work @ commercial unit.Details
change of use from locksmith to pharmacy. remodel (e) bath, (n) heating, upgrade (e) electrical, (n) partition walls, replace ceiling tile in (e) grid. (all work @ commercial unit. | $20,000 |