C D R Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2010 to Sep 2026
- Last 24 months
- 4 permits filed
61 permits since 2000: 40 completed, 3 in progress, 16 never finaled, 2 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 2 never finaled. Typically 131 days from filing to permit and 276 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2022 | Completed final sign-off Feb 2025 | 1546 46th Av | 324 sqft addition to existing lower level at rear. maximize lower level space to create a master suite with full closet, skylights, and remodel bathroom. remodel (e) laundry room. remove interior column in lower level. create hallway to get from stairs to outside.Details
324 sqft addition to existing lower level at rear. maximize lower level space to create a master suite with full closet, skylights, and remodel bathroom. remodel (e) laundry room. remove interior column in lower level. create hallway to get from stairs to outside. | $75,000 |
| Sep 18, 2015 | Never finaled issued Jan 2016, no final | 63 Ellis St | 3rd floor -interior work includes, but is not limited to the following: relocation of 3rd floor bar to space between elevator & new stair, extension of 3rd floor dining area into existing kitchen. new occupant laod for all three floors- sffd assembly permitDetails
3rd floor -interior work includes, but is not limited to the following: relocation of 3rd floor bar to space between elevator & new stair, extension of 3rd floor dining area into existing kitchen. new occupant laod for all three floors- sffd assembly permit | $40,000 |
| Feb 12, 2015 | Never finaled issued Apr 2015, no final | 63 Ellis St | work is all barrier removal work. ada requirements. includes 1) nw article 15 special access elev. to access basement thru 3rd flr, 2) construction of nw unisex access restrm on 2nd fl, 3) replacmnt of stair between 2nd & 3rd fl, 4)modify steel beam on 2nd fl. 5)add handrails bet floors met cfc 607Details
work is all barrier removal work. ada requirements. includes 1) nw article 15 special access elev. to access basement thru 3rd flr, 2) construction of nw unisex access restrm on 2nd fl, 3) replacmnt of stair between 2nd & 3rd fl, 4)modify steel beam on 2nd fl. 5)add handrails bet floors met cfc 607 | $75,000 |