Brian Mac Namara Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Mar 2025
- Last 24 months
- 1 permit filed
61 permits since 2000: 53 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 100 days from filing to permit and 558 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2023 | Completed final sign-off Mar 2025 | 165 Edgewood Av | replace exterior stair and roofing. repair roof framingDetails
replace exterior stair and roofing. repair roof framing | $25,000 |
| Feb 8, 2022 | Completed final sign-off Dec 2024 | 2356 Pine St | revision to pa# 202111092130. demoliotion of (e) interior structural columns and stair. new interior construction of structural columns & stair.Details
revision to pa# 202111092130. demoliotion of (e) interior structural columns and stair. new interior construction of structural columns & stair. | $15,000 |
| Dec 21, 2018 | Completed final sign-off Jul 2022 | 2447 Francisco St | horizontal addition. renovate & horizontal addition at rear. new roof terrace, new terrace & stair at rear. 2 new bedrooms, 3 new baths. ** maher: n/a **Details
horizontal addition. renovate & horizontal addition at rear. new roof terrace, new terrace & stair at rear. 2 new bedrooms, 3 new baths. ** maher: n/a ** | $250,000 |
| Nov 6, 2018 | Completed final sign-off Jan 2022 | 335 Marina Bl | horizontal ext. to add 1 car to garage(create 2-car). replace 1-story stair @rear yard.horizontal ext @ middle flr to create powder rm. horizontal/vertical ext @ upper flr to accommodate master suite remodel. remodel beds, baths, family rm, kitchen, laundry & mud rm. **maher n/a**Details
horizontal ext. to add 1 car to garage(create 2-car). replace 1-story stair @rear yard.horizontal ext @ middle flr to create powder rm. horizontal/vertical ext @ upper flr to accommodate master suite remodel. remodel beds, baths, family rm, kitchen, laundry & mud rm. **maher n/a** | $750,000 |
| Apr 11, 2017 | Completed final sign-off Jul 2018 | 12 West Clay St | basement: add 1 family room & 1 bathroom. 1st flr: total remodel & add half bath. 2nd flr: total remodel & add laundry. reconfigure stairs from 2nd to 3rd floor. 3rd flr: total remodel - convert 2 sunrooms to 2 bedrooms. replace windows on all sides of bldg.Details
basement: add 1 family room & 1 bathroom. 1st flr: total remodel & add half bath. 2nd flr: total remodel & add laundry. reconfigure stairs from 2nd to 3rd floor. 3rd flr: total remodel - convert 2 sunrooms to 2 bedrooms. replace windows on all sides of bldg. | $180,000 |
| Aug 22, 2014 | Completed final sign-off Mar 2015 | 36 Palm Av | remove treads and risers for waterproffing. remove (e) front steps. repair water proof membrane and replace existing stairs. maher n/a.Details
remove treads and risers for waterproffing. remove (e) front steps. repair water proof membrane and replace existing stairs. maher n/a. | $5,000 |
| Mar 7, 2014 | Never finaled issued Aug 2014, no final | 553 10th Av | remodel & addition to 1st fl includes (n) kitchen cabinets & counters. (e) appliances to remain. remove (e) brick chimney. (n) rear deck & stairs to yard.Details
remodel & addition to 1st fl includes (n) kitchen cabinets & counters. (e) appliances to remain. remove (e) brick chimney. (n) rear deck & stairs to yard. | $105,000 |
| Nov 9, 2009 | Completed final sign-off Jun 2011 | 38 West Clay St | remodel of (e) residence. remodel & addition to (e) garage. addition of deck to garage roof, remodel of (e) rear yard, addition of retaining wall & new exterior stairsDetails
remodel of (e) residence. remodel & addition to (e) garage. addition of deck to garage roof, remodel of (e) rear yard, addition of retaining wall & new exterior stairs | $500,000 |