Brian Mac Namara Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Mar 2025
- Last 24 months
- 1 permit filed
61 permits since 2000: 53 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 5 completed, 1 never finaled. Typically 134 days from filing to permit and 456 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2021 | Completed final sign-off Feb 2024 | 34 25th Av | remodel (e) kitchen, master bath & 2 guest baths; replace (e) kitchen windows @ side yard; add (n) sliding doors to kitchen @ rear yard; add (n) 24" high rear deck @ kitchenDetails
remodel (e) kitchen, master bath & 2 guest baths; replace (e) kitchen windows @ side yard; add (n) sliding doors to kitchen @ rear yard; add (n) 24" high rear deck @ kitchen | $98,000 |
| Oct 22, 2020 | Completed final sign-off Nov 2020 | 3343 Pierce St | repair existing deck at first floor (leaking tile), less than 50%Details
repair existing deck at first floor (leaking tile), less than 50% | $4,000 |
| Dec 20, 2019 | Completed final sign-off Jun 2024 | 247 15th Av | horizontal addition & new deck @ rear. repair front wood windows. 1st fl: add 1 bed, 1 full bath & family room. 2nd fl: toatal remodel powder room, kitche, living, dining. 3rd fl: total remodel, 2 beds, 3 full baths & laundry. 4th fl: new bed, 1 full bath & roof decksDetails
horizontal addition & new deck @ rear. repair front wood windows. 1st fl: add 1 bed, 1 full bath & family room. 2nd fl: toatal remodel powder room, kitche, living, dining. 3rd fl: total remodel, 2 beds, 3 full baths & laundry. 4th fl: new bed, 1 full bath & roof decks | $250,000 |
| Mar 25, 2015 | Completed final sign-off Mar 2015 | 165 Edgewood Av | replace existing guardrail above detatched garage deckDetails
replace existing guardrail above detatched garage deck | $8,500 |
| Mar 7, 2014 | Never finaled issued Aug 2014, no final | 553 10th Av | remodel & addition to 1st fl includes (n) kitchen cabinets & counters. (e) appliances to remain. remove (e) brick chimney. (n) rear deck & stairs to yard.Details
remodel & addition to 1st fl includes (n) kitchen cabinets & counters. (e) appliances to remain. remove (e) brick chimney. (n) rear deck & stairs to yard. | $105,000 |
| Nov 9, 2009 | Completed final sign-off Jun 2011 | 38 West Clay St | remodel of (e) residence. remodel & addition to (e) garage. addition of deck to garage roof, remodel of (e) rear yard, addition of retaining wall & new exterior stairsDetails
remodel of (e) residence. remodel & addition to (e) garage. addition of deck to garage roof, remodel of (e) rear yard, addition of retaining wall & new exterior stairs | $500,000 |