Back to bathroom remodel contractors
Brian Mac Namara Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Mar 2025
- Last 24 months
- 1 permit filed
61 permits since 2000: 53 completed, 1 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 16 completed. Typically 18 days from filing to permit and 378 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2024 | Completed final sign-off May 2025 | 8 Seacliff Av | interior kitchen & bathroom remodel. add (n) powerder room @ 1st fl; (n) primary bath @ 2nd fl; replace (e) patio @ dining rm; partial exterior stucco & window replacement to address water damage; exterior stucco and windows to be replaced in kindDetails
interior kitchen & bathroom remodel. add (n) powerder room @ 1st fl; (n) primary bath @ 2nd fl; replace (e) patio @ dining rm; partial exterior stucco & window replacement to address water damage; exterior stucco and windows to be replaced in kind | $350,000 |
| May 24, 2023 | Completed final sign-off Apr 2025 | 165 Edgewood Av | conversion of portion of lower level of (e) residence to adu. lowering flr to code reqd clg height. addition of bathroom & efficiency kitchen; (n) adu entry door & window; addition of outdoor open space.Details
conversion of portion of lower level of (e) residence to adu. lowering flr to code reqd clg height. addition of bathroom & efficiency kitchen; (n) adu entry door & window; addition of outdoor open space. | $75,000 |
| Dec 10, 2021 | Completed final sign-off Feb 2024 | 34 25th Av | remodel (e) kitchen, master bath & 2 guest baths; replace (e) kitchen windows @ side yard; add (n) sliding doors to kitchen @ rear yard; add (n) 24" high rear deck @ kitchenDetails
remodel (e) kitchen, master bath & 2 guest baths; replace (e) kitchen windows @ side yard; add (n) sliding doors to kitchen @ rear yard; add (n) 24" high rear deck @ kitchen | $98,000 |
| Oct 22, 2020 | Completed final sign-off Mar 2021 | 1730 Grove St | replace bathroom and kitchen fixtures. bathroom tileDetails
replace bathroom and kitchen fixtures. bathroom tile | $6,000 |
| Oct 20, 2020 | Completed final sign-off Apr 2024 | 3471 Washington St | infill east lightwell at level 1 & level 2 at black neighbor wall. add 2 roof dormers on west side. remodel (e) level 2 kitchen. remove wall between kitchen & dining room. remodel 4 full & 1 half baths. replace (e) windows in kind. wood windows at front. new plumbing, electrical & radiant heat.Details
infill east lightwell at level 1 & level 2 at black neighbor wall. add 2 roof dormers on west side. remodel (e) level 2 kitchen. remove wall between kitchen & dining room. remodel 4 full & 1 half baths. replace (e) windows in kind. wood windows at front. new plumbing, electrical & radiant heat. | $95,000 |
| Dec 20, 2019 | Completed final sign-off Jun 2024 | 247 15th Av | horizontal addition & new deck @ rear. repair front wood windows. 1st fl: add 1 bed, 1 full bath & family room. 2nd fl: toatal remodel powder room, kitche, living, dining. 3rd fl: total remodel, 2 beds, 3 full baths & laundry. 4th fl: new bed, 1 full bath & roof decksDetails
horizontal addition & new deck @ rear. repair front wood windows. 1st fl: add 1 bed, 1 full bath & family room. 2nd fl: toatal remodel powder room, kitche, living, dining. 3rd fl: total remodel, 2 beds, 3 full baths & laundry. 4th fl: new bed, 1 full bath & roof decks | $250,000 |
| Jun 12, 2019 | Completed final sign-off Sep 2020 | 55 25th Av | remodel kitchen, master bath & kids bath, new replacement expansion of (e) basement/crawl space for a bonus room, (e) roof deck new railing **n/a maher**Details
remodel kitchen, master bath & kids bath, new replacement expansion of (e) basement/crawl space for a bonus room, (e) roof deck new railing **n/a maher** | $500,000 |
| Dec 21, 2018 | Completed final sign-off Jul 2022 | 2447 Francisco St | horizontal addition. renovate & horizontal addition at rear. new roof terrace, new terrace & stair at rear. 2 new bedrooms, 3 new baths. ** maher: n/a **Details
horizontal addition. renovate & horizontal addition at rear. new roof terrace, new terrace & stair at rear. 2 new bedrooms, 3 new baths. ** maher: n/a ** | $250,000 |
| Nov 6, 2018 | Completed final sign-off Jan 2022 | 335 Marina Bl | horizontal ext. to add 1 car to garage(create 2-car). replace 1-story stair @rear yard.horizontal ext @ middle flr to create powder rm. horizontal/vertical ext @ upper flr to accommodate master suite remodel. remodel beds, baths, family rm, kitchen, laundry & mud rm. **maher n/a**Details
horizontal ext. to add 1 car to garage(create 2-car). replace 1-story stair @rear yard.horizontal ext @ middle flr to create powder rm. horizontal/vertical ext @ upper flr to accommodate master suite remodel. remodel beds, baths, family rm, kitchen, laundry & mud rm. **maher n/a** | $750,000 |
| Mar 2, 2018 | Completed final sign-off Feb 2019 | 38 West Clay St | expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flrDetails
expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flr | $800,000 |
| Apr 11, 2017 | Completed final sign-off Jul 2018 | 12 West Clay St | basement: add 1 family room & 1 bathroom. 1st flr: total remodel & add half bath. 2nd flr: total remodel & add laundry. reconfigure stairs from 2nd to 3rd floor. 3rd flr: total remodel - convert 2 sunrooms to 2 bedrooms. replace windows on all sides of bldg.Details
basement: add 1 family room & 1 bathroom. 1st flr: total remodel & add half bath. 2nd flr: total remodel & add laundry. reconfigure stairs from 2nd to 3rd floor. 3rd flr: total remodel - convert 2 sunrooms to 2 bedrooms. replace windows on all sides of bldg. | $180,000 |
| Apr 5, 2017 | Completed final sign-off Dec 2017 | 512 10th Av | scope of work is an internal remodel of existing 3 story residence including kitchen, master bedroom, bath, gr lvel. there will be (6) existing windows that will be filled in on the rear/side elevation.Details
scope of work is an internal remodel of existing 3 story residence including kitchen, master bedroom, bath, gr lvel. there will be (6) existing windows that will be filled in on the rear/side elevation. | $200,000 |
| Jun 24, 2016 | Completed final sign-off Dec 2016 | 1617 Lyon St | remodel (e) master bath and hall bath on 3/f. relocate (e) laundry from 1st to 3rd flrDetails
remodel (e) master bath and hall bath on 3/f. relocate (e) laundry from 1st to 3rd flr | $28,000 |
| Jun 17, 2016 | Completed final sign-off Nov 2016 | 3343 Pierce St | remove portion of existing partition between dining room and kitchen. remodel master bath and laundry maher not reqDetails
remove portion of existing partition between dining room and kitchen. remodel master bath and laundry maher not req | $16,000 |
| Dec 7, 2012 | Completed final sign-off Nov 2013 | 140 Jordan Av | foundation replacement & renovation of (e) basement, remodel of 2 (e) bathrooms at 2nd floor. no changes to building, no changes to front of facade. 610 sq ft of basement will be converted to habitable spaceDetails
foundation replacement & renovation of (e) basement, remodel of 2 (e) bathrooms at 2nd floor. no changes to building, no changes to front of facade. 610 sq ft of basement will be converted to habitable space | $160,000 |
| Jun 19, 2012 | Completed final sign-off Oct 2012 | 3625 Baker St | remodel 2 existing bathrooms & 2 existing powder room, new fixtures at same place, new tile, re-finish floor & paint. lighting to comply with cec150(k).Details
remodel 2 existing bathrooms & 2 existing powder room, new fixtures at same place, new tile, re-finish floor & paint. lighting to comply with cec150(k). | $85,000 |