Back to kitchen remodel contractors
Blake Sanford Construction
- Based in
- San Rafael
- On San Francisco permits
- Aug 2011 to Nov 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
23 kitchen remodel permits: 17 completed, 5 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 219 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Jun 2022 | 7 Jennifer Pl | replace kitchen cabinets and countertops- everything same location. replace bathroom tile floor and shower, new waterproof membrane.Details
replace kitchen cabinets and countertops- everything same location. replace bathroom tile floor and shower, new waterproof membrane. | $38,000 |
| Jul 9, 2021 | Completed final sign-off Aug 2021 | 1901 32nd Av | new kitchen cabinets and countertops.Details
new kitchen cabinets and countertops. | $23,000 |
| Mar 11, 2021 | Completed final sign-off May 2021 | 1760 Pacific Av | #2: replace in kind kitchen cabinets and countrtops in existing layout. replace master bathroom shower pan & tile & replace existing bathtub with new, same location.Details
#2: replace in kind kitchen cabinets and countrtops in existing layout. replace master bathroom shower pan & tile & replace existing bathtub with new, same location. | $58,000 |
| Jul 3, 2019 | Completed final sign-off May 2021 | 1960 Vallejo St | exploratory demo @ kitchen/living room/dining/hallway, 5 sq. ft. max @ (2) locations per room, plack back in-kindDetails
exploratory demo @ kitchen/living room/dining/hallway, 5 sq. ft. max @ (2) locations per room, plack back in-kind | $5,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 455 Vallejo St | change out (in same footprint) existing kitchen cabinets, bathroom vanity, and countertops. replace existing faucets and light fixtures and tilework in shower. 56 sq ft kitchen, 45 sq ft bathroom.Details
change out (in same footprint) existing kitchen cabinets, bathroom vanity, and countertops. replace existing faucets and light fixtures and tilework in shower. 56 sq ft kitchen, 45 sq ft bathroom. | $30,000 |
| Dec 14, 2018 | Never finaled issued Dec 2018, no final | 224 Avila St | opening up wall between dining room and kitchen. raise header between dining room and living room and entry hall. n/a for maherDetails
opening up wall between dining room and kitchen. raise header between dining room and living room and entry hall. n/a for maher | $10,000 |
| Nov 13, 2018 | Completed final sign-off May 2021 | 1446 Francisco St | interior remodel to an (e) three-story residence with an (e) garage. g/f: (n) office & mudroom. remodel (e) 3x bathrooms, kitchen and rooms per plans.Details
interior remodel to an (e) three-story residence with an (e) garage. g/f: (n) office & mudroom. remodel (e) 3x bathrooms, kitchen and rooms per plans. | $500,000 |
| Feb 28, 2018 | Never finaled issued Feb 2018, no final | 1855 Sacramento St | replace kitchen cabinets & backsplash, move gas line.Details
replace kitchen cabinets & backsplash, move gas line. | $16,500 |
| Aug 28, 2017 | Completed final sign-off Mar 2021 | 650 Vermont St | interior remodel for extg sfd on the 3rd floor level. remodel scope includes kitchen, bathroom, interior wall removal/replacement with new beam and 2 new windows on the rear bldg facade.Details
interior remodel for extg sfd on the 3rd floor level. remodel scope includes kitchen, bathroom, interior wall removal/replacement with new beam and 2 new windows on the rear bldg facade. | $10,000 |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 950 Columbus Av | new kitchen cabinets installed in same layout. bath #2 - new bathtub, tile surround and mixer valve. bath #1 - remove existing and replace w/ new shower and membrane, tile and mixer valveDetails
new kitchen cabinets installed in same layout. bath #2 - new bathtub, tile surround and mixer valve. bath #1 - remove existing and replace w/ new shower and membrane, tile and mixer valve | $35,000 |
| Apr 27, 2017 | Completed final sign-off Mar 2021 | 648 Vermont St | kitchen reconfiguration and removal of bearing wall. addition of new structural beam and posts at rear windows in-kind.Details
kitchen reconfiguration and removal of bearing wall. addition of new structural beam and posts at rear windows in-kind. | $30,000 |
| Apr 15, 2016 | Completed final sign-off Sep 2018 | 927 Fulton St | install new kitchen countertops and sink and upper cabinets. instatall 3 new toilets. two new bathroom vanities and sinks. retile master batroom shower. no structural work to be done.Details
install new kitchen countertops and sink and upper cabinets. instatall 3 new toilets. two new bathroom vanities and sinks. retile master batroom shower. no structural work to be done. | $18,000 |
| Mar 15, 2016 | Completed final sign-off Mar 2016 | 2390 Post St | kitchen remodel: installating new kitchen cabinets and counter top. non-structural kitchen remodel.Details
kitchen remodel: installating new kitchen cabinets and counter top. non-structural kitchen remodel. | $8,760 |
| Oct 21, 2015 | Never finaled issued Oct 2015, no final | 341 Filbert St | replace kitchen counters & cabinets, kitchen remodel.Details
replace kitchen counters & cabinets, kitchen remodel. | $35,000 |
| Jan 12, 2015 | Completed final sign-off Mar 2015 | 2415 Van Ness Av | replace kitchen cabinets & counter top, install new bath tub/shower mixer valve, & tub surround.Details
replace kitchen cabinets & counter top, install new bath tub/shower mixer valve, & tub surround. | $19,000 |
| Dec 1, 2014 | Completed final sign-off Jun 2015 | 3530 Divisadero St | one kitchen remodel - new cabinetes and countertops, new appliances. compliance with maher ordinance no 155-13 not required.Details
one kitchen remodel - new cabinetes and countertops, new appliances. compliance with maher ordinance no 155-13 not required. | $56,000 |
| Dec 1, 2014 | Completed final sign-off Jun 2015 | 3532 Divisadero St | one kitchen remodel - new cabinetes and countertops, new appliances. compliance with maher ordinance no 155-13 not required.Details
one kitchen remodel - new cabinetes and countertops, new appliances. compliance with maher ordinance no 155-13 not required. | $56,000 |
| Jul 8, 2014 | Never finaled issued Jul 2014, no final | 52 Sharon St | kitchen remodel,new cabinets and marble tops, new range, dish washer, and sink and faucet, no change in floor plan 12x12Details
kitchen remodel,new cabinets and marble tops, new range, dish washer, and sink and faucet, no change in floor plan 12x12 | $36,000 |
| May 12, 2014 | Completed final sign-off Mar 2017 | 1308 California St | top floor unit: interior wall modification at kitchen. to comply with nov 201471681Details
top floor unit: interior wall modification at kitchen. to comply with nov 201471681 | $4,500 |
| May 1, 2014 | Completed final sign-off Mar 2017 | 1308 California St | kitchen - replace base cabinets, island, and uppers and nw sink & garbage disposal. master bathroom - replace existing shower and vanity & sink, existing locations, replace existing pocket door.Details
kitchen - replace base cabinets, island, and uppers and nw sink & garbage disposal. master bathroom - replace existing shower and vanity & sink, existing locations, replace existing pocket door. | $52,000 |
| Apr 2, 2014 | Completed final sign-off Jan 2015 | 2319 Webster St | kitchen remodel, new cabinets and counter tops & appliances, master bathroom remodel, new shower and tub and vanity. lighting & control per cec 150(k).Details
kitchen remodel, new cabinets and counter tops & appliances, master bathroom remodel, new shower and tub and vanity. lighting & control per cec 150(k). | $42,000 |
| Feb 3, 2014 | Expired or cancelled expired Jun 2020 | 2319 Webster St | addition of basement with storage and hobby room, minor modification of existing wall openings. infill of overhung @ kitchen area. no modification to front facade. retention of all existing architectural featuresDetails
addition of basement with storage and hobby room, minor modification of existing wall openings. infill of overhung @ kitchen area. no modification to front facade. retention of all existing architectural features | $90,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2014 | 2415 Van Ness Av | # 506: remodeling kitchen . (maintain fire assemblies)change out kitchen cabinets. microwave circuit.tile bathtub surround and remodel one bathroom except bathtub. new shower/tub mixer valve . no change in opening and wall layout. bathroom to be high efficacy or control by manual on sensor.Details
# 506: remodeling kitchen . (maintain fire assemblies)change out kitchen cabinets. microwave circuit.tile bathtub surround and remodel one bathroom except bathtub. new shower/tub mixer valve . no change in opening and wall layout. bathroom to be high efficacy or control by manual on sensor. | $13,000 |