Back to bathroom remodel contractors
Blake Sanford Construction
- Based in
- San Rafael
- On San Francisco permits
- Aug 2011 to Nov 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 16 completed, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Jun 2022 | 7 Jennifer Pl | replace kitchen cabinets and countertops- everything same location. replace bathroom tile floor and shower, new waterproof membrane.Details
replace kitchen cabinets and countertops- everything same location. replace bathroom tile floor and shower, new waterproof membrane. | $38,000 |
| Mar 11, 2021 | Completed final sign-off May 2021 | 1760 Pacific Av | #2: replace in kind kitchen cabinets and countrtops in existing layout. replace master bathroom shower pan & tile & replace existing bathtub with new, same location.Details
#2: replace in kind kitchen cabinets and countrtops in existing layout. replace master bathroom shower pan & tile & replace existing bathtub with new, same location. | $58,000 |
| Jun 26, 2019 | Completed final sign-off Mar 2021 | 2816 Broderick St | interior remodel of extg 2 story bldg residence include small conversion of extg attached garage partially to conditioned space. adding bath.Details
interior remodel of extg 2 story bldg residence include small conversion of extg attached garage partially to conditioned space. adding bath. | $100,000 |
| May 16, 2019 | Completed final sign-off May 2021 | 1446 Francisco St | interior remodel & small addition to (e) 3 story residence with (e) garage. 2 new bed & 1 new bath.Details
interior remodel & small addition to (e) 3 story residence with (e) garage. 2 new bed & 1 new bath. | $125,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 455 Vallejo St | change out (in same footprint) existing kitchen cabinets, bathroom vanity, and countertops. replace existing faucets and light fixtures and tilework in shower. 56 sq ft kitchen, 45 sq ft bathroom.Details
change out (in same footprint) existing kitchen cabinets, bathroom vanity, and countertops. replace existing faucets and light fixtures and tilework in shower. 56 sq ft kitchen, 45 sq ft bathroom. | $30,000 |
| Nov 13, 2018 | Completed final sign-off May 2021 | 1446 Francisco St | interior remodel to an (e) three-story residence with an (e) garage. g/f: (n) office & mudroom. remodel (e) 3x bathrooms, kitchen and rooms per plans.Details
interior remodel to an (e) three-story residence with an (e) garage. g/f: (n) office & mudroom. remodel (e) 3x bathrooms, kitchen and rooms per plans. | $500,000 |
| Nov 28, 2017 | Never finaled issued Apr 2018, no final | 690 Tennessee St | interior and shell remodel of extg ground floor commercial space. scope includes demo of framing plan, ada upgrades: including new bathroom at commerical level. replace extg foundation. new slab at grade.Details
interior and shell remodel of extg ground floor commercial space. scope includes demo of framing plan, ada upgrades: including new bathroom at commerical level. replace extg foundation. new slab at grade. | $150,000 |
| Aug 28, 2017 | Completed final sign-off Mar 2021 | 650 Vermont St | interior remodel for extg sfd on the 3rd floor level. remodel scope includes kitchen, bathroom, interior wall removal/replacement with new beam and 2 new windows on the rear bldg facade.Details
interior remodel for extg sfd on the 3rd floor level. remodel scope includes kitchen, bathroom, interior wall removal/replacement with new beam and 2 new windows on the rear bldg facade. | $10,000 |
| Aug 25, 2017 | Never finaled issued Aug 2017, no final | 950 Columbus Av | new kitchen cabinets installed in same layout. bath #2 - new bathtub, tile surround and mixer valve. bath #1 - remove existing and replace w/ new shower and membrane, tile and mixer valveDetails
new kitchen cabinets installed in same layout. bath #2 - new bathtub, tile surround and mixer valve. bath #1 - remove existing and replace w/ new shower and membrane, tile and mixer valve | $35,000 |
| Jun 26, 2017 | Expired or cancelled expired Mar 2026 | 694 Tennessee St | shell & core remodel 0f (e) ground floor & basement commercial office space; including (n) elevator & ada bathroom. voluntary seismic strengthening @ top residential floor. mep & elecator under separate permit.Details
shell & core remodel 0f (e) ground floor & basement commercial office space; including (n) elevator & ada bathroom. voluntary seismic strengthening @ top residential floor. mep & elecator under separate permit. | $200,000 |
| Apr 15, 2016 | Completed final sign-off Sep 2018 | 927 Fulton St | install new kitchen countertops and sink and upper cabinets. instatall 3 new toilets. two new bathroom vanities and sinks. retile master batroom shower. no structural work to be done.Details
install new kitchen countertops and sink and upper cabinets. instatall 3 new toilets. two new bathroom vanities and sinks. retile master batroom shower. no structural work to be done. | $18,000 |
| Aug 20, 2015 | Completed final sign-off Dec 2015 | 52 Palm Av | top floor: master bath & guest bath remodel; new shower/tub/toilet to replace (e) in (e) location in master bath. new shower/toilet in guest bath in (e) locations. no framing or new windows/no walls to be moved/no structural. compliance with maher ordinance no 155-13 not required.Details
top floor: master bath & guest bath remodel; new shower/tub/toilet to replace (e) in (e) location in master bath. new shower/toilet in guest bath in (e) locations. no framing or new windows/no walls to be moved/no structural. compliance with maher ordinance no 155-13 not required. | $55,000 |
| Jan 12, 2015 | Completed final sign-off Mar 2015 | 2415 Van Ness Av | replace kitchen cabinets & counter top, install new bath tub/shower mixer valve, & tub surround.Details
replace kitchen cabinets & counter top, install new bath tub/shower mixer valve, & tub surround. | $19,000 |
| Jan 6, 2015 | Never finaled issued Jan 2015, no final | 3025 Broderick St | minor interior partition wall changes to master bath remodel. revision to original pa# 201407080670 (condo unit 3025)Details
minor interior partition wall changes to master bath remodel. revision to original pa# 201407080670 (condo unit 3025) | $50,500 |
| Jul 8, 2014 | Never finaled issued Jul 2014, no final | 3025 Broderick St | complete master bathroom remodel, shower & pan, drop in tub, 2 exhaust fans, new dble sink & vanity, new tile on floors & walls, change out pocket door for higher quality 5x12'Details
complete master bathroom remodel, shower & pan, drop in tub, 2 exhaust fans, new dble sink & vanity, new tile on floors & walls, change out pocket door for higher quality 5x12' | $52,000 |
| Jul 8, 2014 | Completed final sign-off Aug 2014 | 1308 California St | guest bath remodel, new bath tub and valve, new vanity and sink top & faucet, tile tub surround. revision to pa#201405014679 9'x5'Details
guest bath remodel, new bath tub and valve, new vanity and sink top & faucet, tile tub surround. revision to pa#201405014679 9'x5' | $18,000 |
| May 15, 2014 | Completed final sign-off Jan 2015 | 2319 Webster St | replace floor joist 1st floor, relocate interior walls to accomodate rooms & closets per plans, add 1st floor powder room, add 2nd floor powder room, & 2nd floor guest bathroom. 1st floor shear walls per engineered drawings. n/a for maher ordinance.Details
replace floor joist 1st floor, relocate interior walls to accomodate rooms & closets per plans, add 1st floor powder room, add 2nd floor powder room, & 2nd floor guest bathroom. 1st floor shear walls per engineered drawings. n/a for maher ordinance. | $128,000 |
| May 1, 2014 | Completed final sign-off Mar 2017 | 1308 California St | kitchen - replace base cabinets, island, and uppers and nw sink & garbage disposal. master bathroom - replace existing shower and vanity & sink, existing locations, replace existing pocket door.Details
kitchen - replace base cabinets, island, and uppers and nw sink & garbage disposal. master bathroom - replace existing shower and vanity & sink, existing locations, replace existing pocket door. | $52,000 |
| Apr 2, 2014 | Completed final sign-off Jan 2015 | 2319 Webster St | kitchen remodel, new cabinets and counter tops & appliances, master bathroom remodel, new shower and tub and vanity. lighting & control per cec 150(k).Details
kitchen remodel, new cabinets and counter tops & appliances, master bathroom remodel, new shower and tub and vanity. lighting & control per cec 150(k). | $42,000 |
| Jan 28, 2014 | Completed final sign-off Mar 2014 | 2415 Van Ness Av | # 506: remodeling kitchen . (maintain fire assemblies)change out kitchen cabinets. microwave circuit.tile bathtub surround and remodel one bathroom except bathtub. new shower/tub mixer valve . no change in opening and wall layout. bathroom to be high efficacy or control by manual on sensor.Details
# 506: remodeling kitchen . (maintain fire assemblies)change out kitchen cabinets. microwave circuit.tile bathtub surround and remodel one bathroom except bathtub. new shower/tub mixer valve . no change in opening and wall layout. bathroom to be high efficacy or control by manual on sensor. | $13,000 |
| Jan 4, 2013 | Completed final sign-off Mar 2014 | 451 Avila St | remodel master bathroom & master closet, move wall to enlarge bathroom. build a new shower pan & enclosure. move toilet, upgrade electrical, tile & dry wall. no habitable space on garage levelDetails
remodel master bathroom & master closet, move wall to enlarge bathroom. build a new shower pan & enclosure. move toilet, upgrade electrical, tile & dry wall. no habitable space on garage level | $28,000 |