Permit GraphShortlistSan Francisco building permits since 2000

Blake Sanford Construction

Contractor license
919822
State license record
Based in
San Rafael
On San Francisco permits
Aug 2011 to Nov 2021
Last 24 months
0 permits filed

53 permits since 2000: 37 completed, 11 never finaled, 5 expired or cancelled.

Of the 11 never-finaled permits, 4 are 5 to 10 years old, 7 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Roof deck permits

AllRoof deck 2Deck 2Stairs 4Kitchen remodel 23Bathroom remodel 21

2 roof deck permits: 2 completed. Typically 163 days from filing to permit and 958 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 21, 2018Completed
final sign-off Mar 2021
650 Vermont Stnew stair penthouse to access a new roof deck w/wind screens&a metal post&cable railing,interior renovate to create a new stair&install one new window in kind w/new alum clad windows on 3/fl at south.replace (e) garage dr.sprinkler upper unit per nfpa 13d under separate permit.
Details
Permit
201806212607
Status
complete
Filed
Jun 21, 2018
Permit issued
Apr 24, 2019
Final sign-off
Mar 9, 2021
Declared cost
$30,000
Address
650 Vermont St

new stair penthouse to access a new roof deck w/wind screens&a metal post&cable railing,interior renovate to create a new stair&install one new window in kind w/new alum clad windows on 3/fl at south.replace (e) garage dr.sprinkler upper unit per nfpa 13d under separate permit.

Open the permit page

$30,000
Oct 5, 2017Completed
final sign-off Mar 2021
650 Vermont Stroof deck (per sfbc ego1) for existing sfr on the 3rd floor of the bldg. remodel scope inclues interior wall and ceiling removal) replacement for (n) exterior stairs to proposed roof deck.
Details
Permit
201710050489
Status
complete
Filed
Oct 5, 2017
Permit issued
Oct 24, 2017
Final sign-off
Mar 9, 2021
Declared cost
$20,000
Address
650 Vermont St

roof deck (per sfbc ego1) for existing sfr on the 3rd floor of the bldg. remodel scope inclues interior wall and ceiling removal) replacement for (n) exterior stairs to proposed roof deck.

Open the permit page

$20,000