Blake Sanford Construction
- Based in
- San Rafael
- On San Francisco permits
- Aug 2011 to Nov 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 37 completed, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 2 completed. Typically 163 days from filing to permit and 958 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 21, 2018 | Completed final sign-off Mar 2021 | 650 Vermont St | new stair penthouse to access a new roof deck w/wind screens&a metal post&cable railing,interior renovate to create a new stair&install one new window in kind w/new alum clad windows on 3/fl at south.replace (e) garage dr.sprinkler upper unit per nfpa 13d under separate permit.Details
new stair penthouse to access a new roof deck w/wind screens&a metal post&cable railing,interior renovate to create a new stair&install one new window in kind w/new alum clad windows on 3/fl at south.replace (e) garage dr.sprinkler upper unit per nfpa 13d under separate permit. | $30,000 |
| Oct 5, 2017 | Completed final sign-off Mar 2021 | 650 Vermont St | roof deck (per sfbc ego1) for existing sfr on the 3rd floor of the bldg. remodel scope inclues interior wall and ceiling removal) replacement for (n) exterior stairs to proposed roof deck.Details
roof deck (per sfbc ego1) for existing sfr on the 3rd floor of the bldg. remodel scope inclues interior wall and ceiling removal) replacement for (n) exterior stairs to proposed roof deck. | $20,000 |