Block 0798, lot 016
927 Fulton St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 4
- Units
- 4
- Rooms
- 7 bedrooms, 7 bathrooms
- Building
- 4,525 sq ft
- Lot
- 2,265 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 11, 2025 | In progress filed Jul 2025, not yet issued | 927 Fulton St | wrought iron handrailing for exterior staircase going from the street level to the second and third floor of the building is to be reaplced with new wrong iron handrailing that matches the current design and look as much as is possible, including design elements.Details
wrought iron handrailing for exterior staircase going from the street level to the second and third floor of the building is to be reaplced with new wrong iron handrailing that matches the current design and look as much as is possible, including design elements. | $15,000 | |
| Sep 6, 2024 | Completed final sign-off Nov 2024 | 927 Fulton St | R Bay Construction, Nails & Wood Builder's Inc | laundry room remodel (in kind) replace (e) cabinets, and washer/dryer in kind, replace (e) window in kind non street facing marvin fiber glass located at rear of building no wall removalDetails
laundry room remodel (in kind) replace (e) cabinets, and washer/dryer in kind, replace (e) window in kind non street facing marvin fiber glass located at rear of building no wall removal | $20,000 |
| Aug 28, 2023 | Completed final sign-off Jul 2024 | 927 Fulton St | E M Pro Construction | replace trim outside of deck, replace siding on deck wall 5 x 80 lft , paint all areas we worked this job is for labor and materials includedDetails
replace trim outside of deck, replace siding on deck wall 5 x 80 lft , paint all areas we worked this job is for labor and materials included | $23,346 |
| Nov 13, 2020 | Completed final sign-off Jan 2021 | 927 Fulton St | Warner Custom Homes Inc. | voluntary sill plate anchoringDetails
voluntary sill plate anchoring | $6,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2018 | 927 Fulton St | Abc Roofing Inc | reroofing. combined roof. complete strip off old roof. reroof it with a layer of 30 lb. paper (asphalt saturated felt), 40 year shingles (certainteed landmark pro) shall be installed. a layer of fiberglass base sheet and a layer of modified bitumen shall be installed.Details
reroofing. combined roof. complete strip off old roof. reroof it with a layer of 30 lb. paper (asphalt saturated felt), 40 year shingles (certainteed landmark pro) shall be installed. a layer of fiberglass base sheet and a layer of modified bitumen shall be installed. | $8,950 |
| Apr 15, 2016 | Completed final sign-off Sep 2018 | 927 Fulton St | Blake Sanford Construction | install new kitchen countertops and sink and upper cabinets. instatall 3 new toilets. two new bathroom vanities and sinks. retile master batroom shower. no structural work to be done.Details
install new kitchen countertops and sink and upper cabinets. instatall 3 new toilets. two new bathroom vanities and sinks. retile master batroom shower. no structural work to be done. | $18,000 |
| Sep 23, 2010 | Completed final sign-off Dec 2010 | 927 Fulton St | separate master bath into 2 bathrooms, adding one vanity, one toilet. (e) tub, shower stall will not change. work on 2nd flDetails
separate master bath into 2 bathrooms, adding one vanity, one toilet. (e) tub, shower stall will not change. work on 2nd fl | $15,000 | |
| Feb 8, 2010 | Completed final sign-off Oct 2010 | 929 Fulton St | revise pa# 2009/08/17/4957 to correct unit where work performed from 931 to 929.Details
revise pa# 2009/08/17/4957 to correct unit where work performed from 931 to 929. | ||
| Aug 17, 2009 | Completed final sign-off Oct 2010 | 931 Fulton St | updating & remodel bathroom relocate (unit 931) one bathroom tub & toilet. new kitchen cabinets, add floating composite wood over concrete patio deck, paint exterior. compt #200914244.Details
updating & remodel bathroom relocate (unit 931) one bathroom tub & toilet. new kitchen cabinets, add floating composite wood over concrete patio deck, paint exterior. compt #200914244. | $40,000 | |
| Jun 15, 2009 | Completed final sign-off Jun 2009 | 931 Fulton St | Distinctive Builders Inc | revision to appl #200906049792 - concrete pad addition w/post base.Details
revision to appl #200906049792 - concrete pad addition w/post base. | $500 |
| Jun 4, 2009 | Completed final sign-off Jul 2009 | 931 Fulton St | Distinctive Builders Inc | repair of foundation & framing.Details
repair of foundation & framing. | $20,000 |
| Nov 27, 2001 | Expired or cancelled expired Mar 2002 | 931 Fulton St | address assignment-additionalDetails
address assignment-additional | ||
| Mar 8, 2001 | Completed final sign-off Mar 2001 | 927 Fulton St | The Window Specialist | rpelace 5 windows in kind on back of house 3rd floorDetails
rpelace 5 windows in kind on back of house 3rd floor | $3,000 |
| Jan 23, 2001 | Completed final sign-off Oct 2001 | 927 Fulton St | On-Site Maintenance | provide plans for inspection/new header above window/change door from bdrm to hallwy for hot wtr tnkDetails
provide plans for inspection/new header above window/change door from bdrm to hallwy for hot wtr tnk | $100 |
| Oct 20, 2000 | Completed final sign-off Aug 2001 | 927 Fulton St | On-Site Maintenance | open up ceiling to skylight -vaulted as per plansDetails
open up ceiling to skylight -vaulted as per plans | $1,000 |
| Jun 28, 2000 | Completed final sign-off Oct 2001 | 927 Fulton St | repairs to rear utility room at 2nd, 3rd & 4th floorsDetails
repairs to rear utility room at 2nd, 3rd & 4th floors | $28,500 | |
| Jun 14, 2000 | Completed final sign-off Oct 2001 | 927 Fulton St | replace beam support in utility roomDetails
replace beam support in utility room | $2,000 | |
| Apr 24, 2000 | Completed final sign-off Oct 2001 | 927 Fulton St | On-Site Maintenance | remodel kitchen and bathroomDetails
remodel kitchen and bathroom | $20,000 |
| Apr 17, 2000 | Expired or cancelled expired Feb 2001 | 931 Fulton St | On-Site Maintenance | revise permit app #9926786Details
revise permit app #9926786 | |
| Feb 15, 2000 | Expired or cancelled expired Jun 2000 | 927 Fulton St | replace rotten wood sunrm flr w/slab footing &wood stud framingDetails
replace rotten wood sunrm flr w/slab footing &wood stud framing | $5,000 | |
| Feb 10, 2000 | Expired or cancelled expired Nov 2000 | 927 Fulton St | reroofingDetails
reroofing | $7,600 | |
| Jan 21, 2000 | Never finaled filed Jan 2000, never issued | 927 Fulton St | upper deck replacement; new window seats; rear wall strengthening; exit door relocation;new bay windDetails
upper deck replacement; new window seats; rear wall strengthening; exit door relocation;new bay wind | $15,000 |