Bevilacqua & Sons
- Based in
- So San Francisco
- On San Francisco permits
- Jan 2000 to Aug 2026
- Last 24 months
- 21 permits filed
467 permits since 2000: 376 completed, 5 in progress, 61 never finaled, 25 expired or cancelled.
Of the 61 never-finaled permits, 4 are 3 to 5 years old, 18 are 5 to 10 years old, 39 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
6 stairs permits: 3 completed, 3 never finaled. Typically 10 days from filing to permit and 62 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 3, 2016 | Never finaled issued Feb 2016, no final | 1 Sutter St | 1st floor - demolition of non-bearing patitoins, stair & partial mezzanine floor, suite to remain unoccupied until a tenant improvement permit is filed - per ab-017. n/a maher ordinanceDetails
1st floor - demolition of non-bearing patitoins, stair & partial mezzanine floor, suite to remain unoccupied until a tenant improvement permit is filed - per ab-017. n/a maher ordinance | $70,000 |
| Nov 20, 2015 | Never finaled issued Dec 2015, no final | 848 Battery St | demolition and selective removal of (e) ceiling construction of new non load bearing partitions doors, door frames, glazing, lighting, millwork and finishes, enclosure of the existing convievience stair that was created on permit 2012-0815-7467.Details
demolition and selective removal of (e) ceiling construction of new non load bearing partitions doors, door frames, glazing, lighting, millwork and finishes, enclosure of the existing convievience stair that was created on permit 2012-0815-7467. | $100,000 |
| Dec 6, 2007 | Never finaled issued Dec 2007, no final | 595 Rhode Island St | improvement to patio areas, landscaping. exterior lighting including removal of (e) deck and construct new concrete stairs, retaining wall, slab on grade and trellis. revision to pa# 2006.04.21.9602Details
improvement to patio areas, landscaping. exterior lighting including removal of (e) deck and construct new concrete stairs, retaining wall, slab on grade and trellis. revision to pa# 2006.04.21.9602 | $20,000 |
| Sep 27, 2005 | Completed final sign-off Nov 2005 | 1377 05th Av | stair repair in back yard less than 50%Details
stair repair in back yard less than 50% | $10,000 |
| Sep 30, 2003 | Completed final sign-off Aug 2004 | 901 Market St | structural demo, structural steel, concrete/fireproofing/rebar/stairs & rails, mech./plumb. seperateDetails
structural demo, structural steel, concrete/fireproofing/rebar/stairs & rails, mech./plumb. seperate | $136,000 |
| Feb 18, 2003 | Completed final sign-off Mar 2003 | 250 Sutter St | demo of (e) internal stair between 5th & 6th floor oficesDetails
demo of (e) internal stair between 5th & 6th floor ofices | $15,000 |