Back to kitchen remodel contractors
B Doyle Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jun 2024
- Last 24 months
- 0 permits filed
30 permits since 2000: 24 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 9 completed. Typically 0 days from filing to permit and 122 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 147 Kingston St | new counter top in kitchen. new backsplash tile install. existing cabinets to remain, existing appliances to remain.Details
new counter top in kitchen. new backsplash tile install. existing cabinets to remain, existing appliances to remain. | $2,500 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 762 23rd Av | relocate kitchen & bathroom on 2nd floor; add new bath & storage on 1st floor; add new rear deck @ 2nd floor; misc new windows.Details
relocate kitchen & bathroom on 2nd floor; add new bath & storage on 1st floor; add new rear deck @ 2nd floor; misc new windows. | $30,000 |
| Nov 28, 2012 | Completed final sign-off Mar 2013 | 680 47th Av | kitchen remodel-new cabinets & appliances, counter tops, new hardwood fl. new wall light fixture locations in dining rm & under cabinet lighting in kitchen, ceiling lighting stay as is. all walls stay as is, no change in wall layout/openingsDetails
kitchen remodel-new cabinets & appliances, counter tops, new hardwood fl. new wall light fixture locations in dining rm & under cabinet lighting in kitchen, ceiling lighting stay as is. all walls stay as is, no change in wall layout/openings | $20,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 779 23rd Av | remodel (e) kitchen and half bathDetails
remodel (e) kitchen and half bath | $12,000 |
| Apr 17, 2012 | Completed final sign-off Oct 2012 | 746 Great Hy | unit #1 -revision to appl #2012.03.19.6346: keep bearing wall between kitchen & hallway, add an moment frame at 3rd floor.Details
unit #1 -revision to appl #2012.03.19.6346: keep bearing wall between kitchen & hallway, add an moment frame at 3rd floor. | $5,000 |
| Mar 19, 2012 | Completed final sign-off Sep 2012 | 746 Great Hy | kitchen remodel. new cabinets, countertops, appliance. bath remodel. update lighting throughout. add sound proofing in ceiling. replacement windows at back bedroomDetails
kitchen remodel. new cabinets, countertops, appliance. bath remodel. update lighting throughout. add sound proofing in ceiling. replacement windows at back bedroom | $40,000 |
| Nov 18, 2011 | Completed final sign-off May 2012 | 2245 18th St | #3 - replace windows (front & side), relocate kitchen & kitchen plumbing, replace cabinets, remove wall between living room & (e) bedroom. replace bathroom fixtures, remove tub & re-tileDetails
#3 - replace windows (front & side), relocate kitchen & kitchen plumbing, replace cabinets, remove wall between living room & (e) bedroom. replace bathroom fixtures, remove tub & re-tile | $35,000 |
| Jan 10, 2011 | Completed final sign-off May 2011 | 64 Delmar St | kitchen remodel: replace cabinets, tile, countertops. reinstall appliances (e). reinstall undercabinet lighting. lighting change must comply cec 150 (k). non structural. no changes to wall door or window.Details
kitchen remodel: replace cabinets, tile, countertops. reinstall appliances (e). reinstall undercabinet lighting. lighting change must comply cec 150 (k). non structural. no changes to wall door or window. | $10,000 |
| Dec 2, 2010 | Completed final sign-off Feb 2011 | 111 Buena Vista Tr | unit #2-remodel 1 kitchen & 2 bathrooms, no structural work, no windows, lighting to changes to comply with cec 150(k)Details
unit #2-remodel 1 kitchen & 2 bathrooms, no structural work, no windows, lighting to changes to comply with cec 150(k) | $20,000 |