Back to bathroom remodel contractors
B Doyle Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jun 2024
- Last 24 months
- 0 permits filed
30 permits since 2000: 24 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2020 | Never finaled issued Feb 2020, no final | 2763 Mcallister St | remodel in-kind 2 bathrooms, 2 bedrooms, kitichen.Details
remodel in-kind 2 bathrooms, 2 bedrooms, kitichen. | $7,000 |
| May 14, 2019 | Completed final sign-off Oct 2019 | 147 Kingston St | existing bathroom remodel - no walls added or removed. no change of existing floor planDetails
existing bathroom remodel - no walls added or removed. no change of existing floor plan | $18,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 762 23rd Av | relocate kitchen & bathroom on 2nd floor; add new bath & storage on 1st floor; add new rear deck @ 2nd floor; misc new windows.Details
relocate kitchen & bathroom on 2nd floor; add new bath & storage on 1st floor; add new rear deck @ 2nd floor; misc new windows. | $30,000 |
| Jul 12, 2012 | Completed final sign-off Sep 2012 | 779 23rd Av | remodel (e) kitchen and half bathDetails
remodel (e) kitchen and half bath | $12,000 |
| Mar 19, 2012 | Completed final sign-off Sep 2012 | 746 Great Hy | kitchen remodel. new cabinets, countertops, appliance. bath remodel. update lighting throughout. add sound proofing in ceiling. replacement windows at back bedroomDetails
kitchen remodel. new cabinets, countertops, appliance. bath remodel. update lighting throughout. add sound proofing in ceiling. replacement windows at back bedroom | $40,000 |
| Nov 18, 2011 | Completed final sign-off May 2012 | 2245 18th St | #3 - replace windows (front & side), relocate kitchen & kitchen plumbing, replace cabinets, remove wall between living room & (e) bedroom. replace bathroom fixtures, remove tub & re-tileDetails
#3 - replace windows (front & side), relocate kitchen & kitchen plumbing, replace cabinets, remove wall between living room & (e) bedroom. replace bathroom fixtures, remove tub & re-tile | $35,000 |
| Dec 2, 2010 | Completed final sign-off Feb 2011 | 111 Buena Vista Tr | unit #2-remodel 1 kitchen & 2 bathrooms, no structural work, no windows, lighting to changes to comply with cec 150(k)Details
unit #2-remodel 1 kitchen & 2 bathrooms, no structural work, no windows, lighting to changes to comply with cec 150(k) | $20,000 |