B Doyle Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jun 2024
- Last 24 months
- 0 permits filed
30 permits since 2000: 24 completed, 1 never finaled, 5 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 1 days from filing to permit and 172 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2018 | Completed final sign-off Jul 2018 | 314 Walnut St | 2/f-add cabinets and bbq to existing deck at rear of house. a4/f -dd cabinets, wine refridgerators, sink, to room at top of house. change interior light fixturesDetails
2/f-add cabinets and bbq to existing deck at rear of house. a4/f -dd cabinets, wine refridgerators, sink, to room at top of house. change interior light fixtures | $23,000 |
| Jul 22, 2013 | Completed final sign-off Jan 2014 | 762 23rd Av | relocate kitchen & bathroom on 2nd floor; add new bath & storage on 1st floor; add new rear deck @ 2nd floor; misc new windows.Details
relocate kitchen & bathroom on 2nd floor; add new bath & storage on 1st floor; add new rear deck @ 2nd floor; misc new windows. | $30,000 |
| Jul 12, 2013 | Completed final sign-off Feb 2014 | 2611 Divisadero St | replace redwood decking material with 1" x 6" ipe decking. replace existing exterior door with new exterior door of same size work. performed to be less than 50%. u factor .4 maxDetails
replace redwood decking material with 1" x 6" ipe decking. replace existing exterior door with new exterior door of same size work. performed to be less than 50%. u factor .4 max | $20,000 |