Aligned Technologies Llc Dba Aligned Dev
- Based in
- San Jose
- On San Francisco permits
- Nov 2017 to Dec 2025
- Last 24 months
- 2 permits filed
33 permits since 2000: 21 completed, 1 in progress, 11 never finaled.
Of the 11 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 2 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2023 | Completed final sign-off Apr 2023 | 145 Bernard St | rear external staircase repair in kind 40%Details
rear external staircase repair in kind 40% | $25,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 706 Kearny St | replace (e) plm and lighting fixtures new floor and wall tile in bathrooms, new stair flooring, new kitchen countertop, new handrails at stairs, new infill partitions at (e) wall opening, new hallway flooring.Details
replace (e) plm and lighting fixtures new floor and wall tile in bathrooms, new stair flooring, new kitchen countertop, new handrails at stairs, new infill partitions at (e) wall opening, new hallway flooring. | $130,000 |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 668 Clay St | replace existing plumbing anbd lighting fixtures. new floor and wall tile in baths. new stair flooring. new kitchen countertop. new rated partitions and doors at e stairs, new handrails at stairs new hallway flooringDetails
replace existing plumbing anbd lighting fixtures. new floor and wall tile in baths. new stair flooring. new kitchen countertop. new rated partitions and doors at e stairs, new handrails at stairs new hallway flooring | $400,000 |