Back to kitchen remodel contractors
Aligned Technologies Llc Dba Aligned Dev
- Based in
- San Jose
- On San Francisco permits
- Nov 2017 to Dec 2025
- Last 24 months
- 2 permits filed
33 permits since 2000: 21 completed, 1 in progress, 11 never finaled.
Of the 11 never-finaled permits, 3 are 3 to 5 years old, 8 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 2 never finaled. Typically 1 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 26, 2023 | Never finaled issued Jan 2023, no final | 1111 Jones St | unit #2: one kitchen and one bath remodel: in kind. upgrade unit electricalDetails
unit #2: one kitchen and one bath remodel: in kind. upgrade unit electrical | $31,500 |
| Sep 7, 2022 | Never finaled issued Sep 2022, no final | 1111 Jones St | kitchen/bath remodel in kind, units #1, 3, 4, 5, 8, 10, 12, 11. upgrade each unit's electrical and building electrical.Details
kitchen/bath remodel in kind, units #1, 3, 4, 5, 8, 10, 12, 11. upgrade each unit's electrical and building electrical. | $210,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 706 Kearny St | replace (e) plm and lighting fixtures new floor and wall tile in bathrooms, new stair flooring, new kitchen countertop, new handrails at stairs, new infill partitions at (e) wall opening, new hallway flooring.Details
replace (e) plm and lighting fixtures new floor and wall tile in bathrooms, new stair flooring, new kitchen countertop, new handrails at stairs, new infill partitions at (e) wall opening, new hallway flooring. | $130,000 |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 668 Clay St | replace existing plumbing anbd lighting fixtures. new floor and wall tile in baths. new stair flooring. new kitchen countertop. new rated partitions and doors at e stairs, new handrails at stairs new hallway flooringDetails
replace existing plumbing anbd lighting fixtures. new floor and wall tile in baths. new stair flooring. new kitchen countertop. new rated partitions and doors at e stairs, new handrails at stairs new hallway flooring | $400,000 |