Alef Construction Corp
- Based in
- San Carlos
- On San Francisco permits
- Oct 2005 to Jul 2025
- Last 24 months
- 1 permit filed
43 permits since 2000: 35 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 111 days from filing to permit and 366 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2019 | Never finaled issued Jul 2019, no final | 2108 Castro St | front stair repair less than 50%Details
front stair repair less than 50% | $1,000 |
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 4126 18th St | to build in kind back egress stairs. the current stairs have wood rot. new footings & size of timber will be changed to meet new code requirements. no work to be preformed to exterior or interior of bldg. no elect. andno plumbing to be performedDetails
to build in kind back egress stairs. the current stairs have wood rot. new footings & size of timber will be changed to meet new code requirements. no work to be preformed to exterior or interior of bldg. no elect. andno plumbing to be performed | $25,000 |
| Feb 3, 2016 | Completed final sign-off Feb 2017 | 1144 Pine St | remove & replace stairs and walkways at court yard inside the building - 4 sides.Details
remove & replace stairs and walkways at court yard inside the building - 4 sides. | $165,000 |
| Oct 25, 2005 | Completed final sign-off Apr 2008 | 1550 Kirkwood Av | add a horizontal&vertical addit'n w/ remodel of(e)home.the addit'n consist 12'6" out the back (north) adn 3'0" to west of property.verticle addition will be a 3/fl addition of master bedrm.the 3/fl will have a small deck w/egress stair to back yard. egress stairs will alllow egress fr 2/fl bedrm.Details
add a horizontal&vertical addit'n w/ remodel of(e)home.the addit'n consist 12'6" out the back (north) adn 3'0" to west of property.verticle addition will be a 3/fl addition of master bedrm.the 3/fl will have a small deck w/egress stair to back yard. egress stairs will alllow egress fr 2/fl bedrm. | $150,000 |