Back to bathroom remodel contractors
Alef Construction Corp
- Based in
- San Carlos
- On San Francisco permits
- Oct 2005 to Jul 2025
- Last 24 months
- 1 permit filed
43 permits since 2000: 35 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 15 completed, 1 never finaled, 3 expired or cancelled. Typically 15 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2021 | Expired or cancelled cancelled May 2025 | 990 Rhode Island St | 1st floor: enclosed existing rear patio to den. add sfolding/sliding door, 2nd floor: - vertical addition - add 3 bedrooms, 2 bathrooms and loft.Details
1st floor: enclosed existing rear patio to den. add sfolding/sliding door, 2nd floor: - vertical addition - add 3 bedrooms, 2 bathrooms and loft. | $120,000 |
| Feb 12, 2021 | Completed final sign-off May 2022 | 340 Baker St | apt #6: to relocate (e) kitchen & bathroom (on 2nd fl). new electrical & plumbing. no fire sprinkler system.Details
apt #6: to relocate (e) kitchen & bathroom (on 2nd fl). new electrical & plumbing. no fire sprinkler system. | $40,000 |
| Dec 31, 2020 | Completed final sign-off Jun 2022 | 340 Baker St | apt# 8: remodel (e) kitchen & bathroom, new lighting in common areas (e) hallways, new elec, ligting & plumbing only in apt. 8 and hallways, no work performed in other areas, building does not have a fire sprinkler systemDetails
apt# 8: remodel (e) kitchen & bathroom, new lighting in common areas (e) hallways, new elec, ligting & plumbing only in apt. 8 and hallways, no work performed in other areas, building does not have a fire sprinkler system | $50,000 |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 2108 Castro St | remodel the back of the house, the (e) bathroom to be relocated, shower will only be installed, west wall wll have a 11'0" nana wall installed, (n) electrical & plumbing only in area of remodelDetails
remodel the back of the house, the (e) bathroom to be relocated, shower will only be installed, west wall wll have a 11'0" nana wall installed, (n) electrical & plumbing only in area of remodel | $95,000 |
| Aug 17, 2018 | Completed final sign-off Oct 2018 | 156 Ripley St | remodel of master bathroom: removal of tub, larger shower, moving toilet (same wall), new vanity & scones, upgradinc recessed lights & fanDetails
remodel of master bathroom: removal of tub, larger shower, moving toilet (same wall), new vanity & scones, upgradinc recessed lights & fan | $20,000 |
| Aug 11, 2017 | Completed final sign-off Jul 2020 | 2106 22nd St | horizontal addition of a bedroom & bathroom. renovate (e) kitchen & bathroom. new outdoor patio. replace (e) furnace.Details
horizontal addition of a bedroom & bathroom. renovate (e) kitchen & bathroom. new outdoor patio. replace (e) furnace. | $250,000 |
| Mar 6, 2017 | Completed final sign-off Oct 2018 | 2108 Castro St | 3rd floor: remodel bathroom. the bathroom will be divided into 2 bathrooms. 1st bathroom will have a shower over tub, toilet and sink. the removal of extg closet in master bedroom. new electrical and plumbing only in (n) bathrooms.Details
3rd floor: remodel bathroom. the bathroom will be divided into 2 bathrooms. 1st bathroom will have a shower over tub, toilet and sink. the removal of extg closet in master bedroom. new electrical and plumbing only in (n) bathrooms. | $15,000 |
| Jul 15, 2016 | Completed final sign-off Jan 2017 | 990 Rhode Island St | relocating interior kitchen & bathroom, eliminating (1) bedroom, adding den, and adding laundry. all work at top unit.Details
relocating interior kitchen & bathroom, eliminating (1) bedroom, adding den, and adding laundry. all work at top unit. | $28,000 |
| May 18, 2016 | Completed final sign-off Jan 2017 | 3207 Market St | to remodel (e) bathrooms, master bthroom will have a shower, a soaking tub, w/c & 2 vanities. 2nd bathroom will have shower over tub, w/c, & single sink vanity, a new sink & faucet to be installed in powder room on 1st floor. new electrical & plumbing in bathrooms only.Details
to remodel (e) bathrooms, master bthroom will have a shower, a soaking tub, w/c & 2 vanities. 2nd bathroom will have shower over tub, w/c, & single sink vanity, a new sink & faucet to be installed in powder room on 1st floor. new electrical & plumbing in bathrooms only. | $20,000 |
| Apr 12, 2016 | Never finaled issued Apr 2016, no final | 715 Baker St | revision to app#201603010921. guest bathroom water closet and shower over tub to be moved from original location. all other areas of work to remain.Details
revision to app#201603010921. guest bathroom water closet and shower over tub to be moved from original location. all other areas of work to remain. | |
| Mar 1, 2016 | Completed final sign-off Jul 2016 | 715 Baker St | to remodel the extg bathroom and to make master bathroom w/closet. new master bathroom will have a shower, water closet with washlet, vanity w/one sink, & walk-in closet. extg bathroom will have shower overtub, w/c & vanity. new elect, lighting, & plumbing in bathroom only.Details
to remodel the extg bathroom and to make master bathroom w/closet. new master bathroom will have a shower, water closet with washlet, vanity w/one sink, & walk-in closet. extg bathroom will have shower overtub, w/c & vanity. new elect, lighting, & plumbing in bathroom only. | $25,000 |
| Apr 29, 2015 | Completed final sign-off Aug 2015 | 340 Baker St | 2nd floor in unit #2,3,& 5: an extg non-bearing wall will be removed to create open floor plan. the new plan will have one bedroom, 1 bathroom, an office, kitchen, living rm, dining room, & hall closet. new elect., & plmbg, insulate wall & replace wood rot.Details
2nd floor in unit #2,3,& 5: an extg non-bearing wall will be removed to create open floor plan. the new plan will have one bedroom, 1 bathroom, an office, kitchen, living rm, dining room, & hall closet. new elect., & plmbg, insulate wall & replace wood rot. | $150,000 |
| Nov 6, 2014 | Completed final sign-off Dec 2014 | 4 Encanto Av | revision to app#201408143802. remodel extg bath.Details
revision to app#201408143802. remodel extg bath. | |
| Jun 9, 2014 | Completed final sign-off Mar 2015 | 2667 21st Av | remodel the extg kitchen and bathroom. a non structural wall be opened between kitchen and dining room, a door leading to a bedroom will be closed. the extg shower will be removed and will become a laundry closet with access from hall way. new electrical/lighting in kitchen, laundry/closet & bthrm.Details
remodel the extg kitchen and bathroom. a non structural wall be opened between kitchen and dining room, a door leading to a bedroom will be closed. the extg shower will be removed and will become a laundry closet with access from hall way. new electrical/lighting in kitchen, laundry/closet & bthrm. | $40,000 |
| Jul 24, 2013 | Completed final sign-off Oct 2013 | 2 Encanto Av | replace cabinets, appliances in kitchen. repair shower and replace vanity in 3rd fl bathroom. refixture and refinish 2 bathrooms on 2nd fl. remove unpermitted partition walls.Details
replace cabinets, appliances in kitchen. repair shower and replace vanity in 3rd fl bathroom. refixture and refinish 2 bathrooms on 2nd fl. remove unpermitted partition walls. | $15,000 |
| Mar 19, 2013 | Completed final sign-off Oct 2013 | 2 Encanto Av | remove illegial, ground floor unit by removing kitchenette and unpermitted partition. construct new bathrooms and partition walls for new bedrooms and family room. reconfigure windows for new room layout.Details
remove illegial, ground floor unit by removing kitchenette and unpermitted partition. construct new bathrooms and partition walls for new bedrooms and family room. reconfigure windows for new room layout. | $40,000 |
| Jul 5, 2011 | Completed final sign-off Aug 2011 | 4323 Pacheco St | bathroom repair, dry rot shower area. new shower stall, new toilet, new vanity, exhaust fan. high efficacy lighting or occupancy sensor.Details
bathroom repair, dry rot shower area. new shower stall, new toilet, new vanity, exhaust fan. high efficacy lighting or occupancy sensor. | $7,500 |
| Aug 7, 2007 | Expired or cancelled expired Jan 2010 | 315 Chenery St | addition to permit #200706194341 repalce existing cabinets kitchen area remove old bathroom toilet & fixture and vanity replace single pane window with double pane vinyl/window same size new furnace gasDetails
addition to permit #200706194341 repalce existing cabinets kitchen area remove old bathroom toilet & fixture and vanity replace single pane window with double pane vinyl/window same size new furnace gas | $9,237 |
| Jun 19, 2007 | Expired or cancelled expired Jan 2010 | 315 Chenery St | water damage to lower unit - need to replace damage floor and sheetrock, replace dry rot wood if any. replace bathroom fixture & toilet w/ low flow toilet.Details
water damage to lower unit - need to replace damage floor and sheetrock, replace dry rot wood if any. replace bathroom fixture & toilet w/ low flow toilet. | $6,800 |