Back to kitchen remodel contractors
Alef Construction Corp
- Based in
- San Carlos
- On San Francisco permits
- Oct 2005 to Jul 2025
- Last 24 months
- 1 permit filed
43 permits since 2000: 35 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 12 completed, 1 expired or cancelled. Typically 15 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2021 | Completed final sign-off May 2022 | 340 Baker St | apt #6: to relocate (e) kitchen & bathroom (on 2nd fl). new electrical & plumbing. no fire sprinkler system.Details
apt #6: to relocate (e) kitchen & bathroom (on 2nd fl). new electrical & plumbing. no fire sprinkler system. | $40,000 |
| Dec 31, 2020 | Completed final sign-off Jun 2022 | 340 Baker St | apt# 8: remodel (e) kitchen & bathroom, new lighting in common areas (e) hallways, new elec, ligting & plumbing only in apt. 8 and hallways, no work performed in other areas, building does not have a fire sprinkler systemDetails
apt# 8: remodel (e) kitchen & bathroom, new lighting in common areas (e) hallways, new elec, ligting & plumbing only in apt. 8 and hallways, no work performed in other areas, building does not have a fire sprinkler system | $50,000 |
| Jan 23, 2020 | Completed final sign-off Jun 2020 | 156 Ripley St | remodel kitchen: install new cabinets, sinks, led lights. remove (e) peninsula, install island.Details
remodel kitchen: install new cabinets, sinks, led lights. remove (e) peninsula, install island. | $75,000 |
| Aug 11, 2017 | Completed final sign-off Jul 2020 | 2106 22nd St | horizontal addition of a bedroom & bathroom. renovate (e) kitchen & bathroom. new outdoor patio. replace (e) furnace.Details
horizontal addition of a bedroom & bathroom. renovate (e) kitchen & bathroom. new outdoor patio. replace (e) furnace. | $250,000 |
| Jul 15, 2016 | Completed final sign-off Jan 2017 | 990 Rhode Island St | relocating interior kitchen & bathroom, eliminating (1) bedroom, adding den, and adding laundry. all work at top unit.Details
relocating interior kitchen & bathroom, eliminating (1) bedroom, adding den, and adding laundry. all work at top unit. | $28,000 |
| Mar 11, 2016 | Completed final sign-off Jan 2017 | 290 Casitas Av | remodel of kitchen - new cabinets, appliances, lighting, plumbing & electrical. o changes to exterior or windows. no changes to any walls.Details
remodel of kitchen - new cabinets, appliances, lighting, plumbing & electrical. o changes to exterior or windows. no changes to any walls. | $15,000 |
| Aug 20, 2015 | Completed final sign-off Sep 2015 | 340 Baker St | 3rd flr, unit 7: remodel unit an (e) non bearing wall removed to create an open plan. (n) plan will have 1 bedrm, 1 bathrom, an ofc, kitchen, living rm, dining rm & hall closet. (n) elect, plumb, insulation will be installed. all wood rot will be repairDetails
3rd flr, unit 7: remodel unit an (e) non bearing wall removed to create an open plan. (n) plan will have 1 bedrm, 1 bathrom, an ofc, kitchen, living rm, dining rm & hall closet. (n) elect, plumb, insulation will be installed. all wood rot will be repair | $40,000 |
| Apr 29, 2015 | Completed final sign-off Aug 2015 | 340 Baker St | 2nd floor in unit #2,3,& 5: an extg non-bearing wall will be removed to create open floor plan. the new plan will have one bedroom, 1 bathroom, an office, kitchen, living rm, dining room, & hall closet. new elect., & plmbg, insulate wall & replace wood rot.Details
2nd floor in unit #2,3,& 5: an extg non-bearing wall will be removed to create open floor plan. the new plan will have one bedroom, 1 bathroom, an office, kitchen, living rm, dining room, & hall closet. new elect., & plmbg, insulate wall & replace wood rot. | $150,000 |
| Aug 14, 2014 | Completed final sign-off Dec 2014 | 4 Encanto Av | move and remodel kitchen, add skylight, demo walls for dining area, replace/add new exterior windows, rearrange risers to 3rd floor.Details
move and remodel kitchen, add skylight, demo walls for dining area, replace/add new exterior windows, rearrange risers to 3rd floor. | $30,000 |
| Jun 9, 2014 | Completed final sign-off Mar 2015 | 2667 21st Av | remodel the extg kitchen and bathroom. a non structural wall be opened between kitchen and dining room, a door leading to a bedroom will be closed. the extg shower will be removed and will become a laundry closet with access from hall way. new electrical/lighting in kitchen, laundry/closet & bthrm.Details
remodel the extg kitchen and bathroom. a non structural wall be opened between kitchen and dining room, a door leading to a bedroom will be closed. the extg shower will be removed and will become a laundry closet with access from hall way. new electrical/lighting in kitchen, laundry/closet & bthrm. | $40,000 |
| Jul 24, 2013 | Completed final sign-off Oct 2013 | 2 Encanto Av | replace cabinets, appliances in kitchen. repair shower and replace vanity in 3rd fl bathroom. refixture and refinish 2 bathrooms on 2nd fl. remove unpermitted partition walls.Details
replace cabinets, appliances in kitchen. repair shower and replace vanity in 3rd fl bathroom. refixture and refinish 2 bathrooms on 2nd fl. remove unpermitted partition walls. | $15,000 |
| Mar 19, 2013 | Completed final sign-off Oct 2013 | 2 Encanto Av | remove illegial, ground floor unit by removing kitchenette and unpermitted partition. construct new bathrooms and partition walls for new bedrooms and family room. reconfigure windows for new room layout.Details
remove illegial, ground floor unit by removing kitchenette and unpermitted partition. construct new bathrooms and partition walls for new bedrooms and family room. reconfigure windows for new room layout. | $40,000 |
| Aug 7, 2007 | Expired or cancelled expired Jan 2010 | 315 Chenery St | addition to permit #200706194341 repalce existing cabinets kitchen area remove old bathroom toilet & fixture and vanity replace single pane window with double pane vinyl/window same size new furnace gasDetails
addition to permit #200706194341 repalce existing cabinets kitchen area remove old bathroom toilet & fixture and vanity replace single pane window with double pane vinyl/window same size new furnace gas | $9,237 |