Block 6611, lot 005
2108 Castro St
- City’s use
- Single Family Residential
- Built
- 1910
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 2,175 sq ft
- Lot
- 2,625 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 14, 2019 | Never finaled issued Jul 2019, no final | 2108 Castro St | Alef Construction Corp | front stair repair less than 50%Details
front stair repair less than 50% | $1,000 |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 2108 Castro St | Alef Construction Corp | remodel the back of the house, the (e) bathroom to be relocated, shower will only be installed, west wall wll have a 11'0" nana wall installed, (n) electrical & plumbing only in area of remodelDetails
remodel the back of the house, the (e) bathroom to be relocated, shower will only be installed, west wall wll have a 11'0" nana wall installed, (n) electrical & plumbing only in area of remodel | $95,000 |
| Dec 13, 2017 | Completed final sign-off Oct 2018 | 2108 Castro St | Alef Construction Corp | revision # 2017-0306-0712. wall moved in master bedrooom required structural engineering for roof support.Details
revision # 2017-0306-0712. wall moved in master bedrooom required structural engineering for roof support. | $4,500 |
| Mar 6, 2017 | Completed final sign-off Oct 2018 | 2108 Castro St | Alef Construction Corp | 3rd floor: remodel bathroom. the bathroom will be divided into 2 bathrooms. 1st bathroom will have a shower over tub, toilet and sink. the removal of extg closet in master bedroom. new electrical and plumbing only in (n) bathrooms.Details
3rd floor: remodel bathroom. the bathroom will be divided into 2 bathrooms. 1st bathroom will have a shower over tub, toilet and sink. the removal of extg closet in master bedroom. new electrical and plumbing only in (n) bathrooms. | $15,000 |
| Oct 28, 2003 | Completed final sign-off Jun 2004 | 2108 Castro St | revision to app #200308283399 and notice of violation replace extg stairs same in kind/rebuild extDetails
revision to app #200308283399 and notice of violation replace extg stairs same in kind/rebuild ext | $26,000 | |
| Aug 28, 2003 | Completed final sign-off Jun 2004 | 2108 Castro St | remove old lath & plaster as needed. remove old elec. & plumb.as needed & replace elec. plumb & instDetails
remove old lath & plaster as needed. remove old elec. & plumb.as needed & replace elec. plumb & inst | $100,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Alef Construction Corp (4)
- Engineers
- M.L. Hicks (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.