Back to kitchen remodel contractors
Ace Drilling & Excavation
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Aug 2026
- Last 24 months
- 5 permits filed
235 permits since 2000: 148 completed, 6 in progress, 45 never finaled, 36 expired or cancelled.
Of the 45 never-finaled permits, 10 are 3 to 5 years old, 20 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 9 completed, 1 in progress, 2 never finaled, 1 expired or cancelled. Typically 161 days from filing to permit and 324 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2025 | In progress issued Nov 2025 | 452 Fair Oaks St | scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition.Details
scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition. | $300,000 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 2512 Quint St | remodel kitchen & bathroom in-kindDetails
remodel kitchen & bathroom in-kind | $15,000 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 559 Alvarado St | relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylightsDetails
relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylights | $600,000 |
| Mar 2, 2018 | Completed final sign-off Feb 2019 | 38 West Clay St | expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flrDetails
expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flr | $800,000 |
| Feb 23, 2018 | Completed final sign-off May 2023 | 4363 26th St | vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck.Details
vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck. | $650,000 |
| Jul 10, 2015 | Completed final sign-off Feb 2018 | 1126 Dolores St | extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor.Details
extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor. | $200,000 |
| Aug 12, 2013 | Never finaled issued Jul 2023, no final | 42 Homestead St | add 1 dwelling unit to single fam dwg, seismic upgrade, horiz addition at all 3 floor, vertical addition of raising 3/f roof, 4 new baths, 1 new kitchen, 1 kitchen remodel 3 new bedroomsDetails
add 1 dwelling unit to single fam dwg, seismic upgrade, horiz addition at all 3 floor, vertical addition of raising 3/f roof, 4 new baths, 1 new kitchen, 1 kitchen remodel 3 new bedrooms | $310,000 |
| May 21, 2013 | Completed final sign-off Nov 2017 | 3756 22nd St | new horizontal addition at rear. new garage below first level, new interior stair to garage, renovate existing kitchen at second level, renovate existing bath at second level, new bedroom, bathroom and property line windows at third level.Details
new horizontal addition at rear. new garage below first level, new interior stair to garage, renovate existing kitchen at second level, renovate existing bath at second level, new bedroom, bathroom and property line windows at third level. | $125,000 |
| Jul 16, 2012 | Completed final sign-off Jul 2013 | 321 San Carlos St | no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4".Details
no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4". | $200,000 |
| May 3, 2012 | Completed final sign-off Mar 2013 | 3300 Washington St | excavate basement for new bedrm, bath,media & closets and mech. rm. 2 new window wells at washington st side, replace all window with insul. wood window,1 new hydronic heat system and replace old radiant system. new stair from basemt up. reconfigure kitchen and add home office @ entry lvlDetails
excavate basement for new bedrm, bath,media & closets and mech. rm. 2 new window wells at washington st side, replace all window with insul. wood window,1 new hydronic heat system and replace old radiant system. new stair from basemt up. reconfigure kitchen and add home office @ entry lvl | $100,000 |
| Apr 23, 2010 | Expired or cancelled expired Oct 2015 | 3136 Washington St | remodel kitchen, convert dining rm to new office and new full bathrm. replace brick foundation at rear and lower concrete slab approx. 2ft on first fl. new w/d.Details
remodel kitchen, convert dining rm to new office and new full bathrm. replace brick foundation at rear and lower concrete slab approx. 2ft on first fl. new w/d. | $50,000 |
| Aug 26, 2009 | Completed final sign-off Oct 2009 | 4527 Irving St | kitchen & bathroom remdoel, cabinets, tile , sheetrock & appliances. repair roof 200sf. replace counter & cabinets. plumbing fixtures replacement in bathroom & retile walls & floor.Details
kitchen & bathroom remdoel, cabinets, tile , sheetrock & appliances. repair roof 200sf. replace counter & cabinets. plumbing fixtures replacement in bathroom & retile walls & floor. | $9,500 |
| Apr 23, 2007 | Completed final sign-off Feb 2009 | 557 Fillmore St | enlarge existing garage, relocate kitchens and construct new bathrooms. provide laterial load resistant to entire building.Details
enlarge existing garage, relocate kitchens and construct new bathrooms. provide laterial load resistant to entire building. | $90,000 |