Ace Drilling & Excavation
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Aug 2026
- Last 24 months
- 5 permits filed
235 permits since 2000: 148 completed, 6 in progress, 45 never finaled, 36 expired or cancelled.
Of the 45 never-finaled permits, 10 are 3 to 5 years old, 20 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
11 deck permits: 7 completed, 3 never finaled, 1 expired or cancelled. Typically 225 days from filing to permit and 381 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2020 | Expired or cancelled expired Apr 2026 | 1715 Wawona St | add a new deck @southwest side of property. add one master bedroom & bathroom, one family room and full bathroom on basement level. new staircase to connect basement to garage. convert (e) office into (n)guest room @ garage levelDetails
add a new deck @southwest side of property. add one master bedroom & bathroom, one family room and full bathroom on basement level. new staircase to connect basement to garage. convert (e) office into (n)guest room @ garage level | $350,000 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 559 Alvarado St | relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylightsDetails
relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylights | $600,000 |
| Oct 18, 2018 | Completed final sign-off Nov 2019 | 115 Rutledge St | 1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors.Details
1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors. | $35,000 |
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 381 Corbett Av | exploratory demolition work only: work at exterior wood stairs and wood deck to happen in future. remove selected windows for dry rot exploration. investigae soil conditions.Details
exploratory demolition work only: work at exterior wood stairs and wood deck to happen in future. remove selected windows for dry rot exploration. investigae soil conditions. | $3,000 |
| Feb 23, 2018 | Completed final sign-off May 2023 | 4363 26th St | vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck.Details
vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck. | $650,000 |
| May 9, 2017 | Completed final sign-off Apr 2021 | 319 Kensington Wy | excavate basement & 1st floor with bldg envelope, add office & 1/2 bath to basement. create deck at rear of 2nd floor, relocate two bedrooms to 1st floor. remodel ktichen & bathrooms, new stair. no change to bldg envelope or front facade.Details
excavate basement & 1st floor with bldg envelope, add office & 1/2 bath to basement. create deck at rear of 2nd floor, relocate two bedrooms to 1st floor. remodel ktichen & bathrooms, new stair. no change to bldg envelope or front facade. | $100,000 |
| Mar 15, 2016 | Never finaled issued Jan 2018, no final | 381 Corbett Av | horizontal addition of 209 s.f. (family room) at basement. new egress window @ basement. remove (e) rear deck & stairs and replace with new deck & stairs. replace (e) glass sliding door @ first floor.Details
horizontal addition of 209 s.f. (family room) at basement. new egress window @ basement. remove (e) rear deck & stairs and replace with new deck & stairs. replace (e) glass sliding door @ first floor. | $90,000 |
| Apr 2, 2015 | Completed final sign-off Sep 2016 | 1850 Laguna St | excavate basement to create: family room, poweder room ,bathroom and new interior stair connecting to 1st flr. infill underneath (e) deck.Details
excavate basement to create: family room, poweder room ,bathroom and new interior stair connecting to 1st flr. infill underneath (e) deck. | $95,000 |
| Jan 13, 2015 | Completed final sign-off Sep 2016 | 249 Prospect Av | (e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwellDetails
(e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwell | $70,000 |
| Sep 26, 2014 | Completed final sign-off Feb 2016 | 776 Wisconsin St | excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway.Details
excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway. | $350,000 |
| Apr 23, 2008 | Never finaled issued Aug 2012, no final | 1023 Haight St | expand basement into garage. relocate stair, and change configuration of front deck.Details
expand basement into garage. relocate stair, and change configuration of front deck. | $80,000 |