Back to bathroom remodel contractors
Ace Drilling & Excavation
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Aug 2026
- Last 24 months
- 5 permits filed
235 permits since 2000: 148 completed, 6 in progress, 45 never finaled, 36 expired or cancelled.
Of the 45 never-finaled permits, 10 are 3 to 5 years old, 20 are 5 to 10 years old, 15 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 18 completed, 1 in progress, 4 never finaled, 4 expired or cancelled. Typically 132 days from filing to permit and 432 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2025 | In progress issued Nov 2025 | 452 Fair Oaks St | scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition.Details
scope of work includes expanding unit 452 from 2nd fl to the 1st floor & reconfiguring it with 2 beds & two & 1/2 baths,kitchen,dining,library,& living areas,unit 454 reconfigured with 2 beds,3 baths,kitchen & dining room with roof deck & yard access stair,one story rear horizontal addition. | $300,000 |
| Jun 10, 2020 | Expired or cancelled expired Apr 2026 | 1715 Wawona St | add a new deck @southwest side of property. add one master bedroom & bathroom, one family room and full bathroom on basement level. new staircase to connect basement to garage. convert (e) office into (n)guest room @ garage levelDetails
add a new deck @southwest side of property. add one master bedroom & bathroom, one family room and full bathroom on basement level. new staircase to connect basement to garage. convert (e) office into (n)guest room @ garage level | $350,000 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 2512 Quint St | remodel kitchen & bathroom in-kindDetails
remodel kitchen & bathroom in-kind | $15,000 |
| Jan 14, 2020 | Never finaled issued Jan 2020, no final | 68 Cayuga Av | repair partial exterior siding, 300sq ft. repair partial area of roof, 200sq ft. for bath - material in-kind.Details
repair partial exterior siding, 300sq ft. repair partial area of roof, 200sq ft. for bath - material in-kind. | $5,000 |
| Nov 26, 2019 | Completed final sign-off May 2021 | 559 Alvarado St | relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylightsDetails
relocate lower unit to gr fl(2 bedroom, kitchen, living rm, 1 full bath, laundry).2nd unit: 2nd fl, 3 bdrms, 2 full bath, laundry, infill lightwell 3rd fl: kitchen, living rm, office, powder rm,infill lightwell. 4th fl: dormers, workout room, storage, full bath. decks at rear, skylights | $600,000 |
| Oct 31, 2019 | Completed final sign-off Aug 2021 | 248 Colon Av | remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad.Details
remodel 1st fl. add 2 bedrooms, den, 1 full bath & media room, relocate existing stair to connect 1st fl to 2nd fl. lower (e) rear yard to create (n) hardscape. windows to be alum wood clad. | $250,000 |
| Oct 18, 2018 | Completed final sign-off Nov 2019 | 115 Rutledge St | 1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors.Details
1) at 1st floor: horizontal addition beneath extg habitable space. 2) new bathroom at 1st floor. 3)new deck at rear yard. 4)eliminate swing door at garage/hallway. 5)relocae washer/dryer to garage. 6)new windows & exterior doors. | $35,000 |
| Mar 2, 2018 | Completed final sign-off Feb 2019 | 38 West Clay St | expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flrDetails
expansion of (e) basement -444 sq ft to add new bathroo, laundry & family room, scope include remodel of kitchen & powder room, and bath on 2nbd flr | $800,000 |
| Feb 23, 2018 | Completed final sign-off May 2023 | 4363 26th St | vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck.Details
vertical & horizontal additions to include: basement- entry, elevator, wine rm, garage. 1st flr - (4) bdrms, (3) baths, laundry. 2nd fl - living, dining, kitchen, 1/2 bath, decks. 3rd fl - family rm, office bath & deck. | $650,000 |
| Aug 22, 2017 | Expired or cancelled expired Sep 2018 | 313 Castro St | revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl.Details
revision to pa 2017-0501-5342 and 2017-0126-7992 - add laundry rm. on 2/f, add (2) (n) bathrooms in 3rd fl. add a retaining wall at the front of 1st fl. | $15,000 |
| May 9, 2017 | Completed final sign-off Apr 2021 | 319 Kensington Wy | excavate basement & 1st floor with bldg envelope, add office & 1/2 bath to basement. create deck at rear of 2nd floor, relocate two bedrooms to 1st floor. remodel ktichen & bathrooms, new stair. no change to bldg envelope or front facade.Details
excavate basement & 1st floor with bldg envelope, add office & 1/2 bath to basement. create deck at rear of 2nd floor, relocate two bedrooms to 1st floor. remodel ktichen & bathrooms, new stair. no change to bldg envelope or front facade. | $100,000 |
| Jul 10, 2015 | Completed final sign-off Feb 2018 | 1126 Dolores St | extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor.Details
extend kitchen into rear yard. remove enclosure @ rear yard. fill in lightwell, below neighbor's window sill. add bedroom, bathroom, storage in basement with access via new interior stair. renovation of master suite on upper floor. | $200,000 |
| Jul 7, 2015 | Completed final sign-off Mar 2019 | 409 Clipper St | partial interior renovation. convert 3rd fl attic to living space, three bedrooms + two baths. rebuild front stair & move forward toward front property line 3'-0". lower (e) basement flr approx. 3'-0".Details
partial interior renovation. convert 3rd fl attic to living space, three bedrooms + two baths. rebuild front stair & move forward toward front property line 3'-0". lower (e) basement flr approx. 3'-0". | $175,357 |
| Apr 2, 2015 | Completed final sign-off Sep 2016 | 1850 Laguna St | excavate basement to create: family room, poweder room ,bathroom and new interior stair connecting to 1st flr. infill underneath (e) deck.Details
excavate basement to create: family room, poweder room ,bathroom and new interior stair connecting to 1st flr. infill underneath (e) deck. | $95,000 |
| Jan 13, 2015 | Completed final sign-off Sep 2016 | 249 Prospect Av | (e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwellDetails
(e) basement add new family room and a full bathroom. excavation of underground to create a new garage. no increase to mass or height. addition by excavation only. conversion of deck to lightwell | $70,000 |
| Sep 26, 2014 | Completed final sign-off Feb 2016 | 776 Wisconsin St | excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway.Details
excavate basement reconfigure front entry & add one additoinal vehicle parking space, add family room, wine cellar and bathroom. add roof deck reconfigure rear deck & interior stairway. | $350,000 |
| Apr 17, 2014 | Completed final sign-off Mar 2019 | 2621 Harrison St | covert 2 story, 2 bedroom, 1 bath residence to 4 story triplex with garage and living space at first floor and 3 flats at upper stories.Details
covert 2 story, 2 bedroom, 1 bath residence to 4 story triplex with garage and living space at first floor and 3 flats at upper stories. | $820,000 |
| Aug 12, 2013 | Never finaled issued Jul 2023, no final | 42 Homestead St | add 1 dwelling unit to single fam dwg, seismic upgrade, horiz addition at all 3 floor, vertical addition of raising 3/f roof, 4 new baths, 1 new kitchen, 1 kitchen remodel 3 new bedroomsDetails
add 1 dwelling unit to single fam dwg, seismic upgrade, horiz addition at all 3 floor, vertical addition of raising 3/f roof, 4 new baths, 1 new kitchen, 1 kitchen remodel 3 new bedrooms | $310,000 |
| May 21, 2013 | Completed final sign-off Nov 2017 | 3756 22nd St | new horizontal addition at rear. new garage below first level, new interior stair to garage, renovate existing kitchen at second level, renovate existing bath at second level, new bedroom, bathroom and property line windows at third level.Details
new horizontal addition at rear. new garage below first level, new interior stair to garage, renovate existing kitchen at second level, renovate existing bath at second level, new bedroom, bathroom and property line windows at third level. | $125,000 |
| Jul 16, 2012 | Completed final sign-off Jul 2013 | 321 San Carlos St | no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4".Details
no exterior work, interior remodel of sfd, includes remodel kitchen, bathroom, excavation for new foundation, new spiral stairs connecting lower floor & 1st floor. underutilized lower floor square footage will be renovated to be living space with new ceiling hgt of 8'-4". | $200,000 |
| Jun 22, 2012 | Never finaled issued Jul 2012, no final | 137 Granville Wy | revision to 201204037409. revise 1st and 2nd floor plan to include new stair configuration . new closet at 2nd flr. revise half bath to full bath on 2nd flr. revise basement plan. relocate retaining wall per plan. revise basement stairs. in fill 2nd fl lightwell. structural revisionsDetails
revision to 201204037409. revise 1st and 2nd floor plan to include new stair configuration . new closet at 2nd flr. revise half bath to full bath on 2nd flr. revise basement plan. relocate retaining wall per plan. revise basement stairs. in fill 2nd fl lightwell. structural revisions | $20,000 |
| May 3, 2012 | Completed final sign-off Mar 2013 | 3300 Washington St | excavate basement for new bedrm, bath,media & closets and mech. rm. 2 new window wells at washington st side, replace all window with insul. wood window,1 new hydronic heat system and replace old radiant system. new stair from basemt up. reconfigure kitchen and add home office @ entry lvlDetails
excavate basement for new bedrm, bath,media & closets and mech. rm. 2 new window wells at washington st side, replace all window with insul. wood window,1 new hydronic heat system and replace old radiant system. new stair from basemt up. reconfigure kitchen and add home office @ entry lvl | $100,000 |
| Dec 2, 2011 | Completed final sign-off Dec 2013 | 3150 Jackson St | remodel garage to expand for 2 car parking, add elevator to basement level from garage. remodel basement to include new habitable space, theater room, storage, wine cellar, new bathroom, laundry & gym room. no exterior workDetails
remodel garage to expand for 2 car parking, add elevator to basement level from garage. remodel basement to include new habitable space, theater room, storage, wine cellar, new bathroom, laundry & gym room. no exterior work | $85,000 |
| Jul 19, 2011 | Expired or cancelled revoked Nov 2011 | 3150 Jackson St | revision to pa#201011124839. reconfigure interior space on all 3-floors. (n) residential elevator to all floors. (n) basement to include 1-guest room, 1-bathroom, gym, entertainment room. expand sub-level garage.Details
revision to pa#201011124839. reconfigure interior space on all 3-floors. (n) residential elevator to all floors. (n) basement to include 1-guest room, 1-bathroom, gym, entertainment room. expand sub-level garage. | $225,000 |
| Aug 26, 2009 | Completed final sign-off Oct 2009 | 4527 Irving St | kitchen & bathroom remdoel, cabinets, tile , sheetrock & appliances. repair roof 200sf. replace counter & cabinets. plumbing fixtures replacement in bathroom & retile walls & floor.Details
kitchen & bathroom remdoel, cabinets, tile , sheetrock & appliances. repair roof 200sf. replace counter & cabinets. plumbing fixtures replacement in bathroom & retile walls & floor. | $9,500 |
| Apr 23, 2007 | Completed final sign-off Feb 2009 | 557 Fillmore St | enlarge existing garage, relocate kitchens and construct new bathrooms. provide laterial load resistant to entire building.Details
enlarge existing garage, relocate kitchens and construct new bathrooms. provide laterial load resistant to entire building. | $90,000 |
| Mar 16, 2007 | Expired or cancelled expired Nov 2009 | 3383 Washington St | enlarge garage door opening from 7'6" to 10-0" in width. add spiral stair from enlarged garage and entry level with mechanical room and bathroom.Details
enlarge garage door opening from 7'6" to 10-0" in width. add spiral stair from enlarged garage and entry level with mechanical room and bathroom. | $5,000 |