Back to bathroom remodel contractors
Ac And Company
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2026
- Last 24 months
- 11 permits filed
321 permits since 2000: 248 completed, 7 in progress, 19 never finaled, 47 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
52 bathroom remodel permits: 42 completed, 1 in progress, 6 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 69 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2026 | Completed final sign-off Apr 2026 | 518 Anza St | 2/f -open walls as needed to allow insulation to be blown in walls and ceiling, bathroom remodel, ceiling fan, circuits, vent in exterior, remove and intsall shut off under sink.Details
2/f -open walls as needed to allow insulation to be blown in walls and ceiling, bathroom remodel, ceiling fan, circuits, vent in exterior, remove and intsall shut off under sink. | $10,000 |
| Feb 1, 2024 | In progress issued Feb 2024 | 2757 23rd St | replace lower unit kitchen, remove existing single full bathroom and create two smaller bathrooms with showers. relocate the laundry (washer/dryer) to hallDetails
replace lower unit kitchen, remove existing single full bathroom and create two smaller bathrooms with showers. relocate the laundry (washer/dryer) to hall | $35,000 |
| Dec 14, 2023 | Completed final sign-off Dec 2023 | 2050 Lyon St | unit 1, remove + provde and install 6 window sash units, 4 on lyon/washington side. 1 in bathroom. 1 in rear bedroom. replacement to be wood/acceptable per code with proper galss rating.Details
unit 1, remove + provde and install 6 window sash units, 4 on lyon/washington side. 1 in bathroom. 1 in rear bedroom. replacement to be wood/acceptable per code with proper galss rating. | $4,800 |
| Dec 14, 2023 | Completed final sign-off May 2024 | 2757 23rd St | 1 kitchen and 1 bathroom remodel. no alteration of wall, window or door.Details
1 kitchen and 1 bathroom remodel. no alteration of wall, window or door. | $50,000 |
| Nov 29, 2023 | Completed final sign-off Sep 2024 | 2050 Lyon St | unit 1: (e) bathroom remodel: extend into (e) closet space to widen shower enclosureDetails
unit 1: (e) bathroom remodel: extend into (e) closet space to widen shower enclosure | $12,000 |
| Apr 14, 2023 | Completed final sign-off Mar 2024 | 4465 Mission St | tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867).Details
tenant improvement new both gender ada bathroom. (abe under separate permit #202212299424, ab3202209304867). | $15,000 |
| Aug 25, 2022 | Completed final sign-off Oct 2022 | 1016 Potrero Av | apts 5 + 6: close up/patch walls 40sf per plumbing repairs in bathroom walls. ref pp20220819623. to comply with complaint 202294026.Details
apts 5 + 6: close up/patch walls 40sf per plumbing repairs in bathroom walls. ref pp20220819623. to comply with complaint 202294026. | $2,700 |
| Jun 16, 2022 | Completed final sign-off Jun 2022 | 4579 Mission St | per nov #202290905 per item #2. to comply with nov. replace bath window frame.Details
per nov #202290905 per item #2. to comply with nov. replace bath window frame. | $700 |
| Dec 29, 2021 | Completed final sign-off Mar 2022 | 2965 Sacramento St | unit 304: remodel one kitchen and one bathroom. provide & install kitchen cabinets with countertop with new fixtures, new bathtub, vanity and associated plumbing- new sub-panel with lights. non structural, in kind.Details
unit 304: remodel one kitchen and one bathroom. provide & install kitchen cabinets with countertop with new fixtures, new bathtub, vanity and associated plumbing- new sub-panel with lights. non structural, in kind. | $38,000 |
| Jul 20, 2021 | Completed final sign-off Aug 2021 | 2965 Sacramento St | unit #102: remodel kitchen and bathroo, provide and install kitchen cabinets with counter top d/w, new fixtures, new bath tops vanity and associated plumbing new sub pannel with can lights thru outDetails
unit #102: remodel kitchen and bathroo, provide and install kitchen cabinets with counter top d/w, new fixtures, new bath tops vanity and associated plumbing new sub pannel with can lights thru out | $38,000 |
| May 14, 2021 | Completed final sign-off Jun 2021 | 2965 Sacramento St | unit 203: remodel one kitchen & one bathroom. provide & install kitchen & cabinets with countertop with new fixture. new bathtub, vanity and associated plumbing. new subpanel with light. non structural.Details
unit 203: remodel one kitchen & one bathroom. provide & install kitchen & cabinets with countertop with new fixture. new bathtub, vanity and associated plumbing. new subpanel with light. non structural. | $38,000 |
| Jan 11, 2021 | Completed final sign-off Jul 2021 | 2825 23rd St | remodel kitchen & bahtroom like for like. new cabinets, countertop, sink, faucet, dish/washer. bathroom - new tub, faucet, toilet.Details
remodel kitchen & bahtroom like for like. new cabinets, countertop, sink, faucet, dish/washer. bathroom - new tub, faucet, toilet. | $39,000 |
| Jan 11, 2021 | Completed final sign-off Mar 2021 | 2965 Sacramento St | unit #205: remodel kitchen & bahtroom. provide 7 install new cabinets, countertop, sink, faucet, new fixtures. bathroom - new tub, vanity, & associated plumbing. new subpanel with can lights throughout.Details
unit #205: remodel kitchen & bahtroom. provide 7 install new cabinets, countertop, sink, faucet, new fixtures. bathroom - new tub, vanity, & associated plumbing. new subpanel with can lights throughout. | $38,000 |
| Oct 1, 2020 | Completed final sign-off Nov 2020 | 2965 Sacramento St | unit 201: remodel kitchen & bathroom, provide/install kitchen cabinets w/countertop, d/w, new fixtures, new bath tub vanity, associated plumbing, new subpanel w/can lights throughoutDetails
unit 201: remodel kitchen & bathroom, provide/install kitchen cabinets w/countertop, d/w, new fixtures, new bath tub vanity, associated plumbing, new subpanel w/can lights throughout | $38,000 |
| Sep 28, 2020 | Completed final sign-off Jan 2021 | 2225 23rd St | bathroom remodel in-kind. demo tub, sink, tiles. install new tub, lav cabinet, new tiles surround. fan unitDetails
bathroom remodel in-kind. demo tub, sink, tiles. install new tub, lav cabinet, new tiles surround. fan unit | $14,000 |
| Jun 29, 2020 | Completed final sign-off Jan 2022 | 637 Masonic Av | remodel kitchen in kind, repair wall dryrot in kitchen & bathroom area. work will be done on 2nd floorDetails
remodel kitchen in kind, repair wall dryrot in kitchen & bathroom area. work will be done on 2nd floor | $15,000 |
| Feb 18, 2020 | Completed final sign-off Apr 2020 | 2050 Lyon St | #2: remodel bathroom: provide & install new toilet, lav sink, tub fixture and tile on floor & wall of tub surround, fan unit. gas water & drain. provide & install new plumbing & electrical for washer dryer in dining room.Details
#2: remodel bathroom: provide & install new toilet, lav sink, tub fixture and tile on floor & wall of tub surround, fan unit. gas water & drain. provide & install new plumbing & electrical for washer dryer in dining room. | $19,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2019 | 881 Guerrero St | in kind remodel kitchen cabinets & skik & countertop- new electric stove. remodel partial bathroom. reconfigure lav sink. electrical and plumbing as needed.Details
in kind remodel kitchen cabinets & skik & countertop- new electric stove. remodel partial bathroom. reconfigure lav sink. electrical and plumbing as needed. | $35,000 |
| May 4, 2018 | Never finaled issued May 2018, no final | 1511 Gough St | replace counter top, replace bath vanity, toilet and tub. paint apartment, replace fan unit if necessary n/a maherDetails
replace counter top, replace bath vanity, toilet and tub. paint apartment, replace fan unit if necessary n/a maher | $25,000 |
| Mar 6, 2018 | Completed final sign-off Apr 2018 | 625 Scott St | unit 303: kitchen remodel, new cabinets, counter top, gas line per stove; bathroom: new toilet & vanity, new bath fan unit. no new wall oralteration of any (e) walls.Details
unit 303: kitchen remodel, new cabinets, counter top, gas line per stove; bathroom: new toilet & vanity, new bath fan unit. no new wall oralteration of any (e) walls. | $15,000 |
| Oct 16, 2017 | Completed final sign-off Nov 2017 | 1514 Washington St | per notice of viol. 201653372 #6, #201652051 #2,201625773 #2, repair, replace provide or repair eletric heaters/trac light fixture per nov. #201625773 #3. provide t and p valve with drain - scrapping per nov #201697161#9, #201625773.. bathroom, remove tub and toilet and lav sink to allow floor toDetails
per notice of viol. 201653372 #6, #201652051 #2,201625773 #2, repair, replace provide or repair eletric heaters/trac light fixture per nov. #201625773 #3. provide t and p valve with drain - scrapping per nov #201697161#9, #201625773.. bathroom, remove tub and toilet and lav sink to allow floor to | $15,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 2543 Larkin St | remodel of kitchen: replace cabinet and countertop, sink, bathroom: replace toilet and lav sink - new plumbing fixtures. no walls moved, removed, added or installed. all (e) layout to remain unchangedDetails
remodel of kitchen: replace cabinet and countertop, sink, bathroom: replace toilet and lav sink - new plumbing fixtures. no walls moved, removed, added or installed. all (e) layout to remain unchanged | $25,000 |
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 1511 Gough St | apt 301: replace kitchen cabinets - replace bath vanity, toilet, new fan unit. paint apartment - rugs & lino & tile on third floor. no structural work.Details
apt 301: replace kitchen cabinets - replace bath vanity, toilet, new fan unit. paint apartment - rugs & lino & tile on third floor. no structural work. | $25,000 |
| Sep 2, 2016 | Completed final sign-off Dec 2016 | 637 Masonic Av | unit #639: bathroom replace tub with shower - add 1 toilet, tile shower surround add 1 lav sink. add washer/dryer unit #637: water closet add 1 lav sink. add 1 washer/dryerDetails
unit #639: bathroom replace tub with shower - add 1 toilet, tile shower surround add 1 lav sink. add washer/dryer unit #637: water closet add 1 lav sink. add 1 washer/dryer | $15,000 |
| Jul 8, 2016 | Completed final sign-off Apr 2017 | 909 Haight St | unit 5: interior renovation in 1 apartment. renovate kitchen, replace bath fixtures, add new shower, expand opening in 1 interior wallDetails
unit 5: interior renovation in 1 apartment. renovate kitchen, replace bath fixtures, add new shower, expand opening in 1 interior wall | $19,000 |
| Apr 7, 2016 | Completed final sign-off Aug 2016 | 2033 Leavenworth St | renovate (e) master bathroom, remove bidet, tile floor, tub surround , reposition toilet, add one sink, add (1) can light over tub, fan unit & two sconces, retile by others. no walls to be added.Details
renovate (e) master bathroom, remove bidet, tile floor, tub surround , reposition toilet, add one sink, add (1) can light over tub, fan unit & two sconces, retile by others. no walls to be added. | $7,500 |
| Oct 23, 2015 | Never finaled issued Nov 2015, no final | 618 Natoma St | unit #3: remodel kitchen and bath in unit 3. replace flooring cabinets, countertop and lighting. replace all windows in unit in kind. replace elec heating units maher not reqDetails
unit #3: remodel kitchen and bath in unit 3. replace flooring cabinets, countertop and lighting. replace all windows in unit in kind. replace elec heating units maher not req | $28,000 |
| Jan 30, 2015 | Completed final sign-off Apr 2015 | 295 Guerrero St | unit #4: install 2 (& remove 1) electrical heaters per title 24, remodel kitchen & install new plumbing per deteriorated condition & add one washer/dryer incl gas line for stove. bath fan unit, remodel bathrm replace (e) tub faucet & replace lab cabinet. per app#201411030595Details
unit #4: install 2 (& remove 1) electrical heaters per title 24, remodel kitchen & install new plumbing per deteriorated condition & add one washer/dryer incl gas line for stove. bath fan unit, remodel bathrm replace (e) tub faucet & replace lab cabinet. per app#201411030595 | $17,000 |
| Dec 5, 2014 | Completed final sign-off Feb 2015 | 21 Oakwood St | remove kitchen wall, remodel kitchen & bathroom.Details
remove kitchen wall, remodel kitchen & bathroom. | $28,000 |
| Jan 15, 2014 | Never finaled issued Jan 2014, no final | 2442 Bryant St | comply with nov #201318131, non structural work, remove kitchen/bath and revert space to storage.Details
comply with nov #201318131, non structural work, remove kitchen/bath and revert space to storage. | $3,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2013 | 225 09th St | #3- bathroom demo as needed, provide & install 20 amp g.f.i. with one receptacle, light fixtures, switch leg at kitchen, level floor and install tile, replace 7 light fixtures with like kind. bathroom: new toilet, lav. sink and shower pan. bathroom lighting shallcomply w/cec150(k)10,Details
#3- bathroom demo as needed, provide & install 20 amp g.f.i. with one receptacle, light fixtures, switch leg at kitchen, level floor and install tile, replace 7 light fixtures with like kind. bathroom: new toilet, lav. sink and shower pan. bathroom lighting shallcomply w/cec150(k)10, | $13,500 |
| Feb 8, 2013 | Never finaled issued Mar 2013, no final | 618 Natoma St | unit #2-remodel kitchen & bathroom, replace flooring, cabinets, countertops & lightingDetails
unit #2-remodel kitchen & bathroom, replace flooring, cabinets, countertops & lighting | $18,000 |
| Sep 20, 2012 | Completed final sign-off May 2013 | 3816 21st St | 1)provide and install one bathroom at 2nd floor in bedroom located at west side. bathroom will have old shower unit, lav sink, toilet, vent one circuit. 2)extg bathroom:replace one toilet, lav sink and tub. reconfigure per owner, provide one circuit and vent.Details
1)provide and install one bathroom at 2nd floor in bedroom located at west side. bathroom will have old shower unit, lav sink, toilet, vent one circuit. 2)extg bathroom:replace one toilet, lav sink and tub. reconfigure per owner, provide one circuit and vent. | $13,500 |
| Sep 11, 2012 | Completed final sign-off Mar 2013 | 306 Brazil Av | comply with nov# 201201221. remove kitchen at attic level. legalize family room, playroom, bathroom, and bedroom at attic level. repair or replace rear stair treads and guardrail as required.Details
comply with nov# 201201221. remove kitchen at attic level. legalize family room, playroom, bathroom, and bedroom at attic level. repair or replace rear stair treads and guardrail as required. | $20,000 |
| Jun 7, 2012 | Completed final sign-off Jul 2012 | 226 Ritch St | bathroom: remove existing tub, toilet and vanity - replace with new shower exclosure, toilet and vanity - replace fan unit.Details
bathroom: remove existing tub, toilet and vanity - replace with new shower exclosure, toilet and vanity - replace fan unit. | $8,500 |
| Jan 9, 2012 | Completed final sign-off May 2012 | 65 Majestic Av | abate to nov #201178073 dated dec 12, 2011 - remodel kitchen & master bathroom at 2nd floor. install full bathroom & laundry at 1st floor. replace stairway in kind.Details
abate to nov #201178073 dated dec 12, 2011 - remodel kitchen & master bathroom at 2nd floor. install full bathroom & laundry at 1st floor. replace stairway in kind. | $42,000 |
| Aug 23, 2011 | Completed final sign-off Oct 2011 | 625 Scott St | unit #503: open walls as needed in kitchen and bathroom for electric and plumbing utility, close up areas using 5/8" type x sheet rock as needed, repl in kind to comply with complaint 201152524 dated 8-9-11 for unit #503 onlyDetails
unit #503: open walls as needed in kitchen and bathroom for electric and plumbing utility, close up areas using 5/8" type x sheet rock as needed, repl in kind to comply with complaint 201152524 dated 8-9-11 for unit #503 only | $750 |
| Feb 22, 2011 | Completed final sign-off Mar 2011 | 1338 48th Av | to comply with physical inspection report # cc-5910. only structural repairs: general building items # 1, # 2, #3. see attached report & legalize two glass block windows at bathroom.Details
to comply with physical inspection report # cc-5910. only structural repairs: general building items # 1, # 2, #3. see attached report & legalize two glass block windows at bathroom. | $4,000 |
| Dec 22, 2009 | Completed final sign-off Feb 2010 | 1251 33rd Av | comply with his nov# 200993800-per complaint #200993800-legalize use of ground level family room & bathroom. remove cabinets & sink, remove direct access from street.Details
comply with his nov# 200993800-per complaint #200993800-legalize use of ground level family room & bathroom. remove cabinets & sink, remove direct access from street. | $6,000 |
| Jul 15, 2009 | Completed final sign-off Aug 2009 | 1266 Treat Av | remodel bathroom. replace with like kind. 1 lav sink, switch location of toilet & tub. replace tub with shower unit. provide & install 1 gfi circuit. sheet rock & tile as needed. tub enclusure.Details
remodel bathroom. replace with like kind. 1 lav sink, switch location of toilet & tub. replace tub with shower unit. provide & install 1 gfi circuit. sheet rock & tile as needed. tub enclusure. | $12,677 |
| Mar 16, 2009 | Completed final sign-off Jul 2009 | 657 Chenery St | replace with like in kind bathtub,lovsink, and toilet in first floor bathroom.Details
replace with like in kind bathtub,lovsink, and toilet in first floor bathroom. | $1,500 |
| Nov 21, 2008 | Expired or cancelled expired Oct 2010 | 790 California St | work @ #15 & #26. remodel 2 kitchen , replace cabinets and sink. new dishwasher small appliance #2. 50% fluorescent lighting. bath: remove & install new lav. sink & toilet and shower enclosure. previous permit cost of addtional kitchens. revision to pa#200807297867.Details
work @ #15 & #26. remodel 2 kitchen , replace cabinets and sink. new dishwasher small appliance #2. 50% fluorescent lighting. bath: remove & install new lav. sink & toilet and shower enclosure. previous permit cost of addtional kitchens. revision to pa#200807297867. | $34,000 |
| Jul 29, 2008 | Completed final sign-off Nov 2008 | 790 California St | wokr @ unit #68, #65, #64, #37 & #25 only. remodel 5 apartments: kitchen - remove & replace (e) kitchen cabinets and sink. install new dish washer & gfi & samll appliance, flourecent lighting. bathroom - remove (e) plumbing fixtures. install new lavatory, toilet &d new shower enclosure & on gfi.Details
wokr @ unit #68, #65, #64, #37 & #25 only. remodel 5 apartments: kitchen - remove & replace (e) kitchen cabinets and sink. install new dish washer & gfi & samll appliance, flourecent lighting. bathroom - remove (e) plumbing fixtures. install new lavatory, toilet &d new shower enclosure & on gfi. | $127,188 |
| May 18, 2007 | Completed final sign-off Sep 2007 | 3575 Fillmore St | unit#102.enlarge kitchen area & remove one non bearing wall to closet. install new subpanel with main feed and addition circuits & outlets. install new k-cabinets w/new sink & faucet, install new bath . lav sink & faucet.Details
unit#102.enlarge kitchen area & remove one non bearing wall to closet. install new subpanel with main feed and addition circuits & outlets. install new k-cabinets w/new sink & faucet, install new bath . lav sink & faucet. | $15,000 |
| Oct 20, 2006 | Completed final sign-off Dec 2006 | 3575 Fillmore St | unit 302 remodel 1 kitchen (new cabinets, lighting, 50/50 flourscent & gfi receptacles. remove 1 non-bearing wall seperating closet & kitchen. remodel 2 bathrooms (new toilet & pedastol/sink).Details
unit 302 remodel 1 kitchen (new cabinets, lighting, 50/50 flourscent & gfi receptacles. remove 1 non-bearing wall seperating closet & kitchen. remodel 2 bathrooms (new toilet & pedastol/sink). | $15,000 |
| Sep 6, 2006 | Expired or cancelled expired Sep 2007 | 2654 22nd St | remodel kitchen, replace cabinets, install new lightings, relocate stove. install new bathroom at 2nd floorDetails
remodel kitchen, replace cabinets, install new lightings, relocate stove. install new bathroom at 2nd floor | $13,000 |
| May 25, 2005 | Completed final sign-off Oct 2005 | 2329 North Point St | new bathroom in existing closet location, new shower, lavatory, toilet. remodel existing bath includDetails
new bathroom in existing closet location, new shower, lavatory, toilet. remodel existing bath includ | $85,000 |
| Mar 8, 2005 | Completed final sign-off Apr 2005 | 4163 23rd St | r/r cabinets. install bathtub,vinyl floor covering in kitchen&bath, 2 gfi.no alterations to doors,..Details
r/r cabinets. install bathtub,vinyl floor covering in kitchen&bath, 2 gfi.no alterations to doors,.. | $12,500 |
| Nov 23, 2004 | Completed final sign-off Dec 2004 | 330 Presidio Av | remove & replace shower pane in rear bathroom on 2nd floor.Details
remove & replace shower pane in rear bathroom on 2nd floor. | $3,500 |
| Apr 20, 2004 | Expired or cancelled expired Jan 2005 | 3541 Sacramento St | remove bath tub/toilet and sink to install new floorDetails
remove bath tub/toilet and sink to install new floor | $7,000 |
| Feb 25, 2004 | Completed final sign-off Oct 2004 | 528 Lawton St | remove and replaced kitchen cabinets and floor. install electric circuits. install bathroom floor.Details
remove and replaced kitchen cabinets and floor. install electric circuits. install bathroom floor. | $16,000 |
| Nov 5, 2003 | Never finaled issued Nov 2003, no final | 1200 Gough St | remove & replace kitchen cabinets & bathroom fixts. install ceramic tile bathrm flr,install new ceilDetails
remove & replace kitchen cabinets & bathroom fixts. install ceramic tile bathrm flr,install new ceil | $5,000 |