Block 1202, lot 001D
625 Scott St
- City’s use
- Multi-Family Residential
- Built
- 1928
- Stories
- 6
- Units
- 42
- Rooms
- 42 bathrooms
- Building
- 30,060 sq ft
- Lot
- 6,750 sq ft
- Zoning
- RM2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2025 | Completed final sign-off Sep 2025 | 625 Scott St | S.F.A-1 Roofing & Maintenance | re-roofing: remove old roof, install 1 layer of nail base, install 1 layer of modified bituman self stick, new flashings. no hot workDetails
re-roofing: remove old roof, install 1 layer of nail base, install 1 layer of modified bituman self stick, new flashings. no hot work | $63,200 |
| Jun 23, 2022 | Completed final sign-off Jul 2022 | 625 Scott St | Commercial Fire Protection Inc | as builts for pa 2021-0506-9951 added correct csfm # to facp equipment legend. added monitoring module to (e) water flow switch; added tamper switch with monitoring module; updated plans showing location of waterflow and tamper as well as equipment legend and system matrixDetails
as builts for pa 2021-0506-9951 added correct csfm # to facp equipment legend. added monitoring module to (e) water flow switch; added tamper switch with monitoring module; updated plans showing location of waterflow and tamper as well as equipment legend and system matrix | |
| May 6, 2021 | Completed final sign-off Jul 2022 | 625 Scott St | Commercial Fire Protection Inc | install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel.Details
install low frequency sounders to meet 75 db at the pillow per sffc section 1103.7.6.1 and replace the existing fire alarm control panel. | $103,200 |
| Mar 3, 2020 | Never finaled issued Mar 2020, no final | 625 Scott St | street spaceDetails
street space | ||
| Jan 6, 2020 | Completed final sign-off Jun 2020 | 625 Scott St | repair of the fire escape steel connections in kindDetails
repair of the fire escape steel connections in kind | $3,500 | |
| Dec 31, 2019 | Never finaled issued Dec 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Dec 10, 2019 | Never finaled issued Jan 2020, no final | 625 Scott St | street spaceDetails
street space | ||
| Nov 20, 2019 | Never finaled issued Nov 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Oct 10, 2019 | Never finaled issued Oct 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Aug 20, 2019 | Never finaled issued Aug 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Aug 2, 2019 | Completed final sign-off Nov 2019 | 625 Scott St | Everest Waterproofing & Restoration Inc. | structural repair of steel beamDetails
structural repair of steel beam | $12,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Jun 18, 2019 | Completed final sign-off Jul 2019 | 625 Scott St | Ac And Company | apt 206: remodel kitchen with new cabinets, countertop, sink, sheetrock. repair per new utilities and tile. no changes to wall configuration.Details
apt 206: remodel kitchen with new cabinets, countertop, sink, sheetrock. repair per new utilities and tile. no changes to wall configuration. | $20,000 |
| May 20, 2019 | Never finaled issued May 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| May 1, 2019 | Never finaled issued May 2019, no final | 625 Scott St | street spaceDetails
street space | ||
| Mar 6, 2018 | Completed final sign-off Apr 2018 | 625 Scott St | Ac And Company | unit 303: kitchen remodel, new cabinets, counter top, gas line per stove; bathroom: new toilet & vanity, new bath fan unit. no new wall oralteration of any (e) walls.Details
unit 303: kitchen remodel, new cabinets, counter top, gas line per stove; bathroom: new toilet & vanity, new bath fan unit. no new wall oralteration of any (e) walls. | $15,000 |
| May 26, 2017 | Completed final sign-off Aug 2017 | 625 Scott St | Ac And Company | kitchen remodel, new cabinets, countertop, sink, sheetrock, repair per new utilities and tile. no change to wall locationsDetails
kitchen remodel, new cabinets, countertop, sink, sheetrock, repair per new utilities and tile. no change to wall locations | $20,000 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 625 Scott St | Tabernus Service Company | apt 306: kitchen remodel: d/w, g/d, m/w. replace fixtures, cabinets, location not moving. bathroom remodel: replace (e) 1 bathroom window. r/r bathroom fixtures: tub,toilet, occ sensors. remove non-weight bearing 1/2 wall h3ftxl6ft. bathroom & kitchen high efficiency light fixtures.Details
apt 306: kitchen remodel: d/w, g/d, m/w. replace fixtures, cabinets, location not moving. bathroom remodel: replace (e) 1 bathroom window. r/r bathroom fixtures: tub,toilet, occ sensors. remove non-weight bearing 1/2 wall h3ftxl6ft. bathroom & kitchen high efficiency light fixtures. | $12,000 |
| Jun 2, 2014 | Completed final sign-off Jul 2014 | 625 Scott St | Sdi Insulation Inc | install r-38 attic insulationover residential - the whole atticDetails
install r-38 attic insulationover residential - the whole attic | $4,500 |
| Mar 21, 2014 | Completed final sign-off Jun 2014 | 625 Scott St | Ac And Company | unit 203:kitchen remodel. new cabinets,counter top sink, tile. electric and plmbg done by others. no windows or no doors on the permit.Details
unit 203:kitchen remodel. new cabinets,counter top sink, tile. electric and plmbg done by others. no windows or no doors on the permit. | $20,000 |
| Apr 23, 2013 | Never finaled issued Apr 2013, no final | 625 Scott St | street spaceDetails
street space | ||
| Feb 21, 2013 | Completed final sign-off Apr 2013 | 625 Scott St | Ac And Company | kitchen remodel: new cabintes counter top, sink, tile, no lighting changesDetails
kitchen remodel: new cabintes counter top, sink, tile, no lighting changes | $9,500 |
| Aug 23, 2011 | Completed final sign-off Oct 2011 | 625 Scott St | Ac And Company | unit #503: open walls as needed in kitchen and bathroom for electric and plumbing utility, close up areas using 5/8" type x sheet rock as needed, repl in kind to comply with complaint 201152524 dated 8-9-11 for unit #503 onlyDetails
unit #503: open walls as needed in kitchen and bathroom for electric and plumbing utility, close up areas using 5/8" type x sheet rock as needed, repl in kind to comply with complaint 201152524 dated 8-9-11 for unit #503 only | $750 |
| Feb 22, 2008 | Never finaled issued Feb 2008, no final | 625 Scott St | sidewalk repairDetails
sidewalk repair | ||
| Feb 23, 2005 | Never finaled issued Feb 2005, no final | 625 Scott St | sidewalk permitDetails
sidewalk permit | ||
| Apr 1, 2003 | Completed final sign-off Aug 2003 | 625 Scott St | Ac And Company | install new kitchen cabinets in #404 & #607. add kitchen utility receptacles in #404 & #607,installDetails
install new kitchen cabinets in #404 & #607. add kitchen utility receptacles in #404 & #607,install | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ac And Company (7), Commercial Fire Protection Inc (2), Everest Waterproofing & Restoration Inc., S.F.A-1 Roofing & Maintenance, Sdi Insulation Inc, Tabernus Service Company
- Engineers
- Albert Urrutia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.