Block 0923, lot 037
2331 North Point St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 4, 2010 | Completed final sign-off Apr 2011 | 2331 North Point St | Jericho Builder | revision to approved app# 201009171076. relocate the furnace and water heater and bathroom at ground floor.Details
revision to approved app# 201009171076. relocate the furnace and water heater and bathroom at ground floor. | |
| Sep 17, 2010 | Completed final sign-off Apr 2011 | 2331 North Point St | Jericho Builder | proposed interior stair from 2nd fl to gr fl. install bedroom,bath at gr flDetails
proposed interior stair from 2nd fl to gr fl. install bedroom,bath at gr fl | $30,000 |
| Jul 17, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | C G Adams Construction | revisionn to pa# 2009.06.17.0632. remove illegal half bathroom at ground floor and convert it to new storage roomDetails
revisionn to pa# 2009.06.17.0632. remove illegal half bathroom at ground floor and convert it to new storage room | |
| Jun 17, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | C G Adams Construction | legalize (e) storage rm and install half bath on ground floorDetails
legalize (e) storage rm and install half bath on ground floor | $5,000 |
| Apr 23, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | C G Adams Construction | 3r report#cc5517. mitigate required separation between garage & upper units. remove undocumented rooms(s) bathroom on ground floor.Details
3r report#cc5517. mitigate required separation between garage & upper units. remove undocumented rooms(s) bathroom on ground floor. | $9,000 |
| Feb 13, 2009 | Completed final sign-off Jul 2009 | 2329 North Point St | C G Adams Construction | change existing window/doors to french doors at rear for all stories on both units install metal balcony at rear 3rd floor. new siding finish at rear.Details
change existing window/doors to french doors at rear for all stories on both units install metal balcony at rear 3rd floor. new siding finish at rear. | $12,000 |
| May 25, 2005 | Completed final sign-off Oct 2005 | 2329 North Point St | Ac And Company | new bathroom in existing closet location, new shower, lavatory, toilet. remodel existing bath includDetails
new bathroom in existing closet location, new shower, lavatory, toilet. remodel existing bath includ | $85,000 |
| Nov 18, 2004 | Completed final sign-off Nov 2004 | 2329 North Point St | A A A General Roofing Co | reroofingDetails
reroofing | $17,000 |
| Sep 10, 2004 | Completed final sign-off Oct 2004 | 2329 North Point St | Ac And Company | remove section of stucco at front facade. repair members. install new stucco app 24 sf. replace 2 stDetails
remove section of stucco at front facade. repair members. install new stucco app 24 sf. replace 2 st | $4,000 |
| Dec 18, 2002 | Expired or cancelled expired Feb 2007 | 2329 North Point St | A B C Window Contractors | install one patio door & one vinyl window in kind into existing frames,no change in size or locatioDetails
install one patio door & one vinyl window in kind into existing frames,no change in size or locatio | $2,800 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.