Jeffrey Dean Broeker
- Listed as
- authorized agent-others, contractor
- Firm
- Richard Avelar &Assoc Reconstr/Dba Recon
- Based in
- Concord
- On San Francisco permits
- Oct 2002 to Sep 2026
195 permits since 2000 (contractor on 195 permits, authorized agent-others on 2 permits): 142 completed, 13 in progress, 28 never finaled, 12 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 195.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 414 12th Av | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace in like kind front elevation siding and rear elevation siding and stucco and repair rear and deck in kind. repair to less 50% of entry stairs. rear deck approximately 20'x25'.Details
remove and replace in like kind front elevation siding and rear elevation siding and stucco and repair rear and deck in kind. repair to less 50% of entry stairs. rear deck approximately 20'x25'. | $495,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 819 Hampshire St | Richard Avelar &Assoc Reconstr/Dba Recon | framing repair exterior walls at mudrooms 2nd, 3rd and 4th floors. (revision to bpa: 202602065416)Details
framing repair exterior walls at mudrooms 2nd, 3rd and 4th floors. (revision to bpa: 202602065416) | $50,000 |
| Jun 8, 2026 | Completed final sign-off Oct 2026 | 292 Juanita Wy | Richard Avelar &Assoc Reconstr/Dba Recon | repair in kind rear deck as needed due to water damage and waterproofing as needed. repair stucco and interior drywall repairs in den and master bedroom. all work is at rear of property and less than 50 %Details
repair in kind rear deck as needed due to water damage and waterproofing as needed. repair stucco and interior drywall repairs in den and master bedroom. all work is at rear of property and less than 50 % | $100,000 |
| May 14, 2026 | Completed final sign-off May 2026 | 62 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | to obtain final inspection for work approved under pa# 202404290957. all work is complete.Details
to obtain final inspection for work approved under pa# 202404290957. all work is complete. | |
| Apr 14, 2026 | Completed final sign-off Apr 2026 | 348 Lombard St | Richard Avelar &Assoc Reconstr/Dba Recon | to obtain final inspection for work approved under pa#202103186807. all work is complete.Details
to obtain final inspection for work approved under pa#202103186807. all work is complete. | |
| Mar 23, 2026 | In progress issued May 2026 | 3747 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | removal and replacemen interior stairs. all new construction will confirm to 2025 cbcDetails
removal and replacemen interior stairs. all new construction will confirm to 2025 cbc | $250,000 |
| Mar 11, 2026 | In progress issued Mar 2026 | 4721 17th St | Richard Avelar &Assoc Reconstr/Dba Recon | replace front and rear stucco in kind like for like. replace deck coatings and railings, on 2 rear decks. install 1 new window at rear elevation and provide interior drywall repairs as needed to complete exterior repairs due to mold. in kindDetails
replace front and rear stucco in kind like for like. replace deck coatings and railings, on 2 rear decks. install 1 new window at rear elevation and provide interior drywall repairs as needed to complete exterior repairs due to mold. in kind | $300,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 3747 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | structural repair from exploratory demo included in pa# 202512091329 (reviewing accuracy of completed scope of 201704144072) interior structural repair only to all floorsDetails
structural repair from exploratory demo included in pa# 202512091329 (reviewing accuracy of completed scope of 201704144072) interior structural repair only to all floors | $75,000 |
| Feb 6, 2026 | In progress issued Mar 2026 | 819 Hampshire St | Richard Avelar &Assoc Reconstr/Dba Recon | repair of (e) multi unit building including exterior cladding, window replacement, rear stair and walkway, structural upgrades, life safety and code compliance improvements and mep repairs. to comply with nov's 201918741, 201960951,and 202031691.Details
repair of (e) multi unit building including exterior cladding, window replacement, rear stair and walkway, structural upgrades, life safety and code compliance improvements and mep repairs. to comply with nov's 201918741, 201960951,and 202031691. | $1,126,000 |
| Dec 9, 2025 | In progress issued Dec 2025 | 3747 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | interior exploratory demo in home. associated with future pa to confirm and review accuracy of 201704144072.Details
interior exploratory demo in home. associated with future pa to confirm and review accuracy of 201704144072. | $30,000 |
| Dec 4, 2025 | In progress issued Mar 2026 | 61 Chula Ln | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace in like kind 900 sqft of lap siding on south (non street facing) elevation. remove and replace 6 windows and 1 door in like kind.Details
remove and replace in like kind 900 sqft of lap siding on south (non street facing) elevation. remove and replace 6 windows and 1 door in like kind. | $75,000 |
| Nov 25, 2025 | In progress issued Dec 2025 | 3747 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | misc. structural repair 2nd floor concrete cap beamDetails
misc. structural repair 2nd floor concrete cap beam | $60,000 |
| Nov 19, 2025 | Completed final sign-off Aug 2026 | 1270 Dolores St | Richard Avelar &Assoc Reconstr/Dba Recon | like for like construction, repair siding and trim deck board repair, prime and paint the entire property, hand rails, repair deck waterproofing insall scaffoldDetails
like for like construction, repair siding and trim deck board repair, prime and paint the entire property, hand rails, repair deck waterproofing insall scaffold | $401,549 |
| Nov 19, 2025 | In progress issued Nov 2025 | 3747 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | existing front and rear deck repair. reroof front and rear deck replacement and relocation of existing roof deck railing assemblies . replacement of existing roof deck pavers and associated waterproofing repairs as required within areas of work.Details
existing front and rear deck repair. reroof front and rear deck replacement and relocation of existing roof deck railing assemblies . replacement of existing roof deck pavers and associated waterproofing repairs as required within areas of work. | $200,000 |
| Jul 21, 2025 | Completed final sign-off Apr 2026 | 60 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | fire damage repairs and restoration of finishes. replace all drywall, replace all recessed can lights and pendant fixtures. replace all bathroom finishes in both units. no adding or removing walls.Details
fire damage repairs and restoration of finishes. replace all drywall, replace all recessed can lights and pendant fixtures. replace all bathroom finishes in both units. no adding or removing walls. | $200,000 |
| Apr 3, 2025 | Completed final sign-off Jan 2026 | 555 Bartlett St | Richard Avelar &Assoc Reconstr/Dba Recon | unit #207: remove & reinstall like in-kind sliding patio door to repair leak. remove & install stucco around patio door. repair finishes like and in-kind replacement. not visible from street.Details
unit #207: remove & reinstall like in-kind sliding patio door to repair leak. remove & install stucco around patio door. repair finishes like and in-kind replacement. not visible from street. | $25,000 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 2711 Octavia St | Richard Avelar &Assoc Reconstr/Dba Recon | unit 103: to comply with nov: 202534023, removal of drywall, insulation and finished flooring as needed to expose the extent of water intrusion damage resulting in needed mold remediation.Details
unit 103: to comply with nov: 202534023, removal of drywall, insulation and finished flooring as needed to expose the extent of water intrusion damage resulting in needed mold remediation. | $15,000 |
| Oct 15, 2024 | In progress issued Jan 2025 | 3747 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | replace like for like facade stucco and wood panelly and remove and reinstall windows with new flashings, remove and reinstall railings pacth and repair interiors as necessary for window work.Details
replace like for like facade stucco and wood panelly and remove and reinstall windows with new flashings, remove and reinstall railings pacth and repair interiors as necessary for window work. | $320,000 |
| Aug 9, 2024 | Completed final sign-off Apr 2026 | 60 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | new dormer at gable roof at rear of property with one new window facing rear yard. new handrail and guardrail at front stair.Details
new dormer at gable roof at rear of property with one new window facing rear yard. new handrail and guardrail at front stair. | $45,000 |
| Aug 5, 2024 | Completed final sign-off Jan 2025 | 831 32nd Av | Richard Avelar &Assoc Reconstr/Dba Recon | revision to pa# 202406215006, updating rail in front and adjusting structural membranes of stair details.Details
revision to pa# 202406215006, updating rail in front and adjusting structural membranes of stair details. | $500 |
| Jul 10, 2024 | Completed final sign-off Jun 2025 | 2610 Post St | Richard Avelar &Assoc Reconstr/Dba Recon | repair water damage & replace finishes on two small side yarddecks, 11x5 and 13x5. remove and reinstall (e) glass guardrails and replace in kind bathroom shower wall finishes and shower bench.Details
repair water damage & replace finishes on two small side yarddecks, 11x5 and 13x5. remove and reinstall (e) glass guardrails and replace in kind bathroom shower wall finishes and shower bench. | $120,000 |
| Jun 21, 2024 | Completed final sign-off Jan 2025 | 831 32nd Av | Richard Avelar &Assoc Reconstr/Dba Recon | entry stair repair like for like replacementDetails
entry stair repair like for like replacement | $25,000 |
| May 2, 2024 | Completed final sign-off Jan 2025 | 831 32nd Av | Richard Avelar &Assoc Reconstr/Dba Recon | stucco remove and replace like for like in kind to repair in leaks. repair entry (street facing) stairs to replace failed waterproofing. replace like for like in kind finishes ; less than 50% of the stairDetails
stucco remove and replace like for like in kind to repair in leaks. repair entry (street facing) stairs to replace failed waterproofing. replace like for like in kind finishes ; less than 50% of the stair | $100,000 |
| Apr 29, 2024 | Completed final sign-off Aug 2024 | 4529 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | front stair repair like to like to provide proper waterproofing detailDetails
front stair repair like to like to provide proper waterproofing detail | $7,000 |
| Apr 29, 2024 | Expired or cancelled expired May 2026 | 62 Carmelita St | Richard Avelar &Assoc Reconstr/Dba Recon | fire damage repair for wall adjacent to 58 carmelita. remove and replace approx 250 sq ft siding and insulation and remove and replace 75 sw ft stucco like and kind.fire damage repair for wall adjacent to 58 carmelita.Details
fire damage repair for wall adjacent to 58 carmelita. remove and replace approx 250 sq ft siding and insulation and remove and replace 75 sw ft stucco like and kind.fire damage repair for wall adjacent to 58 carmelita. | $30,000 |
| Apr 15, 2024 | Completed final sign-off Aug 2024 | 351 Crescent Av | Richard Avelar &Assoc Reconstr/Dba Recon | rev 202310279672- repair and replace in kind less than 50% stucco facade in front, exterior stairs and appx 30sf of (e) landing in kind located @ rearDetails
rev 202310279672- repair and replace in kind less than 50% stucco facade in front, exterior stairs and appx 30sf of (e) landing in kind located @ rear | $25,000 |
| Apr 10, 2024 | In progress issued May 2024 | 425 01st St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and reinstall concrete landscape element to install new lighting fixtures in courtyard. 8 lights in total. in courtyard space.Details
remove and reinstall concrete landscape element to install new lighting fixtures in courtyard. 8 lights in total. in courtyard space. | $50,000 |
| Dec 15, 2023 | In progress issued Jan 2024 | 4529 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | build new ground floor bathroom in existing storage room.Details
build new ground floor bathroom in existing storage room. | $40,000 |
| Oct 27, 2023 | Completed final sign-off Aug 2024 | 351 Crescent Av | Richard Avelar &Assoc Reconstr/Dba Recon | exterior cladding in like kind replacement in rear of property to provide waterproofing repair to foundation wall and misc. interior repairs at surfaces affected by exterior repairs. replace drywall and baseboards in affected areas (interior).Details
exterior cladding in like kind replacement in rear of property to provide waterproofing repair to foundation wall and misc. interior repairs at surfaces affected by exterior repairs. replace drywall and baseboards in affected areas (interior). | $70,000 |
| Oct 4, 2023 | Completed final sign-off Feb 2024 | 630 27th St | Richard Avelar &Assoc Reconstr/Dba Recon | remodel existing kitchen, master bedroom and bathroom, new electrical and plumbing as required.Details
remodel existing kitchen, master bedroom and bathroom, new electrical and plumbing as required. | $90,000 |
| Sep 21, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | renovate guest bathroom and laundry room for the purpose of installing an infrared sauna as per the attached design plans.Details
renovate guest bathroom and laundry room for the purpose of installing an infrared sauna as per the attached design plans. | $80,000 |
| Sep 21, 2023 | Completed final sign-off Jun 2024 | 324 Locust St | Richard Avelar &Assoc Reconstr/Dba Recon | field revisions for structural requirements sheet s2.2, with revised calculations for 202009295392Details
field revisions for structural requirements sheet s2.2, with revised calculations for 202009295392 | |
| Sep 11, 2023 | Completed final sign-off Oct 2023 | 1921 Broderick St | Richard Avelar &Assoc Reconstr/Dba Recon | repair in like and kind water damaged siding and trim at neighbors roof line.Details
repair in like and kind water damaged siding and trim at neighbors roof line. | $29,000 |
| Aug 29, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | primary bathroom renovation, no layout changes. like for like work.Details
primary bathroom renovation, no layout changes. like for like work. | $10,000 |
| Aug 29, 2023 | Completed final sign-off Mar 2024 | 4529 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | revision to bp # 202210124211: remove and replace plywood of south property line.Details
revision to bp # 202210124211: remove and replace plywood of south property line. | $15,000 |
| Jul 19, 2023 | Completed final sign-off Apr 2025 | 101 Lombard St | Richard Avelar &Assoc Reconstr/Dba Recon | demo (e) gunite shell and foam below shell to pool. waterproof podium slab and walls. additional scope to pa# 202203119773Details
demo (e) gunite shell and foam below shell to pool. waterproof podium slab and walls. additional scope to pa# 202203119773 | $300,000 |
| May 31, 2023 | Completed final sign-off Mar 2024 | 4529 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | rev to pa# 2022-1012-4211; remove and replace outside plywood of west property line and north property line.Details
rev to pa# 2022-1012-4211; remove and replace outside plywood of west property line and north property line. | $15,000 |
| May 31, 2023 | Never finaled issued May 2023, no final | 324 Locust St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace like and kind siding and (12) windows and (2) french doors rear of property- non street facing. replace in (e) openings, u <= 0.30Details
remove and replace like and kind siding and (12) windows and (2) french doors rear of property- non street facing. replace in (e) openings, u <= 0.30 | $147,000 |
| Mar 13, 2023 | Completed final sign-off Sep 2024 | 4028 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace like and in-kind all 9 exterior windows and 3 sliding doors to correct water damage from leaking units. remove and replace stucco and siding like and in-kind to properly flash new windows. interior drywall repairs as needed to replace water damaged areas adjacent to windows..Details
remove and replace like and in-kind all 9 exterior windows and 3 sliding doors to correct water damage from leaking units. remove and replace stucco and siding like and in-kind to properly flash new windows. interior drywall repairs as needed to replace water damaged areas adjacent to windows.. | $800,000 |
| Oct 12, 2022 | Completed final sign-off Mar 2024 | 4529 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | replace weaterproofing system: repace in kind windows repair water damaged drywall and tile in master bedroom, media room, bathroom and both second floor bathrooms. also replaced damaged drywall in garage.Details
replace weaterproofing system: repace in kind windows repair water damaged drywall and tile in master bedroom, media room, bathroom and both second floor bathrooms. also replaced damaged drywall in garage. | $2,000,000 |
| Oct 7, 2022 | Completed final sign-off Mar 2024 | 4529 25th St | Richard Avelar &Assoc Reconstr/Dba Recon | demolition to pinpoint sources of water intrusion.Details
demolition to pinpoint sources of water intrusion. | $20,000 |
| Aug 22, 2022 | Completed final sign-off Dec 2022 | 3 Lupine Av | Richard Avelar &Assoc Reconstr/Dba Recon | remove and install stucco and wndow flushings t 6 locations and reflush abd reinstall new sheetmetal head flushings at 6 existing window locations.Details
remove and install stucco and wndow flushings t 6 locations and reflush abd reinstall new sheetmetal head flushings at 6 existing window locations. | $50,000 |
| Apr 27, 2022 | Completed final sign-off Sep 2023 | 2612 Post St | Richard Avelar &Assoc Reconstr/Dba Recon | replacement of french doors at roof deck due to water damage. repairs to deck assembly. exterior cladding and interior finishes.Details
replacement of french doors at roof deck due to water damage. repairs to deck assembly. exterior cladding and interior finishes. | $187,000 |
| Mar 24, 2022 | Expired or cancelled cancelled Jan 2026 | 2653 Union St | Richard Avelar &Assoc Reconstr/Dba Recon | replace (10) front elevation windows in kind.Details
replace (10) front elevation windows in kind. | $109,189 |
| Mar 11, 2022 | Completed final sign-off Mar 2025 | 101 Lombard St | Richard Avelar &Assoc Reconstr/Dba Recon | waterproofing repairs at (e) pool deck, inside pool vault and at roof parapet. garage ceiling repairs. (e) tower roof counterflashing repairs at east & west towers. pool deck/spa waterproofing repairs @ podium & vault.Details
waterproofing repairs at (e) pool deck, inside pool vault and at roof parapet. garage ceiling repairs. (e) tower roof counterflashing repairs at east & west towers. pool deck/spa waterproofing repairs @ podium & vault. | $1,801,722 |
| Feb 17, 2022 | Completed final sign-off Feb 2023 | 85 Park Hill Av | Richard Avelar &Assoc Reconstr/Dba Recon | install steel support for future planter box on existing patio on rear of property.Details
install steel support for future planter box on existing patio on rear of property. | $10,000 |
| Feb 15, 2022 | Never finaled issued Feb 2022, no final | 66 Cleary Ct | Richard Avelar &Assoc Reconstr/Dba Recon | replacing drain & waste piping to the 001, 002, 003, 004, 005, 008 at the property, including units 101 to 1015, 201 to 2015, 301 to 30115, 401 to 4015, 801 to 8015 and 901 to 9015 (90 kitchens total). installing valve and drain box at units 105 to 1015 and 110 to to 1115 (30 laundry areas).Details
replacing drain & waste piping to the 001, 002, 003, 004, 005, 008 at the property, including units 101 to 1015, 201 to 2015, 301 to 30115, 401 to 4015, 801 to 8015 and 901 to 9015 (90 kitchens total). installing valve and drain box at units 105 to 1015 and 110 to to 1115 (30 laundry areas). | $1,500,000 |
| Jan 19, 2022 | Completed final sign-off Mar 2024 | 630 27th St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace like for like stucco, lapsides and wood trim. replace like for like window and sliding door. reroof main roof. replace deck finishes. repair finishes in lower lever jack/jill bathroom.Details
remove and replace like for like stucco, lapsides and wood trim. replace like for like window and sliding door. reroof main roof. replace deck finishes. repair finishes in lower lever jack/jill bathroom. | $550,000 |
| Jan 18, 2022 | Completed final sign-off Mar 2022 | 24 White St | Richard Avelar &Assoc Reconstr/Dba Recon | reroofingDetails
reroofing | $45,000 |
| Jan 10, 2022 | Completed final sign-off Sep 2022 | 24 White St | Richard Avelar &Assoc Reconstr/Dba Recon | replace drywall, bathroom finishes in kind. electrical replacement in kind. repair existing flooring. drywall in 2nd floor bedroom & adjacent wall in master br & portion of cieling of hallway on 1st floor along with 1st floor bathroom below & adjacent drywall locations on 1st floor hallway & bedroomDetails
replace drywall, bathroom finishes in kind. electrical replacement in kind. repair existing flooring. drywall in 2nd floor bedroom & adjacent wall in master br & portion of cieling of hallway on 1st floor along with 1st floor bathroom below & adjacent drywall locations on 1st floor hallway & bedroom | $300,000 |
| Jun 30, 2021 | Completed final sign-off Oct 2023 | 2622 Greenwich St | Richard Avelar &Assoc Reconstr/Dba Recon, Singh Construction | revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0.Details
revision to previous pa# 201610261228 & 201909272891. elevation of a new storage room at the basement level. no lateral or vertical expansion beyond the previously approved foot print. work in area "4" only on a1.0. | $10,000 |
| Jun 15, 2021 | Never finaled issued Jun 2021, no final | 2424 Buchanan St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and reinstall bathroom fixtures. shower and toilet and vanity on 4th floor bath. no change in fixture count. same locations. non structural.Details
remove and reinstall bathroom fixtures. shower and toilet and vanity on 4th floor bath. no change in fixture count. same locations. non structural. | $25,000 |
| Apr 14, 2021 | Completed final sign-off Feb 2023 | 85 Park Hill Av | Richard Avelar &Assoc Reconstr/Dba Recon | replace exterior stucco cladding in kind; repair any dry rot encountered. reuse and reflash existing windowsa and doors.Details
replace exterior stucco cladding in kind; repair any dry rot encountered. reuse and reflash existing windowsa and doors. | $600,000 |
| Mar 18, 2021 | Never finaled issued Mar 2021, no final | 348 Lombard St | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace in kind bahroom fixtures, finishes in 2 bathrooms. 1-f toilet sink and shower. 2-f toilet, sink, tub, shower.Details
remove and replace in kind bahroom fixtures, finishes in 2 bathrooms. 1-f toilet sink and shower. 2-f toilet, sink, tub, shower. | $66,000 |
| Jan 26, 2021 | Never finaled issued Jan 2021, no final | 66 Cleary Ct | Richard Avelar &Assoc Reconstr/Dba Recon | units 107/207/307/407/507/607/707/807/907/1007/1107/1207/1307/1407/1507: replace leaking waste lines in the (e) chase. rmeove kitchen finishes as required. not a remodel of kitchens.Details
units 107/207/307/407/507/607/707/807/907/1007/1107/1207/1307/1407/1507: replace leaking waste lines in the (e) chase. rmeove kitchen finishes as required. not a remodel of kitchens. | $300,000 |
| Dec 21, 2020 | Never finaled issued Dec 2020, no final | 5112 Diamond Heights Bl | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace waterproofing rear deck. repair solid guard wall at front and rear deck. replace deck to wall metal front and rear deck less than 50%Details
remove and replace waterproofing rear deck. repair solid guard wall at front and rear deck. replace deck to wall metal front and rear deck less than 50% | $30,000 |
| Dec 21, 2020 | Completed final sign-off Sep 2021 | 2653 Union St | Richard Avelar &Assoc Reconstr/Dba Recon | repair front deck waterproofing and repair rear elevation deck. re-install existing door and window rear deck and replace in kind approx. 700 sq ft of siding on rear elevation, less than 50%.Details
repair front deck waterproofing and repair rear elevation deck. re-install existing door and window rear deck and replace in kind approx. 700 sq ft of siding on rear elevation, less than 50%. | $90,000 |
| Oct 14, 2020 | Completed final sign-off Nov 2020 | 46 Lower Tr | Richard Avelar &Assoc Reconstr/Dba Recon | reroofingDetails
reroofing | $15,000 |
| Oct 14, 2020 | Completed final sign-off Feb 2021 | 46 Lower Tr | Richard Avelar &Assoc Reconstr/Dba Recon | replace in kind wood siding on street facing elevation and rear elevation. repair waterproofing on 4th floor rear deckDetails
replace in kind wood siding on street facing elevation and rear elevation. repair waterproofing on 4th floor rear deck | $120,000 |
| Oct 13, 2020 | Never finaled issued Oct 2020, no final | 66 Cleary Ct | Richard Avelar &Assoc Reconstr/Dba Recon | replace leaking waste lines in extg chase. remove kitchen finishes as required. units 106,206,306,406,506,606,706,806,906,1006,1106,1206,1306, 1406,1506Details
replace leaking waste lines in extg chase. remove kitchen finishes as required. units 106,206,306,406,506,606,706,806,906,1006,1106,1206,1306, 1406,1506 | $200,000 |
| Sep 29, 2020 | Completed final sign-off Jun 2024 | 324 Locust St | Richard Avelar &Assoc Reconstr/Dba Recon | enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes.Details
enclosure of exterior deck at 2nd floor with new roof and walls. 2 new windows and skylight to be added - not visible from street. interior remodel of master bathroom includes new fixtures and finishes. | $28,000 |
| Sep 15, 2020 | Completed final sign-off Nov 2020 | 5810 Mission St | Richard Avelar &Assoc Reconstr/Dba Recon | removing and replacing about 6sqft of osb sub floor due to waterthis is a repair due to water damage only. there will be no altering of the unit. the hoa hired us to do the subfloor patch only. after investigation it is only the subfloor that is damaged - no floor joists or framing will be affected.Details
removing and replacing about 6sqft of osb sub floor due to waterthis is a repair due to water damage only. there will be no altering of the unit. the hoa hired us to do the subfloor patch only. after investigation it is only the subfloor that is damaged - no floor joists or framing will be affected. | $9,000 |
| Mar 6, 2020 | Completed final sign-off Apr 2023 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | misc building and roof and roof deck repairs. facade improvement at front.Details
misc building and roof and roof deck repairs. facade improvement at front. | $60,000 |
| Oct 23, 2019 | Completed final sign-off Jul 2020 | 1226 Page St | Richard Avelar &Assoc Reconstr/Dba Recon | roof repairs from fire damage, repair damaged framing, new roof. in-kindDetails
roof repairs from fire damage, repair damaged framing, new roof. in-kind | $150,000 |
| Oct 8, 2019 | Completed final sign-off Apr 2023 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | new bldg repairs and facade improvements. basement lvel: new bay projection new windows and e west window replacement. 1st fl alteration of e bay window projection , south bay window replacement. n/a for maherDetails
new bldg repairs and facade improvements. basement lvel: new bay projection new windows and e west window replacement. 1st fl alteration of e bay window projection , south bay window replacement. n/a for maher | $60,000 |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 1 Bluxome St | Richard Avelar &Assoc Reconstr/Dba Recon | rooftop: leaking stucco repair. removal of sheetmetal at roofing transition.removal of stucco around chimney to cap. new water proofing around chimney including new saddle at chimney/pusupit well. new sheetmetal riglet to match (e). patch and paint stucco to match.Details
rooftop: leaking stucco repair. removal of sheetmetal at roofing transition.removal of stucco around chimney to cap. new water proofing around chimney including new saddle at chimney/pusupit well. new sheetmetal riglet to match (e). patch and paint stucco to match. | $14,390 |
| Jul 11, 2019 | Completed final sign-off Aug 2020 | 1365 Union St | Richard Avelar &Assoc Reconstr/Dba Recon | replace in kind. rear elevation stucco assembly. rear of house only, not visible from street.Details
replace in kind. rear elevation stucco assembly. rear of house only, not visible from street. | $85,000 |
| May 8, 2019 | Completed final sign-off Apr 2023 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | provide new entry portico with skylight over existing entry at west elevationDetails
provide new entry portico with skylight over existing entry at west elevation | $35,000 |
| Apr 26, 2019 | Completed final sign-off Jun 2020 | 2870 Pacific Av | Richard Avelar &Assoc Reconstr/Dba Recon | replacement of existing window and sliding glass door, in-kind. repairs to exterior deck. street-facingDetails
replacement of existing window and sliding glass door, in-kind. repairs to exterior deck. street-facing | $375,000 |
| Mar 27, 2019 | Completed final sign-off May 2019 | 2305 Scott St | Richard Avelar &Assoc Reconstr/Dba Recon | repairs to framing, replace insulation and drywall basement also replace drywall and insulation in dining room. leak was fixed by others.Details
repairs to framing, replace insulation and drywall basement also replace drywall and insulation in dining room. leak was fixed by others. | $19,896 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | living room, kitchen master bed closet, master hall, laundry room, master vanity, master bath repairs to drywall and insulation due to water damage.Details
living room, kitchen master bed closet, master hall, laundry room, master vanity, master bath repairs to drywall and insulation due to water damage. | $15,227 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | living room repairs to drywall and insulation due to water damage. repair in kind.Details
living room repairs to drywall and insulation due to water damage. repair in kind. | $6,548 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | hall bath, master bedroom, master bathroom, drywall repair and insulation replace due to water damage. repair in kind.Details
hall bath, master bedroom, master bathroom, drywall repair and insulation replace due to water damage. repair in kind. | $12,552 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | master bedroom, closet, laundry room, master vanity, master bath, repair to drywall and insulation due to water damage. repair in kind.Details
master bedroom, closet, laundry room, master vanity, master bath, repair to drywall and insulation due to water damage. repair in kind. | $26,700 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | vanity room repair drywall and insulation due to water damages, repair in kind.Details
vanity room repair drywall and insulation due to water damages, repair in kind. | $3,217 |
| Mar 27, 2019 | Completed final sign-off Apr 2019 | 75 Folsom St | Richard Avelar &Assoc Reconstr/Dba Recon | 8th and 9th floor common areas. repairs to drywall and insulation due to water leark. common hallways to buildign. like for like. repair in kind.Details
8th and 9th floor common areas. repairs to drywall and insulation due to water leark. common hallways to buildign. like for like. repair in kind. | $19,507 |
| Feb 11, 2019 | Completed final sign-off Mar 2019 | 240 Scott St | Richard Avelar &Assoc Reconstr/Dba Recon | replace in kind drywall and insulation in two guest bedrooms due to leaking roofDetails
replace in kind drywall and insulation in two guest bedrooms due to leaking roof | $165,000 |
| Feb 7, 2019 | Completed final sign-off Aug 2019 | 240 Scott St | Richard Avelar &Assoc Reconstr/Dba Recon | water damage repair - siding(front), 5 windows to be replaced. wood windows, in-kind, same size and no other work. max u-factor 0.32 or better.Details
water damage repair - siding(front), 5 windows to be replaced. wood windows, in-kind, same size and no other work. max u-factor 0.32 or better. | $50,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 501 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | revision to bldg app#2017-12-13-6953. delete shower pan and gfi work. new scope, repair drywall about 10 sq ft and replace 5/8 type "x" due to leak from upstairs unit.Details
revision to bldg app#2017-12-13-6953. delete shower pan and gfi work. new scope, repair drywall about 10 sq ft and replace 5/8 type "x" due to leak from upstairs unit. | |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 401 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | revision to bldg app#2017-12-13-6400. additional work as follows: replace drywall and flooring in (3) bedrooms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materialsDetails
revision to bldg app#2017-12-13-6400. additional work as follows: replace drywall and flooring in (3) bedrooms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materials | $10,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 401 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | revision to bldg app#2017-12-13-6397. additional work as follows: replace drywall in (3) bedrooms, laundry, kitchen, living room and (2) bathrooms. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materialsDetails
revision to bldg app#2017-12-13-6397. additional work as follows: replace drywall in (3) bedrooms, laundry, kitchen, living room and (2) bathrooms. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. like for like materials | $10,000 |
| Jan 10, 2019 | Completed final sign-off Jan 2019 | 501 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | revision to bldg app#2017-12-08-5966. additional work as follows: replace drywall, insulation and flooring, kitchen cabinets, shower pan/bath tub in guest bath, master bath, (2) bedrooms, kitchen, living room and laundry room. like for like materialsDetails
revision to bldg app#2017-12-08-5966. additional work as follows: replace drywall, insulation and flooring, kitchen cabinets, shower pan/bath tub in guest bath, master bath, (2) bedrooms, kitchen, living room and laundry room. like for like materials | $10,000 |
| Jan 10, 2019 | Never finaled issued Jan 2019, no final | 401 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | revision to bldg app#2017-12-13-6398. additional work as follows: replace drywall and flooring in (3) bedrroms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking.Details
revision to bldg app#2017-12-13-6398. additional work as follows: replace drywall and flooring in (3) bedrroms, laundry, kitchen and living room. replace tub and surround in guest bath. replace shower pan and surround in master due to leaking. | $10,000 |
| Nov 7, 2018 | Completed final sign-off Feb 2023 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | reframe west elevation windows to repair dryrot (ref: 201809180621). add outlets to code 6-in-12 rule and replace 15 light fixtures with ifd. install gas appliance in dining room. direct vent gas fireplace in dining room ul listed. install as per manufacuter's requirements.Details
reframe west elevation windows to repair dryrot (ref: 201809180621). add outlets to code 6-in-12 rule and replace 15 light fixtures with ifd. install gas appliance in dining room. direct vent gas fireplace in dining room ul listed. install as per manufacuter's requirements. | $15,000 |
| Nov 5, 2018 | Completed final sign-off Mar 2020 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | structural improvement support 3 flr ceiling joists, provide new footing for stronf wall assembly on 2nd flr. and support 2 second flr joists. reframe cornice roof (non street facing) remove non bearing wall on 3 flr maher n/a.Details
structural improvement support 3 flr ceiling joists, provide new footing for stronf wall assembly on 2nd flr. and support 2 second flr joists. reframe cornice roof (non street facing) remove non bearing wall on 3 flr maher n/a. | $80,000 |
| Sep 25, 2018 | Completed final sign-off Jan 2019 | 1730 20th St | Richard Avelar &Assoc Reconstr/Dba Recon | repair stucco & waterproofing at less than 20% front and rear facades.Details
repair stucco & waterproofing at less than 20% front and rear facades. | $125,000 |
| Aug 31, 2018 | Completed final sign-off Mar 2020 | 3108 Jackson St | Richard Avelar &Assoc Reconstr/Dba Recon | provide bay windows above (e) 2nd flr bay window at 3rd flr.bay windows is over 7.5ft above grade, 10x2ft and meets dcp code 136(c)(3). replace (e) windows at 2nd flr. installing (7) windows in total. maher n/aDetails
provide bay windows above (e) 2nd flr bay window at 3rd flr.bay windows is over 7.5ft above grade, 10x2ft and meets dcp code 136(c)(3). replace (e) windows at 2nd flr. installing (7) windows in total. maher n/a | $35,000 |
| Aug 22, 2018 | Never finaled issued Aug 2018, no final | 101 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | replace installation and drywall in bathroom. water leak caused by damage to drywall and installation. mitigation company already removed affected materials like for like.Details
replace installation and drywall in bathroom. water leak caused by damage to drywall and installation. mitigation company already removed affected materials like for like. | $7,583 |
| Aug 22, 2018 | Completed final sign-off Feb 2019 | 101 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | replace insulation and drywall in bathroom. water leak caused damage drywall and insulation. mitigation company already removed affected materials like for like.Details
replace insulation and drywall in bathroom. water leak caused damage drywall and insulation. mitigation company already removed affected materials like for like. | $7,583 |
| Aug 15, 2018 | Never finaled issued Aug 2018, no final | 401 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | repair work only. damage due to flooding. areas affected: master bedroom, master bathroom, master closet, living room and kitchen. replacing light fixtures in-kindDetails
repair work only. damage due to flooding. areas affected: master bedroom, master bathroom, master closet, living room and kitchen. replacing light fixtures in-kind | $52,114 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 1357 San Bruno Av | Richard Avelar &Assoc Reconstr/Dba Recon | remove/replace (1) front door (right side), (1) upper juliette balcony door (right side).Details
remove/replace (1) front door (right side), (1) upper juliette balcony door (right side). | $44,733 |
| May 3, 2018 | Completed final sign-off Aug 2018 | 1355 San Bruno Av | Richard Avelar &Assoc Reconstr/Dba Recon | remove and replace inkind french door , patch stucco and interior finishes. exterior door at 3/fDetails
remove and replace inkind french door , patch stucco and interior finishes. exterior door at 3/f | $20,000 |
| Apr 24, 2018 | Never finaled issued May 2018, no final | 501 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | unit 5413 -revision to permit #201712085980. reconfigure interior walls.Details
unit 5413 -revision to permit #201712085980. reconfigure interior walls. | $28,673 |
| Apr 20, 2018 | Never finaled issued Apr 2018, no final | 501 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | replace shower pan in kind, replace gfi at vanityDetails
replace shower pan in kind, replace gfi at vanity | $5,520 |
| Apr 20, 2018 | Completed final sign-off Feb 2019 | 501 Crescent Wy | Richard Avelar &Assoc Reconstr/Dba Recon | unit #5208: replace in kind shower pan and surround, replace gfi at vanity, drywall repairs in-kind from water damage.Details
unit #5208: replace in kind shower pan and surround, replace gfi at vanity, drywall repairs in-kind from water damage. | $11,880 |
| Apr 6, 2018 | Completed final sign-off Jun 2018 | 301 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max factur 0.32Details
in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max factur 0.32 | $32,461 |
| Apr 6, 2018 | Completed final sign-off Jun 2018 | 301 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly.Details
in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. | $32,462 |
| Apr 6, 2018 | Completed final sign-off Jun 2018 | 301 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max u factor 0.32Details
in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max u factor 0.32 | $32,462 |
| Apr 6, 2018 | Completed final sign-off Jun 2018 | 301 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max u factor 0.32Details
in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max u factor 0.32 | $32,462 |
| Apr 6, 2018 | Completed final sign-off Jun 2018 | 301 Crescent Ct | Richard Avelar &Assoc Reconstr/Dba Recon | #3105: in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max u-factor 0.32Details
#3105: in-kind remove and replace exterior (2) windows and remove and replace in-kind stucco assembly. max u-factor 0.32 | $25,000 |