Yakov (Jacob) Bachar
- Listed as
- authorized agent-others, contractor
- Firm
- We Do Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Nov 2026
162 permits since 2000 (contractor on 162 permits, authorized agent-others on 1 permit): 114 completed, 46 in progress, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Harmony Design & Development Inc, Jr Santos Co, Yao Star Construction
- Architects
- Marco Antonio Camren Campa (13), Michael Zucker
- Engineers
- Nicholase Kennedy (4), Aws Salahaldin (2), A Urrutia, Alex Santos, Amarendra Prasad, Engin Yagmur
- Authorized agents
- Sheldon Eaton
Where they worked
- Single-family 42
- Multi-family (2-family, apartments) 56
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
Showing the 100 most recent of 162.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 16, 2026 | In progress filed Nov 2026, not yet issued | 3836 San Bruno Av | We Do Construction Inc. | residental ti and soft demo to (e) element reconfiguration of interior spaces and relocation of fixtures includes lmited modifications to certain facade element as needed. ab112Details
residental ti and soft demo to (e) element reconfiguration of interior spaces and relocation of fixtures includes lmited modifications to certain facade element as needed. ab112 | $150,000 |
| Oct 22, 2026 | In progress issued Oct 2026 | 100 Paloma Av | We Do Construction Inc. | install (n) solid panels over (e) glass sidelights at both sides of the front entry door. no change to landscaping, parking, impervious area and drainage.Details
install (n) solid panels over (e) glass sidelights at both sides of the front entry door. no change to landscaping, parking, impervious area and drainage. | $5,000 |
| Oct 19, 2026 | In progress filed Oct 2026, not yet issued | 100 Chaves Av | We Do Construction Inc. | first floor: remodel to inlcude an office, bedroom, laundry and game room with wet bar, replace exterior step. remodel 2nd floor kitchen and bathroom and add a new primary bathroom.Details
first floor: remodel to inlcude an office, bedroom, laundry and game room with wet bar, replace exterior step. remodel 2nd floor kitchen and bathroom and add a new primary bathroom. | $40,000 |
| Oct 8, 2026 | In progress issued Oct 2026 | 53 Hill St | We Do Construction Inc. | the only change in final set was the update to detail 3/5-30 made to reflect actual existing site conditions previous detail assumed an (e) concrete stem wall field conditons confirmed (e) foundation is brick masonry the detail was revised to show the new under pin pad. shows anchorage extendingDetails
the only change in final set was the update to detail 3/5-30 made to reflect actual existing site conditions previous detail assumed an (e) concrete stem wall field conditons confirmed (e) foundation is brick masonry the detail was revised to show the new under pin pad. shows anchorage extending | $10,000 |
| Oct 8, 2026 | In progress issued Oct 2026 | 64 Cook St | We Do Construction Inc. | revision to 202510298388. structural revision - update the deck joist to drop beam connection as detail.Details
revision to 202510298388. structural revision - update the deck joist to drop beam connection as detail. | $7,000 |
| Oct 2, 2026 | Completed final sign-off Nov 2026 | 1450 Hawes St | We Do Construction Inc. | repair approx. 180 sq. ft. of existing fire-damaged drywall and insulation. install one new electrical outlet and replace the existing kitchen faucet. no structural changes.Details
repair approx. 180 sq. ft. of existing fire-damaged drywall and insulation. install one new electrical outlet and replace the existing kitchen faucet. no structural changes. | $7,000 |
| Aug 14, 2026 | In progress issued Aug 2026 | 946 Stockton St | We Do Construction Inc. | master bath remodel. no structural changes with plans. revision to pa #202608056102Details
master bath remodel. no structural changes with plans. revision to pa #202608056102 | $15,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1755 Filbert St | We Do Construction Inc. | unit: #26: kitchen remodel like for likeDetails
unit: #26: kitchen remodel like for like | $25,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 37 Bache St | We Do Construction Inc. | kitchen remodel, replace sink, dish washer, fan and cabinets, new applicances, all in the same location. no removal of wallsDetails
kitchen remodel, replace sink, dish washer, fan and cabinets, new applicances, all in the same location. no removal of walls | $42,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 946 Stockton St | We Do Construction Inc. | unit #12d: guest bath remodel like for like, convert tub to shower, 40 sqft. no change to floor layout. no change to wall layout. no structural work. not a curbless shower.Details
unit #12d: guest bath remodel like for like, convert tub to shower, 40 sqft. no change to floor layout. no change to wall layout. no structural work. not a curbless shower. | $25,000 |
| Aug 5, 2026 | In progress issued Aug 2026 | 946 Stockton St | We Do Construction Inc. | unit #12d: master bath remodel like for like, shower to shower, 60 sqft. no change to floor layout. no change to wall layout. no structural work.Details
unit #12d: master bath remodel like for like, shower to shower, 60 sqft. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Jul 29, 2026 | In progress issued Jul 2026 | 2566 42nd Av | We Do Construction Inc. | recommencement and completion of work approved under pa# 202404180267Details
recommencement and completion of work approved under pa# 202404180267 | $8,200 |
| Jul 24, 2026 | In progress issued Aug 2026 | 457 Oak St | We Do Construction Inc. | revision to permit#202601143809. structural foundation, new footing that are added to new structure.Details
revision to permit#202601143809. structural foundation, new footing that are added to new structure. | $3,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 1000 North Point St | We Do Construction Inc. | unit # 905: bathroom and kitchen, like for like. bathroom approximately 40f. kitchen approximately 60sf.Details
unit # 905: bathroom and kitchen, like for like. bathroom approximately 40f. kitchen approximately 60sf. | $120,000 |
| Jul 22, 2026 | Completed final sign-off Aug 2026 | 176 15th Av | We Do Construction Inc. | bathroom remodel, like for like. no layout change. approximately 40sfDetails
bathroom remodel, like for like. no layout change. approximately 40sf | $10,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 19 Pinehurst Wy | We Do Construction Inc. | kitchen remodel like for like. replace sink, dishwasher, counter tops, fan and fixtures all in same location. no structural changesDetails
kitchen remodel like for like. replace sink, dishwasher, counter tops, fan and fixtures all in same location. no structural changes | $30,000 |
| Jul 17, 2026 | Completed final sign-off Nov 2026 | 1845 Leavenworth St | We Do Construction Inc. | unit #202: bathroom remodel, upgrade mep as neededDetails
unit #202: bathroom remodel, upgrade mep as needed | $20,000 |
| Jun 30, 2026 | Completed final sign-off Aug 2026 | 466 Vallejo St | We Do Construction Inc. | (rear building) kitchen remodel like for like. approximately 64sfDetails
(rear building) kitchen remodel like for like. approximately 64sf | $20,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 300 Nevada St | We Do Construction Inc. | stucco repair and dryrot repair in kind at eastern and southern facades. all existing doors and windows removed during repair will be reused and placed back in existing openings in kind.Details
stucco repair and dryrot repair in kind at eastern and southern facades. all existing doors and windows removed during repair will be reused and placed back in existing openings in kind. | $20,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 218 Wawona St | We Do Construction Inc. | bathroom remodel tub to shower conversion, replace plumbing and lighting as needed. in kind except tub to shower. no moving walls. approx 55 sq ft.Details
bathroom remodel tub to shower conversion, replace plumbing and lighting as needed. in kind except tub to shower. no moving walls. approx 55 sq ft. | $15,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 47 Santa Rita Av | We Do Construction Inc. | revision to 202603248209: adding scope of work, replace 650- 700 sq ft of stucco back of home, replace dry rot as needed. back of home.Details
revision to 202603248209: adding scope of work, replace 650- 700 sq ft of stucco back of home, replace dry rot as needed. back of home. | $2,500 |
| May 27, 2026 | In progress issued Jun 2026 | 90 Byxbee St | We Do Construction Inc. | interior renovation including partial garage conversion into living space. some demo of certain exiting elements replacement of gas powered system with electric by design; add half bath on main level; demo existing fireplace on main levelDetails
interior renovation including partial garage conversion into living space. some demo of certain exiting elements replacement of gas powered system with electric by design; add half bath on main level; demo existing fireplace on main level | $100,000 |
| May 20, 2026 | In progress issued Nov 2026 | 1900 15th Av | We Do Construction Inc. | revision to #202508042259: main: reconfigure master bedroom, closet, bathroom, & mud closet at foyer area. new skylights at living/dining, master bath, closet & half bath. remove rear window in master bed & replace slider w/ picture window. adu: replace windows facing west w/ sliders.Details
revision to #202508042259: main: reconfigure master bedroom, closet, bathroom, & mud closet at foyer area. new skylights at living/dining, master bath, closet & half bath. remove rear window in master bed & replace slider w/ picture window. adu: replace windows facing west w/ sliders. | $20,000 |
| May 11, 2026 | In progress issued May 2026 | 2567 Bryant St | We Do Construction Inc. | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 2 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). | $120,000 |
| May 4, 2026 | Completed final sign-off Aug 2026 | 2209 Chestnut St | We Do Construction Inc. | change of use from retail skin care shop to retail candy shop. work includes interior painting, wallpaper, install cashwrap. no structural,electrical,plumbing. sinks to remain. no changes to footprint, egress, occupancy classification.Details
change of use from retail skin care shop to retail candy shop. work includes interior painting, wallpaper, install cashwrap. no structural,electrical,plumbing. sinks to remain. no changes to footprint, egress, occupancy classification. | |
| Mar 26, 2026 | In progress issued May 2026 | 1363 34th Av | We Do Construction Inc. | the project consists of renovations to the existing single-family dwelling. the first floor scope includes conversion of a portion of the existing garage into conditioned living space and enclosure of an existing rear covered are below the second floor as part of the conditioned space. new side deckDetails
the project consists of renovations to the existing single-family dwelling. the first floor scope includes conversion of a portion of the existing garage into conditioned living space and enclosure of an existing rear covered are below the second floor as part of the conditioned space. new side deck | $140,000 |
| Mar 26, 2026 | In progress issued Mar 2026 | 207 Randall St | We Do Construction Inc. | unit a: add walkin shower at (e) powder room on 2nd floorDetails
unit a: add walkin shower at (e) powder room on 2nd floor | $20,000 |
| Mar 25, 2026 | Completed final sign-off Oct 2026 | 1919 Judah St | We Do Construction Inc. | revision to pa# 202510217813: change to shape of finish stair elevation.Details
revision to pa# 202510217813: change to shape of finish stair elevation. | |
| Mar 24, 2026 | Completed final sign-off Aug 2026 | 47 Santa Rita Av | We Do Construction Inc. | replace fire place w/ insert gas fire place in living room per manufacturer's specifications. replace two french doors and one fixed window at rear in kind in the existing openings.Details
replace fire place w/ insert gas fire place in living room per manufacturer's specifications. replace two french doors and one fixed window at rear in kind in the existing openings. | $8,000 |
| Mar 9, 2026 | Completed final sign-off Jun 2026 | 219 Lily St | We Do Construction Inc. | 1-bathroom remodel 35 sqft, replace tub to shower, replace plumbing fixtures 4 new rl update mep to code.Details
1-bathroom remodel 35 sqft, replace tub to shower, replace plumbing fixtures 4 new rl update mep to code. | $28,000 |
| Feb 19, 2026 | In progress issued Feb 2026 | 3100 Moraga St | We Do Construction Inc. | to obtain final inspection for work approved under pa#202412267420 all work is completeDetails
to obtain final inspection for work approved under pa#202412267420 all work is complete | |
| Feb 18, 2026 | Completed final sign-off Apr 2026 | 220 Denslowe Dr | We Do Construction Inc. | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $25,000 |
| Feb 2, 2026 | Completed final sign-off May 2026 | 2299 Pacific Av | We Do Construction Inc. | unit 81: bathroom remodel like for like, kitchen remodel, like for like.Details
unit 81: bathroom remodel like for like, kitchen remodel, like for like. | $50,000 |
| Feb 2, 2026 | Completed final sign-off Aug 2026 | 126 Galewood Cr | We Do Construction Inc. | 2 bathroom remodels like for like, kitchen remodel, upgrade supanel 100amps.Details
2 bathroom remodels like for like, kitchen remodel, upgrade supanel 100amps. | $85,000 |
| Jan 27, 2026 | Completed final sign-off Mar 2026 | 25 Montclair Tr | We Do Construction Inc. | in-kind stucco replacement (entire front facade) and 3 windows retrofit visible from the street (2 at basement & 1 at restroom). details to stay the same.Details
in-kind stucco replacement (entire front facade) and 3 windows retrofit visible from the street (2 at basement & 1 at restroom). details to stay the same. | $25,000 |
| Jan 27, 2026 | Completed final sign-off Feb 2026 | 220 Denslowe Dr | We Do Construction Inc. | revision to pa #2025-1231-3111 (bathroom remodel): adding layout changeDetails
revision to pa #2025-1231-3111 (bathroom remodel): adding layout change | |
| Jan 27, 2026 | Completed final sign-off Aug 2026 | 1626 North Point St | We Do Construction Inc. | unit #202: kitchen remodel like for like. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating.Details
unit #202: kitchen remodel like for like. no change to floor layout. no change to wall layout. no structural work. maintain all (e) fire rating. | $70,000 |
| Jan 14, 2026 | In progress issued Feb 2026 | 457 Oak St | We Do Construction Inc. | revision to pa# 202508193437, add to scope more than 50% stair repair.Details
revision to pa# 202508193437, add to scope more than 50% stair repair. | |
| Dec 31, 2025 | Completed final sign-off Jul 2026 | 5011 Diamond Heights Bl | We Do Construction Inc. | 2 bathrooms remodeling like for like. 1 kitchen remodel.Details
2 bathrooms remodeling like for like. 1 kitchen remodel. | $100,000 |
| Dec 31, 2025 | In progress issued Jul 2026 | 241 Granville Wy | We Do Construction Inc. | convert 640 sf of ground floor storage at rear into habitable. reconfigure windows and doors and facade at rear. add master suite on 1st floor. reconfigure rear stair to yard.Details
convert 640 sf of ground floor storage at rear into habitable. reconfigure windows and doors and facade at rear. add master suite on 1st floor. reconfigure rear stair to yard. | $92,000 |
| Dec 31, 2025 | Completed final sign-off Feb 2026 | 220 Denslowe Dr | We Do Construction Inc. | bathroom remodel like for like.Details
bathroom remodel like for like. | $20,000 |
| Dec 24, 2025 | In progress issued Dec 2025 | 450 Hayes St | We Do Construction Inc. | unit #4d: kitchen remodel like for like.Details
unit #4d: kitchen remodel like for like. | $80,000 |
| Dec 22, 2025 | Completed final sign-off Oct 2026 | 2254 Fulton St | We Do Construction Inc. | upper unit 2254: kitchen and bath remodel of an existing 4-story duplex, including shifted walls, openings, and fixtures, and new pantryDetails
upper unit 2254: kitchen and bath remodel of an existing 4-story duplex, including shifted walls, openings, and fixtures, and new pantry | $40,000 |
| Dec 17, 2025 | Completed final sign-off Oct 2026 | 1919 Judah St | We Do Construction Inc. | revision 202510217813- per inspector needs to add to scope of work replace stucco in kind at 2nd floor facing street. including installation of 1/2" cdx plywood minimum.Details
revision 202510217813- per inspector needs to add to scope of work replace stucco in kind at 2nd floor facing street. including installation of 1/2" cdx plywood minimum. | |
| Dec 9, 2025 | In progress issued Dec 2025 | 241 Granville Wy | Harmony Design & Development Inc, We Do Construction Inc. | 2nd floor bathroom remodel in-kind, sink, shower pan, toilet.Details
2nd floor bathroom remodel in-kind, sink, shower pan, toilet. | $47,000 |
| Nov 24, 2025 | Completed final sign-off May 2026 | 53 Rockaway Av | We Do Construction Inc. | interior renovation, entry of foyer, existing door will be pushed forward and the finish floor of the foyer will be raised creating a new finish floor assembly.Details
interior renovation, entry of foyer, existing door will be pushed forward and the finish floor of the foyer will be raised creating a new finish floor assembly. | $70,000 |
| Nov 23, 2025 | Completed final sign-off Mar 2026 | 241 Moultrie St | We Do Construction Inc. | in-kind remodeling of 2 bathroom(s) in 1st fl with 2 shower pan(s).Details
in-kind remodeling of 2 bathroom(s) in 1st fl with 2 shower pan(s). | $38,000 |
| Nov 13, 2025 | Completed final sign-off Apr 2026 | 4121 Cesar Chavez St | We Do Construction Inc. | work at unit# 4. 2nd bathroom remodel. like for like.Details
work at unit# 4. 2nd bathroom remodel. like for like. | $38,000 |
| Nov 13, 2025 | In progress issued Dec 2025 | 47 Newburg St | We Do Construction Inc. | structural upgrade for installation of a new 8'x7' garage door. no additional plumbing fixturesDetails
structural upgrade for installation of a new 8'x7' garage door. no additional plumbing fixtures | $70,000 |
| Nov 12, 2025 | Completed final sign-off Jun 2026 | 2524 Anza St | We Do Construction Inc. | bathroom remodel in kind like for like no wall removal or layout changeDetails
bathroom remodel in kind like for like no wall removal or layout change | $36,000 |
| Nov 12, 2025 | Completed final sign-off May 2026 | 24 Ord St | We Do Construction Inc. | bathroom remodel in kind like for like no wall removal or layout changeDetails
bathroom remodel in kind like for like no wall removal or layout change | $38,000 |
| Nov 6, 2025 | In progress issued Nov 2025 | 112 Andover St | We Do Construction Inc. | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Nov 4, 2025 | Completed final sign-off Dec 2025 | 1751 North Point St | We Do Construction Inc. | bathroom replace all plumbing fixtures, shower, tub, plumbing only.Details
bathroom replace all plumbing fixtures, shower, tub, plumbing only. | $18,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 1785 San Jose Av | We Do Construction Inc. | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $22,000 |
| Oct 30, 2025 | Completed final sign-off Dec 2025 | 4315 Clement St | We Do Construction Inc. | unit 4: install new gas fire place, use gas grom existing heater, framing fireplace install drywall paintDetails
unit 4: install new gas fire place, use gas grom existing heater, framing fireplace install drywall paint | $10,000 |
| Oct 30, 2025 | Completed final sign-off Jan 2026 | 25 Montclair Tr | We Do Construction Inc. | in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $25,000 |
| Oct 29, 2025 | In progress issued Nov 2025 | 64 Cook St | We Do Construction Inc. | deck extention upgrade of an (e) exterior wood deck including the replacment of structural support, decking railing and stairs as needed located at rearDetails
deck extention upgrade of an (e) exterior wood deck including the replacment of structural support, decking railing and stairs as needed located at rear | $35,000 |
| Oct 23, 2025 | In progress issued Oct 2025 | 100 Paloma Av | We Do Construction Inc. | demo all sheet rock and r-15 insulation. master bathroom remodel on 2/f. hallway bath remodel. relocate laundry from master bath to hallway bath. replace all windows. front and east elevations windows to be wood or aluminum clad wood; same operation and grille pattern. rewire the whole house.Details
demo all sheet rock and r-15 insulation. master bathroom remodel on 2/f. hallway bath remodel. relocate laundry from master bath to hallway bath. replace all windows. front and east elevations windows to be wood or aluminum clad wood; same operation and grille pattern. rewire the whole house. | $85,000 |
| Oct 22, 2025 | Completed final sign-off Nov 2025 | 1801 Larkin St | We Do Construction Inc. | to comply with nov 202537190. vehicle damage to front of building. stucco repair less than 50% in kind.Details
to comply with nov 202537190. vehicle damage to front of building. stucco repair less than 50% in kind. | $15,000 |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 35 Brewster St | We Do Construction Inc., Jr Santos Co | interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgradeDetails
interior renovations, facade upgrades. new cladding and improve to main entrance. 1st flr-master bathroom remodel, replace interior and exterior doors & windows. relocate ahu and add new laundry closet. 2nd flr bathroom remodeling partial remodeling partial remodel of kitchen. structural upgrade | $95,000 |
| Oct 21, 2025 | Completed final sign-off Oct 2026 | 1919 Judah St | We Do Construction Inc. | in kind stair replacement. existing non compliant exterior entry stair system bring up to code. new garage door.Details
in kind stair replacement. existing non compliant exterior entry stair system bring up to code. new garage door. | $67,000 |
| Oct 7, 2025 | In progress issued Jan 2026 | 1900 15th Av | We Do Construction Inc. | (n) attached 558 sqft adu - unit #2. main home addition & remodel including demo of (e) fireplace, (n) master bedroom, bathroom, & closet; living/dining relocation, new deckDetails
(n) attached 558 sqft adu - unit #2. main home addition & remodel including demo of (e) fireplace, (n) master bedroom, bathroom, & closet; living/dining relocation, new deck | $200,000 |
| Oct 3, 2025 | Completed final sign-off Dec 2025 | 825 La Playa | We Do Construction Inc. | unit 130: bathroom remodel in kind.Details
unit 130: bathroom remodel in kind. | $34,000 |
| Oct 3, 2025 | Completed final sign-off Aug 2026 | 201 Folsom St | We Do Construction Inc. | unit#26a: kitchen remodeling like for like, 2 bathroom remodeling like for likeDetails
unit#26a: kitchen remodeling like for like, 2 bathroom remodeling like for like | $70,000 |
| Sep 22, 2025 | Completed final sign-off May 2026 | 2736 Baker St | We Do Construction Inc. | kitchen and bathroom remodel in-kind.Details
kitchen and bathroom remodel in-kind. | $50,000 |
| Sep 19, 2025 | In progress issued Sep 2025 | 612 Guerrero St | We Do Construction Inc. | revision to pa# 202508132953, unit #2- insulation and drywall for finish rewire.Details
revision to pa# 202508132953, unit #2- insulation and drywall for finish rewire. | |
| Sep 12, 2025 | Completed final sign-off Jul 2026 | 11 Wright St | We Do Construction Inc. | bathroom remodel like for like.Details
bathroom remodel like for like. | $30,000 |
| Sep 3, 2025 | In progress issued Oct 2025 | 2519 32nd Av | We Do Construction Inc., Yao Star Construction | interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cielingDetails
interior remodel converting ground fl. into habitable space on ground floor. remodeling kitchen, bathroom, new plan configuration, adding 2 moere bedrooms & recreational room in ground fl., rebuilding stairs, adding a 2nd floor deck & exterior stairs, adding new windows/skylights. replacing cieling | $400,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 457 Oak St | We Do Construction Inc. | stairs repair like for like front. (less than 50%)Details
stairs repair like for like front. (less than 50%) | $40,000 |
| Aug 19, 2025 | Completed final sign-off Dec 2025 | 790 21st Av | We Do Construction Inc. | bathroom remodel in kindDetails
bathroom remodel in kind | $35,000 |
| Aug 19, 2025 | In progress issued Aug 2025 | 550 Broderick St | We Do Construction Inc. | installing new skylights on the existing roof structure.Details
installing new skylights on the existing roof structure. | $8,000 |
| Aug 13, 2025 | In progress issued Aug 2025 | 612 Guerrero St | We Do Construction Inc. | unit#2: kitchen remodel like for like. bathroom remodel like for like. rewire apartment. install electric tankless water heater. no removal of wallsDetails
unit#2: kitchen remodel like for like. bathroom remodel like for like. rewire apartment. install electric tankless water heater. no removal of walls | $42,000 |
| Jul 29, 2025 | Completed final sign-off May 2026 | 4596 Mission St | We Do Construction Inc. | storefront facade improvement finishes only glass to change color, tile added to (e) stucco; replace existing window to stain glassDetails
storefront facade improvement finishes only glass to change color, tile added to (e) stucco; replace existing window to stain glass | $38,562 |
| Jul 8, 2025 | Completed final sign-off Oct 2025 | 959 Church St | We Do Construction Inc. | bathroom remodel, relocate plumbing, adding toilet, cancel shower, 6 r,l,. replace tub, outlets and switches. no removal of wallsDetails
bathroom remodel, relocate plumbing, adding toilet, cancel shower, 6 r,l,. replace tub, outlets and switches. no removal of walls | $45,000 |
| Jul 3, 2025 | Completed final sign-off Mar 2026 | 3100 Moraga St | We Do Construction Inc. | in kind renovation of existing (1) bathroom on 2nd floor. infill the door from bedroom to bathroom, change tub to shower.Details
in kind renovation of existing (1) bathroom on 2nd floor. infill the door from bedroom to bathroom, change tub to shower. | $45,000 |
| Jul 1, 2025 | Completed final sign-off Aug 2025 | 200 Divisadero St | We Do Construction Inc. | revision to pa# 202506189026. adding scope of work; dry rot repair at garage. visible from street, less than 50%, like for like, no structural.Details
revision to pa# 202506189026. adding scope of work; dry rot repair at garage. visible from street, less than 50%, like for like, no structural. | $11,000 |
| Jun 30, 2025 | Completed final sign-off Sep 2025 | 550 Broderick St | We Do Construction Inc. | remodeling the existing primary bathroom and constructing a new full bathroom within the existing closet space.Details
remodeling the existing primary bathroom and constructing a new full bathroom within the existing closet space. | $60,000 |
| Jun 30, 2025 | In progress issued Apr 2026 | 53 Hill St | We Do Construction Inc. | exterior alteration, interior renovation and window upgrades of apartment unitDetails
exterior alteration, interior renovation and window upgrades of apartment unit | $100,000 |
| Jun 27, 2025 | Completed final sign-off Aug 2025 | 54 Marietta Dr | We Do Construction Inc. | in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 1 shower pan(s). | $20,000 |
| Jun 18, 2025 | Completed final sign-off Aug 2025 | 200 Divisadero St | We Do Construction Inc. | stucco repair. visible from street. approx 50 sq ft.Details
stucco repair. visible from street. approx 50 sq ft. | $21,800 |
| Jun 18, 2025 | Completed final sign-off Feb 2026 | 4121 Cesar Chavez St | We Do Construction Inc. | bathroom remodel like for like.Details
bathroom remodel like for like. | $61,800 |
| May 30, 2025 | Completed final sign-off Jul 2025 | 42 Bache St | We Do Construction Inc. | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $28,880 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 137 Buchanan St | We Do Construction Inc. | 1 bathroom remodeling like to likeDetails
1 bathroom remodeling like to like | $40,000 |
| May 20, 2025 | Completed final sign-off Aug 2025 | 3611 22nd St | We Do Construction Inc. | in kind 5 windows to be replaced with aluminum clad exterior (marvin signature windows). street facingDetails
in kind 5 windows to be replaced with aluminum clad exterior (marvin signature windows). street facing | $8,000 |
| May 14, 2025 | Completed final sign-off Feb 2026 | 640 Davis St | We Do Construction Inc. | unit 1; 1 guest bathroom like for like. 1 powder room like for like, 1 primary bathroom like for likeDetails
unit 1; 1 guest bathroom like for like. 1 powder room like for like, 1 primary bathroom like for like | $68,000 |
| May 8, 2025 | Completed final sign-off Aug 2025 | 25 Kingston St | We Do Construction Inc. | master bathroom remodel, inkind. no removal of wallsDetails
master bathroom remodel, inkind. no removal of walls | $24,000 |
| Apr 15, 2025 | Completed final sign-off Dec 2025 | 1775 Broadway | We Do Construction Inc. | unit 18-bathroom remodel like for like no wall removalDetails
unit 18-bathroom remodel like for like no wall removal | $20,000 |
| Mar 25, 2025 | In progress issued Sep 2025 | 2566 42nd Av | We Do Construction Inc. | revision to pa# 202404180267, add new retaining wall @ the rear side addition along sw-a. existing cmu retaining wall to remain. revise the thickness of the new concrete slab on grade.Details
revision to pa# 202404180267, add new retaining wall @ the rear side addition along sw-a. existing cmu retaining wall to remain. revise the thickness of the new concrete slab on grade. | |
| Mar 12, 2025 | Completed final sign-off Apr 2026 | 112 Andover St | We Do Construction Inc. | one bathroom remodeling like for likeDetails
one bathroom remodeling like for like | $35,000 |
| Mar 12, 2025 | Completed final sign-off Aug 2025 | 54 Marietta Dr | We Do Construction Inc. | one kitchen remodel like for likeDetails
one kitchen remodel like for like | $18,000 |
| Mar 11, 2025 | Completed final sign-off Jan 2026 | 3611 22nd St | We Do Construction Inc. | interior remodel for open concept kitchen, living and dining space. more than 50% of existing exterior walls are maintained. project is not considered major remodel.Details
interior remodel for open concept kitchen, living and dining space. more than 50% of existing exterior walls are maintained. project is not considered major remodel. | $90,000 |
| Mar 11, 2025 | In progress issued Mar 2025 | 1475 29th Av | We Do Construction Inc. | revision to pa# 202409130762, page a1.2- added lights to dining room and bedrooms; page a1.1- added door #15 and changed size of door #20.Details
revision to pa# 202409130762, page a1.2- added lights to dining room and bedrooms; page a1.1- added door #15 and changed size of door #20. | $7,000 |
| Feb 25, 2025 | Expired or cancelled expired Apr 2025 | 975 Union St | We Do Construction Inc. | partial bathroom remodeling, replace tub tile. no other work.Details
partial bathroom remodeling, replace tub tile. no other work. | $20,000 |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 11 Wright St | We Do Construction Inc. | replace skylight with 2 new skylights. | $15,000 |
| Feb 4, 2025 | Completed final sign-off Apr 2025 | 737 Union St | We Do Construction Inc. | bathroom remodel like for like. replace shower, update e/p/m up to code. replace plumbing fixtures and 2 recess lights.Details
bathroom remodel like for like. replace shower, update e/p/m up to code. replace plumbing fixtures and 2 recess lights. | $28,000 |
| Feb 4, 2025 | In progress issued Feb 2025 | 1919 Judah St | We Do Construction Inc. | repair garage door. (car hit the garage), storage door repair, repair stone siding in kind.Details
repair garage door. (car hit the garage), storage door repair, repair stone siding in kind. | $38,000 |
| Feb 3, 2025 | Completed final sign-off Jul 2025 | 73 Santa Rosa Av | We Do Construction Inc. | kitchen remodel to enlarge kitchen by removing wall between laundry room. adding (n) pass through window and (n) appliances located at second floor.Details
kitchen remodel to enlarge kitchen by removing wall between laundry room. adding (n) pass through window and (n) appliances located at second floor. | $40,000 |
| Jan 16, 2025 | In progress issued Jan 2025 | 2415 Van Ness Av | We Do Construction Inc. | unit 201: remove none load bearing wall and add new wall 4' to (e) living/dining area.Details
unit 201: remove none load bearing wall and add new wall 4' to (e) living/dining area. | $25,000 |
| Jan 16, 2025 | Completed final sign-off Apr 2025 | 345 Church St | We Do Construction Inc. | unit 1-d: remodel bathroom, like for like.Details
unit 1-d: remodel bathroom, like for like. | $32,000 |
| Dec 26, 2024 | In progress issued Dec 2024 | 3100 Moraga St | We Do Construction Inc. | (1) kitchen remodel in kind (136 sq.ft.) replace appliances, outlets, plumbing fixtures. update mep up to code. 6 new recessed lights.Details
(1) kitchen remodel in kind (136 sq.ft.) replace appliances, outlets, plumbing fixtures. update mep up to code. 6 new recessed lights. | $41,000 |