Will Ng
- Listed as
- authorized agent-others, contractor, designer
- Firm
- Will P K Ng Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Dec 2022
97 permits since 2000 (contractor on 96 permits, authorized agent-others on 1 permit, designer on 1 permit): 80 completed, 15 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 28, 2022 | Completed final sign-off Aug 2023 | 6 Arleta Av | 1) 2/f unit 6 arleta av: rmeodel (e) kichen, in-kind. new bthroom and new media room. 2) 3/f: 8 arleta av - new bathroom and bed room.Details
1) 2/f unit 6 arleta av: rmeodel (e) kichen, in-kind. new bthroom and new media room. 2) 3/f: 8 arleta av - new bathroom and bed room. | $50,000 | |
| Dec 16, 2022 | Completed final sign-off Mar 2024 | 381 Park St | Will P K Ng Construction Inc. | 2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms.Details
2/f: units 381/383 - remodel (e) kitchen and relocate (e) bathroom. 3/f: unit 385 remodel (e) kitchen and bathroom, add 2 new bathrooms. | $109,000 |
| Oct 20, 2022 | Completed final sign-off Aug 2024 | 36 Monticello St | Will P K Ng Construction Inc. | reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yardDetails
reconfigure main floor, add (1) bath, remodel (e) kitchen & bath, legalize ground floor (e) accessory rooms, replace all windows in-kind w/in (e) openings, remove/upgrade electrical panel, build new deck at rear yard | $50,000 |
| Jun 14, 2022 | Completed final sign-off Oct 2023 | 420 Colon Av | Will P K Ng Construction Inc. | revision to pa# 202111162542. add non-bearing partition wall to existing family room at ground floor.Details
revision to pa# 202111162542. add non-bearing partition wall to existing family room at ground floor. | $2,000 |
| Nov 16, 2021 | Completed final sign-off Oct 2023 | 420 Colon Av | Will P K Ng Construction Inc. | add kitchenette to existing family room at ground floor.Details
add kitchenette to existing family room at ground floor. | $5,000 |
| Sep 17, 2021 | Completed final sign-off Sep 2022 | 3673 Mission St | Will P K Ng Construction Inc. | add kitchenette at 1/f to (e) habitable space. ref pa202006259122.Details
add kitchenette at 1/f to (e) habitable space. ref pa202006259122. | $5,000 |
| Jul 20, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | Will P K Ng Construction Inc. | revision to 202105110180 rebuild front stair in kind and new wall at side of porchDetails
revision to 202105110180 rebuild front stair in kind and new wall at side of porch | $2,000 |
| Jun 23, 2021 | Completed final sign-off Sep 2021 | 2840 San Bruno Av | Will P K Ng Construction Inc. | unit #8: remdel kitchen & convert dining to bedroom.Details
unit #8: remdel kitchen & convert dining to bedroom. | $22,000 |
| May 11, 2021 | Completed final sign-off Aug 2021 | 21 Stone St | Will P K Ng Construction Inc. | kitchen (65 sf) and bathroom (40 sf) remodel in-kindDetails
kitchen (65 sf) and bathroom (40 sf) remodel in-kind | $16,000 |
| May 11, 2021 | Completed final sign-off Nov 2022 | 579 Naples St | Will P K Ng Construction Inc., Yao Star Construction | 1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer.Details
1st fl: add 1 bedroom, 2 full baths, media and laudry. 2nd fl: remodel bedroom, bath and kitchen, add half bath. 3rd fl: remodel bath. add new rear deck, add 1 domer. | $98,000 |
| May 10, 2021 | Completed final sign-off Feb 2023 | 735 Peralta Av | Will P K Ng Construction Inc. | comply with complaint 202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel (e) abondaned bldg - rear bldg: remodel bath/bedroom & add kitchenette.Details
comply with complaint 202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel (e) abondaned bldg - rear bldg: remodel bath/bedroom & add kitchenette. | $20,000 |
| May 10, 2021 | Completed final sign-off Mar 2023 | 735 Peralta Av | Will P K Ng Construction Inc. | comply w/202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel(e)abondaned bldg, front bldg:add family rm, office, bath & media @ 1/f. (n) interior stairway, replce windows @ front w/alum-clad wood wdws, replace (e) stucco @ upper front. rev. to 202009103862Details
comply w/202044861/202060001/202058933/202060241/202060221/202172105 & dcp 2020-009276enf: remodel(e)abondaned bldg, front bldg:add family rm, office, bath & media @ 1/f. (n) interior stairway, replce windows @ front w/alum-clad wood wdws, replace (e) stucco @ upper front. rev. to 202009103862 | $75,000 |
| Feb 12, 2021 | Never finaled issued Apr 2021, no final | 20 Rosewood Dr | Will P K Ng Construction Inc. | 1/f: remodel kitchen & bathroom. 2/f: remodel bathroom & add 1 full bathroom.Details
1/f: remodel kitchen & bathroom. 2/f: remodel bathroom & add 1 full bathroom. | $50,000 |
| Dec 8, 2020 | Completed final sign-off Mar 2021 | 3675 Mission St | Will P K Ng Construction Inc. | split (e) family room to office & family room at upper floor.Details
split (e) family room to office & family room at upper floor. | $5,000 |
| Jun 25, 2020 | Completed final sign-off Jan 2021 | 3673 Mission St | Will P K Ng Construction Inc. | repair fire damage in 2 kitchen (12x12.5) and sheetrock (replace with 5/8" type "x" gyp. bd. to maintain unit separation as needed).Details
repair fire damage in 2 kitchen (12x12.5) and sheetrock (replace with 5/8" type "x" gyp. bd. to maintain unit separation as needed). | $31,000 |
| Mar 10, 2020 | Completed final sign-off Feb 2021 | 2832 San Bruno Av | Will P K Ng Construction Inc. | soft story seismic upgrade per sf ord 66-13. sfebc ch 34 cebc ap a4Details
soft story seismic upgrade per sf ord 66-13. sfebc ch 34 cebc ap a4 | $3,000 |
| Feb 6, 2020 | Completed final sign-off Dec 2020 | 1233 Arguello Bl | Will P K Ng Construction Inc. | revise pa #201709087417, add foundation under 2 shear wall.Details
revise pa #201709087417, add foundation under 2 shear wall. | $1,800 |
| Sep 27, 2019 | Completed final sign-off May 2021 | 777 Silver Av | Will P K Ng Construction Inc. | revision to approved permit 2015-1020-0292; remove exterior door. relocate furnace, change guardrail to tempered galss, add a powder room. relocate a closetDetails
revision to approved permit 2015-1020-0292; remove exterior door. relocate furnace, change guardrail to tempered galss, add a powder room. relocate a closet | $15,000 |
| Sep 25, 2019 | Completed final sign-off Feb 2021 | 731 Clay St | Will P K Ng Construction Inc. | to correct nov 201981981 expansion of room 10 to add bath, remodel e bathDetails
to correct nov 201981981 expansion of room 10 to add bath, remodel e bath | $10,000 |
| Sep 20, 2019 | Completed final sign-off Jan 2021 | 2938 25th Av | Will P K Ng Construction Inc. | remodel kitchen & bathroom, add one full bath & half bath at 2nd fl.Details
remodel kitchen & bathroom, add one full bath & half bath at 2nd fl. | $48,600 |
| Apr 16, 2019 | Completed final sign-off Aug 2019 | 1033 Taraval St | Will P K Ng Construction Inc. | replace ceiling lightings and ceiling gyp at (e) locaitonsDetails
replace ceiling lightings and ceiling gyp at (e) locaitons | $15,000 |
| Mar 12, 2019 | Completed final sign-off Jun 2021 | 3229 Lincoln Wy | Will P K Ng Construction Inc. | revision to pa #201507222200. 1st flr - relocate furnace from unit b to 2nd flr. create hallway to separate family rm & entrance, add (2) 3 fixture bath and 1 closet. 2nd flr - add closet under staircase. 3rd flr - expand the 3 fixture bath. relocate furnace for unit a to 2nd flr.Details
revision to pa #201507222200. 1st flr - relocate furnace from unit b to 2nd flr. create hallway to separate family rm & entrance, add (2) 3 fixture bath and 1 closet. 2nd flr - add closet under staircase. 3rd flr - expand the 3 fixture bath. relocate furnace for unit a to 2nd flr. | $40,000 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 130 Downey St | Will P K Ng Construction Inc. | remodel (e) kitchen (8'x6') and bathroom (5'x8') on 2nd floor. installation of ceiling sound board and 5/8" type x sheetrock.Details
remodel (e) kitchen (8'x6') and bathroom (5'x8') on 2nd floor. installation of ceiling sound board and 5/8" type x sheetrock. | $7,000 |
| Sep 14, 2018 | Completed final sign-off Jun 2019 | 351 Grove St | Will P K Ng Construction Inc. | rev pa# 201608296262 for soft story seismic upgrade. change to welding specificationDetails
rev pa# 201608296262 for soft story seismic upgrade. change to welding specification | |
| Aug 28, 2018 | Completed final sign-off Mar 2019 | 644 Lyon St | Will P K Ng Construction Inc. | revise permit under issued #201609137589. add 3 foundation under new shear walls.Details
revise permit under issued #201609137589. add 3 foundation under new shear walls. | $2,800 |
| Aug 13, 2018 | Never finaled issued Aug 2018, no final | 2960 24th Av | Will P K Ng Construction Inc. | to obtain final inspection for work approved under pa# 2015-0825-5283, 2015-1119-9147 and 2016-0621-0474. all work is complete.Details
to obtain final inspection for work approved under pa# 2015-0825-5283, 2015-1119-9147 and 2016-0621-0474. all work is complete. | |
| Jul 10, 2018 | Completed final sign-off Aug 2023 | 749 Webster St | Will P K Ng Construction Inc. | re-built dry rotted front entry stair with deck/landing in (e) envelope/footprint.Details
re-built dry rotted front entry stair with deck/landing in (e) envelope/footprint. | $8,000 |
| May 4, 2018 | Completed final sign-off Feb 2020 | 3033 Alemany Bl | Will P K Ng Construction Inc. | to comply with nov# 201839201. remove (e) kitchen on ground floor.Details
to comply with nov# 201839201. remove (e) kitchen on ground floor. | $18,000 |
| Dec 4, 2017 | Completed final sign-off Aug 2021 | 625 Ashbury St | Will P K Ng Construction Inc. | soft story seismic retrofit per 2016 cebc appendix a-4Details
soft story seismic retrofit per 2016 cebc appendix a-4 | $28,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2020 | 1233 Arguello Bl | Will P K Ng Construction Inc. | seismic upgrade to comply with ord 66-13 soft story retrofit per sfebc ch 34 b, 2016 cebc app a4Details
seismic upgrade to comply with ord 66-13 soft story retrofit per sfebc ch 34 b, 2016 cebc app a4 | $18,000 |
| Aug 31, 2017 | Completed final sign-off Oct 2019 | 940 Leavenworth St | Will P K Ng Construction Inc. | seismic upgrade to comply with ord 66-13, soft story retrofit per sfebc ch 4 d, 2016 cebc app a4Details
seismic upgrade to comply with ord 66-13, soft story retrofit per sfebc ch 4 d, 2016 cebc app a4 | $28,000 |
| Aug 21, 2017 | Completed final sign-off Oct 2019 | 936 Leavenworth St | Will P K Ng Construction Inc. | seismic upgrade to comply with ordinance 66 13 soft story retrofit per sfebc chapter 4d, 2016 cebc app a4Details
seismic upgrade to comply with ordinance 66 13 soft story retrofit per sfebc chapter 4d, 2016 cebc app a4 | $18,000 |
| Aug 15, 2017 | Completed final sign-off Dec 2017 | 190 Brighton Av | Will P K Ng Construction Inc. | unit #2: repair sheetrock area=700 sq. ft. remodel bathroom and kitchen #2 unit. no structural work.Details
unit #2: repair sheetrock area=700 sq. ft. remodel bathroom and kitchen #2 unit. no structural work. | $25,000 |
| Aug 7, 2017 | Completed final sign-off Feb 2021 | 2840 San Bruno Av | Will P K Ng Construction Inc. | soft story seismic upgrade per sf ord 66-13, sfebc ch 34, cebc app 4Details
soft story seismic upgrade per sf ord 66-13, sfebc ch 34, cebc app 4 | $18,000 |
| Jul 26, 2017 | Completed final sign-off May 2021 | 1323 Leavenworth St | Will P K Ng Construction Inc. | soft story seismic upgrade to comply with ord 66-13 per sfbc ch 34b 2016 cebc app a4Details
soft story seismic upgrade to comply with ord 66-13 per sfbc ch 34b 2016 cebc app a4 | $28,000 |
| Apr 27, 2017 | Completed final sign-off May 2017 | 74 Farview Ct | Will P K Ng Construction Inc. | as built floor plans to app#201609309275Details
as built floor plans to app#201609309275 | |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 350 Glenview Dr | Will P K Ng Construction Inc. | revised permit issued under 2016-0314-1920 - change shear wall along line 4 to steel brace frame; add foundation along line 3Details
revised permit issued under 2016-0314-1920 - change shear wall along line 4 to steel brace frame; add foundation along line 3 | |
| Mar 15, 2017 | Never finaled issued Mar 2017, no final | 120 Portola Dr | Will P K Ng Construction Inc. | revised permit issued under 2016-0506-6784. change shear wall along line c to steel brace frameDetails
revised permit issued under 2016-0506-6784. change shear wall along line c to steel brace frame | |
| Sep 30, 2016 | Completed final sign-off May 2017 | 74 Farview Ct | Will P K Ng Construction Inc. | to comply with complaint #201639531, remodel kitchen and bathroom, add one bedroom, (4) skylights & two full bathrooms per plan.Details
to comply with complaint #201639531, remodel kitchen and bathroom, add one bedroom, (4) skylights & two full bathrooms per plan. | $46,300 |
| Sep 16, 2016 | Expired or cancelled cancelled Dec 2016 | 4333 Cabrillo St | Will P K Ng Construction Inc. | upper stair kitchen and bathroom remodel in kindDetails
upper stair kitchen and bathroom remodel in kind | $5,000 |
| Sep 15, 2016 | Completed final sign-off Apr 2018 | 1429 Leavenworth St | Will P K Ng Construction Inc. | seismic upgrade to comply with adopted ord 66-13 soft story retrofit per sfbc ch 34b, iebc 2012 appendix a-4 maher not reqDetails
seismic upgrade to comply with adopted ord 66-13 soft story retrofit per sfbc ch 34b, iebc 2012 appendix a-4 maher not req | $10,000 |
| Sep 15, 2016 | Completed final sign-off Jun 2018 | 150 Gardenside Dr | Will P K Ng Construction Inc. | seismic upgrade to comply with adopted ord 66-13. soft story retrofit per sfbc chap 34 b 2012 iebc app a4Details
seismic upgrade to comply with adopted ord 66-13. soft story retrofit per sfbc chap 34 b 2012 iebc app a4 | $38,000 |
| Sep 13, 2016 | Completed final sign-off Mar 2019 | 644 Lyon St | Will P K Ng Construction Inc. | seismic upgrade to comply with ord 66-13 soft story retrofit sfbc cj 34b 2012 iebc appx a4Details
seismic upgrade to comply with ord 66-13 soft story retrofit sfbc cj 34b 2012 iebc appx a4 | $30,000 |
| Sep 9, 2016 | Completed final sign-off Jan 2017 | 4333 Cabrillo St | Will P K Ng Construction Inc. | convert lower level into habitable space - 3 bedrooms and 1 bath, add media room. no change of layout at upstairs.Details
convert lower level into habitable space - 3 bedrooms and 1 bath, add media room. no change of layout at upstairs. | $30,000 |
| Aug 29, 2016 | Completed final sign-off Apr 2019 | 1296 Haight St | Will P K Ng Construction Inc. | soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b. 2012 iebc appendix a-4 | $18,000 |
| Jul 7, 2016 | Completed final sign-off Jun 2017 | 1643 21st Av | Will P K Ng Construction Inc. | add 3 bedrooms, 2 full baths & mudroom on 1st floor. remodel (e) bathroom & powder room on 2nd floor per plan. remodel (e) bathroom & powder room on 2nd floor per planDetails
add 3 bedrooms, 2 full baths & mudroom on 1st floor. remodel (e) bathroom & powder room on 2nd floor per plan. remodel (e) bathroom & powder room on 2nd floor per plan | $45,000 |
| Jun 21, 2016 | Never finaled issued Jun 2016, no final | 2960 24th Av | Will P K Ng Construction Inc. | inkind repair of approx. 150 sf of stucco siding on front facade due to cracking. no change to any of the decorative trim or wood window surrounds.Details
inkind repair of approx. 150 sf of stucco siding on front facade due to cracking. no change to any of the decorative trim or wood window surrounds. | $8,000 |
| Jun 8, 2016 | Completed final sign-off Sep 2016 | 2347 30th Av | Will P K Ng Construction Inc. | revision to approved app#201605056695. reconfigure kitchen and add one full bath at 2nd floor per plan.Details
revision to approved app#201605056695. reconfigure kitchen and add one full bath at 2nd floor per plan. | $11,000 |
| May 6, 2016 | Completed final sign-off Aug 2017 | 120 Portola Dr | Will P K Ng Construction Inc. | soft story retrofit per sfbc chapter 34b engineering criteria. 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria. 2012 iebc appendix a-4 | $18,000 |
| May 5, 2016 | Completed final sign-off Sep 2016 | 2347 30th Av | Will P K Ng Construction Inc. | remodel kitchen & dining room at 2nd floor. reconfigure layout per planDetails
remodel kitchen & dining room at 2nd floor. reconfigure layout per plan | $23,000 |
| Mar 15, 2016 | Completed final sign-off Aug 2016 | 1238 42nd Av | Will P K Ng Construction Inc. | repair stucco at front in-kind (approx 120 sq ft) under existing lower bay areaDetails
repair stucco at front in-kind (approx 120 sq ft) under existing lower bay area | $3,600 |
| Mar 14, 2016 | Completed final sign-off Aug 2017 | 350 Glenview Dr | Will P K Ng Construction Inc. | rear building 350 glenview dr. sf soft story seimic upgrade per ordinance 66-13, per sfbc, chapter 34b, 2012 iebc appendix a-4.Details
rear building 350 glenview dr. sf soft story seimic upgrade per ordinance 66-13, per sfbc, chapter 34b, 2012 iebc appendix a-4. | $18,000 |
| Jan 20, 2016 | Completed final sign-off Feb 2016 | 448 Gold Mine Dr | Will P K Ng Construction Inc. | comply with complaint #201575982, revision to pa# 201510159838, replace walkway/crawl space floor joist at (e) location per plan.Details
comply with complaint #201575982, revision to pa# 201510159838, replace walkway/crawl space floor joist at (e) location per plan. | $3,000 |
| Dec 22, 2015 | Completed final sign-off Aug 2018 | 1330 Pine St | Will P K Ng Construction Inc. | seismic upgrade to comply w/adopted ordinance 66-13 soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4.Details
seismic upgrade to comply w/adopted ordinance 66-13 soft story retrofit per sfbc chapter 34b 2012 iebc appendix a-4. | $18,000 |
| Nov 30, 2015 | Completed final sign-off Jul 2018 | 1026 Hyde St | Will P K Ng Construction Inc. | commercial- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
commercial- soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $10,000 |
| Nov 30, 2015 | Completed final sign-off Jul 2018 | 1020 Hyde St | Will P K Ng Construction Inc. | residential - soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.Details
residential - soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. | $10,000 |
| Nov 19, 2015 | Never finaled issued Nov 2015, no final | 2960 24th Av | Will P K Ng Construction Inc. | add bathoom, media room & remodel (e) family room at 1st floor per plan.Details
add bathoom, media room & remodel (e) family room at 1st floor per plan. | $33,200 |
| Nov 2, 2015 | Completed final sign-off Feb 2016 | 2333 17th Av | Will P K Ng Construction Inc. | remodel exercise room, add 1/2 bath and study room on ground floor.Details
remodel exercise room, add 1/2 bath and study room on ground floor. | $20,000 |
| Oct 20, 2015 | Completed final sign-off May 2021 | 771 Silver Av | Will P K Ng Construction Inc. | construct (n) 3-story single family dwelling.Details
construct (n) 3-story single family dwelling. | $500,000 |
| Oct 15, 2015 | Completed final sign-off Feb 2016 | 448 Gold Mine Dr | Will P K Ng Construction Inc. | termite repair: all deck & install drainage to let water drainage,replace all termite work, not visible to the street bet detached garage & front door of the house, less than 50%Details
termite repair: all deck & install drainage to let water drainage,replace all termite work, not visible to the street bet detached garage & front door of the house, less than 50% | $5,000 |
| Sep 4, 2015 | Completed final sign-off Aug 2016 | 110 Portola Dr | Will P K Ng Construction Inc. | soft story seismic upgrade (2012 iebc, chapter 34b, appendix a4)Details
soft story seismic upgrade (2012 iebc, chapter 34b, appendix a4) | $18,000 |
| Aug 28, 2015 | Never finaled issued Aug 2015, no final | 654 26th Av | Will P K Ng Construction Inc. | 6 windows and 2 sliding doors with fiberglass sash. u-factor.32 or better.Details
6 windows and 2 sliding doors with fiberglass sash. u-factor.32 or better. | $5,000 |
| Aug 25, 2015 | Never finaled issued Aug 2015, no final | 2960 24th Av | Will P K Ng Construction Inc. | remodel kitchen. 1 1/2 bath room at 2nd flr. in kitchen : replace cabinets, countertops, sink & floor tile. bathrooms: replace tub, vanity & floor tileDetails
remodel kitchen. 1 1/2 bath room at 2nd flr. in kitchen : replace cabinets, countertops, sink & floor tile. bathrooms: replace tub, vanity & floor tile | $33,000 |
| Jul 27, 2015 | Completed final sign-off Mar 2016 | 254 04th Av | Will P K Ng Construction Inc. | structural seismic upgrade per ordinance 66-13 soft story.Details
structural seismic upgrade per ordinance 66-13 soft story. | $18,000 |
| Jul 21, 2015 | Completed final sign-off Feb 2016 | 128 Downey St | Will P K Ng Construction Inc. | soft story seismic upgrade per ordinance 66-13 epr sfbc chapter 34b, 2012 iebc appendix a-4.Details
soft story seismic upgrade per ordinance 66-13 epr sfbc chapter 34b, 2012 iebc appendix a-4. | $8,000 |
| Jun 16, 2015 | Never finaled issued Jun 2015, no final | 3220 Geary Bl | Will P K Ng Construction Inc. | repair roof 1200sf. repair dryout siding 200sf max.Details
repair roof 1200sf. repair dryout siding 200sf max. | $2,500 |
| Mar 30, 2015 | Never finaled issued Mar 2015, no final | 190 Brighton Av | Will P K Ng Construction Inc. | repair sheetrock with area 800 sq ft. remodel extg bathroom at unit #3 only.Details
repair sheetrock with area 800 sq ft. remodel extg bathroom at unit #3 only. | $10,000 |
| Feb 27, 2015 | Expired or cancelled expired Oct 2018 | 1619 Ocean Av | Will P K Ng Construction Inc., I W Construction | remove all the fixture inside rear part of the building to return to empty storage space. to comply with notice of violation 201519291Details
remove all the fixture inside rear part of the building to return to empty storage space. to comply with notice of violation 201519291 | $10,000 |
| Oct 30, 2014 | Completed final sign-off Jan 2015 | 339 Waller St | Will P K Ng Construction Inc. | soft story upgrade to comply with adopted ordinance 66-13. engineering critera: 2012 iebc appendix a-4.Details
soft story upgrade to comply with adopted ordinance 66-13. engineering critera: 2012 iebc appendix a-4. | $10,000 |
| Sep 4, 2014 | Completed final sign-off Sep 2014 | 90 Balceta Av | Will P K Ng Construction Inc. | as-built floor plan to approved application #201403140740.Details
as-built floor plan to approved application #201403140740. | $2,200 |
| Jun 25, 2014 | Completed final sign-off Sep 2014 | 90 Balceta Av | Will P K Ng Construction Inc. | voluntary re-built extg retaining wall at side yard and excavation less then 50 cubic yard.Details
voluntary re-built extg retaining wall at side yard and excavation less then 50 cubic yard. | $13,500 |
| Mar 17, 2014 | Completed final sign-off Sep 2014 | 3226 Geary Bl | Will P K Ng Construction Inc. | remodel extg toilet room and barrier removal for ada compliance.Details
remodel extg toilet room and barrier removal for ada compliance. | $5,000 |
| Mar 14, 2014 | Completed final sign-off Sep 2014 | 90 Balceta Av | Will P K Ng Construction Inc. | add two bedrooms, two full bathrooms and play room at basement floor per planDetails
add two bedrooms, two full bathrooms and play room at basement floor per plan | $36,500 |
| Dec 23, 2013 | Completed final sign-off Jan 2014 | 777 16th Av | Will P K Ng Construction Inc. | install aluminium wood clad windows (3 windows) in front and 14 windows at rear with vinyl windows.Details
install aluminium wood clad windows (3 windows) in front and 14 windows at rear with vinyl windows. | $4,500 |
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 777 16th Av | Will P K Ng Construction Inc. | remove all plaster, put in insulation and sheetrock, in reference to 201309207378 and 201309207424 1 hr property line walls.Details
remove all plaster, put in insulation and sheetrock, in reference to 201309207378 and 201309207424 1 hr property line walls. | $8,000 |
| Jul 29, 2013 | Completed final sign-off Jan 2014 | 2170 35th Av | Will P K Ng Construction Inc. | replace kitchen cabinets with new cabinets.Details
replace kitchen cabinets with new cabinets. | $6,000 |
| Apr 5, 2013 | Completed final sign-off May 2013 | 2578 30th Av | Will P K Ng Construction Inc. | revision to permit application #2012-12-28-6962. for dry rot repair. 130 sq. ft. stucco..Details
revision to permit application #2012-12-28-6962. for dry rot repair. 130 sq. ft. stucco.. | $800 |
| Oct 23, 2012 | Completed final sign-off Nov 2014 | 194 Parker Av | Will P K Ng Construction Inc. | convert (e) storge space into one(1) new dwelling unit by altering ground level storage space at the rear of the (e) 3 unit building with horizontal extension of the first floor.Details
convert (e) storge space into one(1) new dwelling unit by altering ground level storage space at the rear of the (e) 3 unit building with horizontal extension of the first floor. | $130,000 |
| Jan 27, 2012 | Completed final sign-off Mar 2012 | 420 Colon Av | Will P K Ng Construction Inc. | revision/as-built floor layout to pa #201109084155: to comply w/complaint #201280795 - add cabinetry at family room & remove sink (previous permit).Details
revision/as-built floor layout to pa #201109084155: to comply w/complaint #201280795 - add cabinetry at family room & remove sink (previous permit). | |
| Sep 23, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | Will P K Ng Construction Inc. | revision to pa# 2011-0908-4155-comply w/correction notice, replace/repair foundation at ground floor & replace header at kitchen areaDetails
revision to pa# 2011-0908-4155-comply w/correction notice, replace/repair foundation at ground floor & replace header at kitchen area | $6,000 |
| Sep 8, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | Will P K Ng Construction Inc. | remodel play room, storage room & add one bedroom, family room & two bathrooms at ground floor.Details
remodel play room, storage room & add one bedroom, family room & two bathrooms at ground floor. | $33,000 |
| Aug 18, 2011 | Completed final sign-off Mar 2012 | 420 Colon Av | Will P K Ng Construction Inc. | remodel kitchen & 2 bathrooms, no structural work & (n) lighting comply with cec 150 (k), provide carbon monoxide alarm, repair stucco at sides and rear, not visible from street, no structural work, repair and repl stucco in kindDetails
remodel kitchen & 2 bathrooms, no structural work & (n) lighting comply with cec 150 (k), provide carbon monoxide alarm, repair stucco at sides and rear, not visible from street, no structural work, repair and repl stucco in kind | $12,000 |
| Oct 18, 2010 | Completed final sign-off Nov 2010 | 1668 Haight St | Will P K Ng Construction Inc. | replace existing hood i & duct & fan with same specification. ref appl.#201004291311- hood and duct fire protection separate permitDetails
replace existing hood i & duct & fan with same specification. ref appl.#201004291311- hood and duct fire protection separate permit | $15,000 |
| Jun 22, 2010 | Never finaled issued Apr 2011, no final | 62 Schwerin St | Will P K Ng Construction Inc. | to erect 2 stories, single family dwelling unit.Details
to erect 2 stories, single family dwelling unit. | $200,000 |
| Jun 3, 2010 | Completed final sign-off Aug 2010 | 361 West Portal Av | Will P K Ng Construction Inc. | chinese restaurant in an existing restaurant space with existing elec,mech, and plumbing installation of a chinese range with 5 burner, hood and fryer, raising ceiling height at new wood to 9'0. new one hour duct shaft, fire suppression system separate permit.Details
chinese restaurant in an existing restaurant space with existing elec,mech, and plumbing installation of a chinese range with 5 burner, hood and fryer, raising ceiling height at new wood to 9'0. new one hour duct shaft, fire suppression system separate permit. | $10,200 |
| Apr 29, 2010 | Completed final sign-off Jul 2010 | 1668 Haight St | Will P K Ng Construction Inc. | replace water damage gyp bd with 5/8" gyp bd type x area= 1000 ft, repair and repl siding due to dry rot replace in kind, at rear of bldg area-300 ft, not visible from street, no structural workDetails
replace water damage gyp bd with 5/8" gyp bd type x area= 1000 ft, repair and repl siding due to dry rot replace in kind, at rear of bldg area-300 ft, not visible from street, no structural work | $50,000 |
| Apr 6, 2010 | Never finaled issued Feb 2014, no final | 2724 San Bruno Av | Will P K Ng Construction Inc. | to comply with complaint# 200671317 dated 07/12/2006. third story vertical addition for new unit (3rd unit). horizontal addition to 2nd floor. enlarge (e) 2 units on 2nd floor. 2nd required egress has proposed fire escape contingent upon approval of ab-019.Details
to comply with complaint# 200671317 dated 07/12/2006. third story vertical addition for new unit (3rd unit). horizontal addition to 2nd floor. enlarge (e) 2 units on 2nd floor. 2nd required egress has proposed fire escape contingent upon approval of ab-019. | $400,000 |
| Dec 1, 2008 | Completed final sign-off Feb 2009 | 374 24th Av | Harrow Construction Corporation, Will P K Ng Construction Inc. | repair and replace roof deck with new framing, new plywood, drywall in storage room below and tileDetails
repair and replace roof deck with new framing, new plywood, drywall in storage room below and tile | $4,600 |
| May 27, 2008 | Never finaled issued Jul 2008, no final | 809 Taraval St | Will P K Ng Construction Inc. | underpinning for construction of 821 taraval st per approved app 2006-08-23-0337, letter attached with plan.Details
underpinning for construction of 821 taraval st per approved app 2006-08-23-0337, letter attached with plan. | $20,000 |
| Aug 27, 2007 | Completed final sign-off Sep 2007 | 2945 Baker St | Will P K Ng Construction Inc. | repair stair less 50% the structure in kind.Details
repair stair less 50% the structure in kind. | $1,000 |
| Jul 20, 2006 | Completed final sign-off Jul 2006 | 51 Bannan Pl | Will P K Ng Construction Inc. | comply with nov 200670931. repair rear stairs <50%. if greater than 50% plans and city planning approval may be reqd.Details
comply with nov 200670931. repair rear stairs <50%. if greater than 50% plans and city planning approval may be reqd. | $800 |
| Oct 12, 2005 | Completed final sign-off Oct 2005 | 3565 Market St | Will P K Ng Construction Inc. | renew#200407279924,#200501183367 for final inspection.Details
renew#200407279924,#200501183367 for final inspection. | |
| Jul 29, 2005 | Completed final sign-off Oct 2005 | 1771 18th Av | Will P K Ng Construction Inc. | repair sheetrock in dinning & living room. spot repair.Details
repair sheetrock in dinning & living room. spot repair. | $3,000 |
| May 5, 2005 | Completed final sign-off Jul 2005 | 4069 24th St | Will P K Ng Construction Inc. | remove all decayed & rotted treads/risers/loandings/floor board/post and replace w/new treated woodDetails
remove all decayed & rotted treads/risers/loandings/floor board/post and replace w/new treated wood | $3,500 |
| Apr 29, 2005 | Completed final sign-off Aug 2005 | 474 Monterey Bl | Will P K Ng Construction Inc. | replace front door,new stucco for whole front,repair deck on 2 & 3 floor.less than 50% of structuralDetails
replace front door,new stucco for whole front,repair deck on 2 & 3 floor.less than 50% of structural | $15,000 |
| Feb 18, 2005 | Never finaled issued Mar 2009, no final | 520 Balboa St | Will P K Ng Construction Inc. | to demolish a 2 story mixed use bldng. (commercial/residential)Details
to demolish a 2 story mixed use bldng. (commercial/residential) | |
| Feb 18, 2005 | Never finaled issued Mar 2009, no final | 520 Balboa St | Will P K Ng Construction Inc. | erect 4 stories of 3 dwelling units.Details
erect 4 stories of 3 dwelling units. | $700,000 |