Permit GraphShortlistSan Francisco building permits since 2000

Weidong Chen

License
1012190
Contractor
About the Contractors State License Board
State contractor license record
Listed as
authorized agent-others, contractor
Firm
C K Construction
Based in
San Francisco
On San Francisco permits
May 2015 to Jun 2026

38 permits since 2000 (contractor on 37 permits, authorized agent-others on 1 permit): 30 completed, 5 in progress, 3 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Ckg Building Construction, Wing Construction Co.
Architects
Bill Guan, Jeremy Butler-Pinkham, Lisa Qi Ming Zhuo, Shen Chiou
Engineers
Lok C. Kwan (2), Monte Stott (2), Chia Wang Yeh, Darren Wong, Doug Lee, Dustin Muhn, George Ken Wong, John Lau, Kevin O'connor, Micheal Chan, Tuong Xuan Tran

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 22, 2026Completed
final sign-off Aug 2026
5654 Mission StC K Constructionconvert (e) ground floor office into chinese tutoring center. replace and relocate storefront door.
Details
Permit
202606223615
Permit issued
Jun 25, 2026
Final sign-off
Aug 5, 2026

convert (e) ground floor office into chinese tutoring center. replace and relocate storefront door.

Open the permit page

$12,000
Mar 26, 2026In progress
issued Mar 2026
908 Paris StC K Constructionrevision to 202301190397: wall layout reconfiguration, change new ada ramp restroom, ada kid restroom.
Details
Permit
202603268330
Permit issued
Mar 30, 2026

revision to 202301190397: wall layout reconfiguration, change new ada ramp restroom, ada kid restroom.

Open the permit page

$32,000
Mar 11, 2026In progress
issued Mar 2026
1942 44th AvC K Constructionrecommencement and completion of work approved under pa# 201806071280
Details
Permit
202603117387
Permit issued
Mar 11, 2026

recommencement and completion of work approved under pa# 201806071280

Open the permit page

$9,000
Feb 20, 2026Completed
final sign-off May 2026
1608 Balboa StC K Constructionadd 1 bathroom and laundry. replace 6 front windows in kind with vinyl.
Details
Permit
202602206270
Permit issued
Feb 20, 2026
Final sign-off
May 4, 2026

add 1 bathroom and laundry. replace 6 front windows in kind with vinyl.

Open the permit page

$15,000
Aug 11, 2025Completed
final sign-off May 2026
603 San Jose AvC K Construction, Ckg Building Constructionbathroom remodel with 8 sf lightwell infill
Details
Permit
202508112726
Permit issued
Dec 2, 2025
Final sign-off
May 27, 2026

bathroom remodel with 8 sf lightwell infill

Open the permit page

$20,000
Jun 3, 2025Completed
final sign-off Aug 2025
1434 07th AvC K Constructioninstall one more layer of siding board on back exterior wall. not visible from street
Details
Permit
202506037842
Permit issued
Jun 3, 2025
Final sign-off
Aug 15, 2025

install one more layer of siding board on back exterior wall. not visible from street

Open the permit page

$5,000
Sep 12, 2024Completed
final sign-off Feb 2025
1641 Chestnut StC K Construction2/f: bathroom remodel. 3/f: bathroom remodel. (2) shower pans. (all work in kind), no wall construction or demolition.
Details
Permit
202409120662
Permit issued
Sep 12, 2024
Final sign-off
Feb 10, 2025

2/f: bathroom remodel. 3/f: bathroom remodel. (2) shower pans. (all work in kind), no wall construction or demolition.

Open the permit page

$5,000
Aug 19, 2024Completed
final sign-off Feb 2025
1641 Chestnut StC K Constructionrevision to pa # 202406215042: re-configuration of layout at g/f.
Details
Permit
202408198995
Permit issued
Sep 12, 2024
Final sign-off
Feb 19, 2025

revision to pa # 202406215042: re-configuration of layout at g/f.

Open the permit page

Jun 21, 2024Completed
final sign-off Feb 2025
1641 Chestnut StC K Constructionremodel (e) kitchen, relocate (e) bathroom. add one bedroom, laundry room, & replace (e) sheetrock w/ new. all work at g/f.
Details
Permit
202406215042
Permit issued
Jul 22, 2024
Final sign-off
Feb 19, 2025

remodel (e) kitchen, relocate (e) bathroom. add one bedroom, laundry room, & replace (e) sheetrock w/ new. all work at g/f.

Open the permit page

$178,200
Apr 11, 2023Completed
final sign-off May 2024
2047 BroadwayC K Constructioninterior renovation of (e) non-accessible, approx. 500sf studio apt including kitchen, bath remodel, new electrical/plumbing, new windows all within (e) bldg envelope. street facing exterior window modification.
Details
Permit
202304115460
Permit issued
Sep 22, 2023
Final sign-off
May 28, 2024

interior renovation of (e) non-accessible, approx. 500sf studio apt including kitchen, bath remodel, new electrical/plumbing, new windows all within (e) bldg envelope. street facing exterior window modification.

Open the permit page

$30,000
Mar 14, 2023Never finaled
issued Jul 2023, no final
118 Buena Vista TrC K Constructionconstruct new retaining wall at rear yard
Details
Permit
202303143687
Permit issued
Jul 17, 2023

construct new retaining wall at rear yard

Open the permit page

$20,000
Jan 26, 2023In progress
issued Sep 2025
355 Capp StC K Constructionunit legalization per ordinance 43-14, planning code section 207.3. legalize (e) dwelling unit 355a capp st. unit included bedrooms, bathroom, and kitchen. (adu under pa# 202008081399)
Details
Permit
202301260851
Permit issued
Sep 23, 2025

unit legalization per ordinance 43-14, planning code section 207.3. legalize (e) dwelling unit 355a capp st. unit included bedrooms, bathroom, and kitchen. (adu under pa# 202008081399)

Open the permit page

$35,000
Jan 19, 2023In progress
issued Jun 2025
908 Paris StC K Construction, Wing Construction Co.change of use from salon barber school to child care center. tenant improvement, demo some non-bearing partition walls, 2 new restroom, one for kid one for adult. set up 3 child class room, one office.
Details
Permit
202301190397
Permit issued
Jun 20, 2025

change of use from salon barber school to child care center. tenant improvement, demo some non-bearing partition walls, 2 new restroom, one for kid one for adult. set up 3 child class room, one office.

Open the permit page

$60,000
Jul 28, 2022Completed
final sign-off Feb 2023
562 Hearst AvC K Constructionfix second floor windows look out. repair sill at front bay window in kind
Details
Permit
202207289523
Permit issued
Jul 28, 2022
Final sign-off
Feb 8, 2023

fix second floor windows look out. repair sill at front bay window in kind

Open the permit page

$3,000
Aug 24, 2021Completed
final sign-off Apr 2022
82 Lydia AvC K Constructionpartially convert existing garage space into habitable space. total conversion = 489 sf. including family room with wetbar, 1 bedroom, 1 den. no change to existing water heater or fau unit. no change to exterior or upper floor space.
Details
Permit
202108247071
Permit issued
Sep 23, 2021
Final sign-off
Apr 21, 2022

partially convert existing garage space into habitable space. total conversion = 489 sf. including family room with wetbar, 1 bedroom, 1 den. no change to existing water heater or fau unit. no change to exterior or upper floor space.

Open the permit page

$20,000
Jul 26, 2021Completed
final sign-off Apr 2022
3401 20th StC K Constructionremodel kitchen and bathroom. one kithcen, one bath.
Details
Permit
202107265061
Permit issued
Jul 26, 2021
Final sign-off
Apr 7, 2022

remodel kitchen and bathroom. one kithcen, one bath.

Open the permit page

$44,600
Jul 26, 2021Completed
final sign-off May 2022
892 Noe StC K Constructionremodel kitchen and bathroom. one bath & one kitchen
Details
Permit
202107265062
Permit issued
Jul 26, 2021
Final sign-off
May 24, 2022

remodel kitchen and bathroom. one bath & one kitchen

Open the permit page

$42,600
Feb 10, 2021Completed
final sign-off Apr 2022
355 Capp StC K Constructioninterior renovation: includes selective demo and new construction of non structural partitions, addition of half bath, reconfigure walls to add one bedroom, (e) kitchen and bathroom finishes, appliances, fixtures and cabinet replacement.
Details
Permit
202102104423
Permit issued
Apr 20, 2021
Final sign-off
Apr 12, 2022

interior renovation: includes selective demo and new construction of non structural partitions, addition of half bath, reconfigure walls to add one bedroom, (e) kitchen and bathroom finishes, appliances, fixtures and cabinet replacement.

Open the permit page

$20,000
Aug 8, 2020In progress
issued Nov 2024
355 Capp StC K Constructionadd 1 (n) dwelling unit (adu) per ca govt section 65852.2: convert (e) garage and storage space to one new adu. new unit within existing building footprint. new units included bedrooms, bathroom, and kitchen.
Details
Permit
202008081399
Permit issued
Nov 12, 2024

add 1 (n) dwelling unit (adu) per ca govt section 65852.2: convert (e) garage and storage space to one new adu. new unit within existing building footprint. new units included bedrooms, bathroom, and kitchen.

Open the permit page

$50,000
Nov 5, 2019Completed
final sign-off Nov 2019
867 47th AvC K Constructionadd 1 handrail at stairs from kitchen area to downstairs
Details
Permit
201911056509
Permit issued
Nov 8, 2019
Final sign-off
Nov 14, 2019

add 1 handrail at stairs from kitchen area to downstairs

Open the permit page

$200
Sep 26, 2019Never finaled
issued Sep 2019, no final
867 47th Avstreet space
Details
Permit
M1143707
Permit issued
Sep 26, 2019

street space

Open the permit page

Sep 12, 2019Completed
final sign-off May 2020
543 Chenery StC K Constructioninterior renovation: convert part of the garage into 1 bedroom, 1 bath room, a closet, there is no vertical or horizontal expansion outside the building envelope
Details
Permit
201909121492
Permit issued
Oct 21, 2019
Final sign-off
May 4, 2020

interior renovation: convert part of the garage into 1 bedroom, 1 bath room, a closet, there is no vertical or horizontal expansion outside the building envelope

Open the permit page

$50,000
Jun 18, 2019Completed
final sign-off Feb 2020
2821 Taraval StC K Constructionnew bedroom, bathroom, laundry @ ground floor. remodel (e) kitchen & bathroom @ 2nd floor. remove fireplace
Details
Permit
201906183694
Permit issued
Jul 11, 2019
Final sign-off
Feb 12, 2020

new bedroom, bathroom, laundry @ ground floor. remodel (e) kitchen & bathroom @ 2nd floor. remove fireplace

Open the permit page

$75,000
Jun 18, 2019Completed
final sign-off Jul 2022
118 Buena Vista TrC K Constructionadd elevator & vestibule at rear covered deck, from ground floor to 3rd floor. remove rear exterior stair from 2nd to rear yard. add roof/trellis above rear patio.
Details
Permit
201906183684
Permit issued
Aug 20, 2020
Final sign-off
Jul 27, 2022

add elevator & vestibule at rear covered deck, from ground floor to 3rd floor. remove rear exterior stair from 2nd to rear yard. add roof/trellis above rear patio.

Open the permit page

$90,000
May 20, 2019Completed
final sign-off Dec 2019
712 Garfield StC K Constructionconstruct 2 bedrm, 2 full bathrm, install front door at at grnd flr. remodel (e) kitchen, bathrm, add one new bathrm & convert dining space to bedrm at 2nd flr. install new skylight above (e) light weel on roof
Details
Permit
201905201059
Permit issued
Jun 4, 2019
Final sign-off
Dec 30, 2019

construct 2 bedrm, 2 full bathrm, install front door at at grnd flr. remodel (e) kitchen, bathrm, add one new bathrm & convert dining space to bedrm at 2nd flr. install new skylight above (e) light weel on roof

Open the permit page

$78,000
Feb 11, 2019Completed
final sign-off Jul 2019
892 Noe StC K Constructionunit #b: remodel kitchen, 9'x9' and bathroom, 7 1/2'x5'
Details
Permit
201902112650
Permit issued
Feb 11, 2019
Final sign-off
Jul 9, 2019

unit #b: remodel kitchen, 9'x9' and bathroom, 7 1/2'x5'

Open the permit page

$9,000
Jan 29, 2019Completed
final sign-off May 2020
2507 37th AvC K Constructioninterior remodel of kitchen, living, master suites, wall and ceiling finishes, and lighting. enclose extg entry lightwell into interior stairway, addition of 2 new fixed skylights.
Details
Permit
201901291524
Permit issued
Mar 1, 2019
Final sign-off
May 11, 2020

interior remodel of kitchen, living, master suites, wall and ceiling finishes, and lighting. enclose extg entry lightwell into interior stairway, addition of 2 new fixed skylights.

Open the permit page

$200,000
Jan 18, 2019Completed
final sign-off Mar 2020
867 47th AvC K Constructioncomply w/ complaint #201919751. per ordinance# 43-14, legalize existing ground floor space to a unit - 2 bedrooms, 1 bath, kitchen, fire wall in garage to living space.
Details
Permit
201901180803
Permit issued
Sep 20, 2019
Final sign-off
Mar 5, 2020

comply w/ complaint #201919751. per ordinance# 43-14, legalize existing ground floor space to a unit - 2 bedrooms, 1 bath, kitchen, fire wall in garage to living space.

Open the permit page

$5,000
Nov 15, 2018Completed
final sign-off Jul 2023
1266 07th AvC K Constructionconvert extg unused basement space to one bedroom dwelling unit.
Details
Permit
201811156049
Permit issued
Apr 12, 2021
Final sign-off
Jul 24, 2023

convert extg unused basement space to one bedroom dwelling unit.

Open the permit page

$100,000
May 9, 2018Never finaled
filed May 2018, never issued
147 Bright StC K Constructionunit legalization per ordinance# 43-14. legalize unpermitted work. backyard addition @ 250 sf ground floor for adu. total 2 bed, 1 bath. kitchen. new opening face street @ ground floor.
Details
Permit
201805098700

unit legalization per ordinance# 43-14. legalize unpermitted work. backyard addition @ 250 sf ground floor for adu. total 2 bed, 1 bath. kitchen. new opening face street @ ground floor.

Open the permit page

$80,000
Apr 10, 2018Completed
final sign-off Mar 2019
1266 07th AvC K Constructionreplace (e) fire escape stair (rotted). remodel (e) kitchen and remove wall btw kit/din. new master bath and ldry r, in (e) areas. no addition to (e) bld conditioned area
Details
Permit
201804105925
Permit issued
Apr 23, 2018
Final sign-off
Mar 21, 2019

replace (e) fire escape stair (rotted). remodel (e) kitchen and remove wall btw kit/din. new master bath and ldry r, in (e) areas. no addition to (e) bld conditioned area

Open the permit page

$60,000
Mar 26, 2018Completed
final sign-off Feb 2019
3810 Divisadero StC K Constructionrevision to permit app #201505146298 to remove ada requirements. ada upgrades not required. maher na
Details
Permit
201803264572
Permit issued
Mar 29, 2018
Final sign-off
Feb 1, 2019

revision to permit app #201505146298 to remove ada requirements. ada upgrades not required. maher na

Open the permit page

Mar 20, 2018Completed
final sign-off May 2018
1009 Geneva AvC K Construction1st floor: create hallway for exit. remove half bathroom
Details
Permit
201803204166
Permit issued
Mar 26, 2018
Final sign-off
May 14, 2018

1st floor: create hallway for exit. remove half bathroom

Open the permit page

$2,000
Feb 13, 2018Completed
final sign-off Mar 2021
146 Naples StC K Construction1st floor: add playroom and half bath.
Details
Permit
201802131179
Permit issued
Aug 4, 2020
Final sign-off
Mar 29, 2021

1st floor: add playroom and half bath.

Open the permit page

$30,000
Sep 11, 2017Completed
final sign-off Apr 2018
1946 30th AvC K Constructionconvert garage into habitable space. 2 bedrooms, 1 full bath, laundry room, enclose foyer. remove interconnecting stair. add 1 bath at upper floor. infill lightwell w/ new skylight.
Details
Permit
201709117472
Permit issued
Oct 10, 2017
Final sign-off
Apr 30, 2018

convert garage into habitable space. 2 bedrooms, 1 full bath, laundry room, enclose foyer. remove interconnecting stair. add 1 bath at upper floor. infill lightwell w/ new skylight.

Open the permit page

$60,000
Sep 8, 2016Completed
final sign-off Apr 2017
2710 23rd StC K Constructionremodel kitchen & 1 bathroom
Details
Permit
201609087026
Permit issued
Sep 8, 2016
Final sign-off
Apr 25, 2017

remodel kitchen & 1 bathroom

Open the permit page

$15,000
Jun 14, 2016Completed
final sign-off Aug 2022
397 Crescent AvC K Constructionremodel kitchen and bathroom, change lighting, replace floor, drywall,painting wall. replace doors (2nd floor) drywall to be replaced with 5/8"type x gwb, with 5d cooler nails 4" oc or equal. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.
Details
Permit
201606149962
Permit issued
Jun 14, 2016
Final sign-off
Aug 30, 2022

remodel kitchen and bathroom, change lighting, replace floor, drywall,painting wall. replace doors (2nd floor) drywall to be replaced with 5/8"type x gwb, with 5d cooler nails 4" oc or equal. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.

Open the permit page

$53,080
May 14, 2015Completed
final sign-off Feb 2019
3810 Divisadero StC K Constructionlegalized as built unit @ ground level. the building had combined 2 units to 1 unit at 4th fl under permit appl #8810605, from 6 units become 5 units building. legalized as built unit is just restore the bldg back to 6 unit bldg. add unit per ordinance no 43-14.
Details
Permit
201505146298
Permit issued
Jun 30, 2017
Final sign-off
Feb 1, 2019

legalized as built unit @ ground level. the building had combined 2 units to 1 unit at 4th fl under permit appl #8810605, from 6 units become 5 units building. legalized as built unit is just restore the bldg back to 6 unit bldg. add unit per ordinance no 43-14.

Open the permit page

$30,000