Todd Davis
- Listed as
- architect, authorized agent-others
- Firm
- Todd Davis Architecture
- Based in
- Sf
- On San Francisco permits
- Sep 2003 to Aug 2025
46 permits since 2000 (architect on 42 permits, authorized agent-others on 4 permits): 41 completed, 1 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 27, 2025 | Completed final sign-off Mar 2026 | 4054 20th St | Saturn Construction Co | replace existing stucco facade and stair treads and garage door and stair trellisDetails
replace existing stucco facade and stair treads and garage door and stair trellis | $110,000 |
| Jul 22, 2025 | In progress issued Oct 2025 | 750 El Camino Del Mar | Rcp Construction Llc | replace all doors & window, replace all exterior stucco, 44sf infill on rear facade, (n) front, side & rear fencing, replace tile roof in kind, interior remodel: including (e) kitchen & bathrooms, add 2 bathooms on 3/f. (n) elevator, updating all mep (n) rear yard pool & terrace under separate pa.Details
replace all doors & window, replace all exterior stucco, 44sf infill on rear facade, (n) front, side & rear fencing, replace tile roof in kind, interior remodel: including (e) kitchen & bathrooms, add 2 bathooms on 3/f. (n) elevator, updating all mep (n) rear yard pool & terrace under separate pa. | $500,000 |
| Jun 4, 2020 | Never finaled issued Sep 2020, no final | 126 Commonwealth Av | Saturn Construction Co | convert 3rd floor single bedroom with one bathroom into two bedrooms and one bathroomDetails
convert 3rd floor single bedroom with one bathroom into two bedrooms and one bathroom | $80,000 |
| Sep 11, 2019 | Completed final sign-off Jan 2021 | 468 Pennsylvania Av | Saturn Construction Co | 2nd floor kitchen and bathroom remodel, replace extg door with bi-fold. 3rd floor bathroom remodel, replace rear bedroom door/window with new window and remove bridge to rear yardDetails
2nd floor kitchen and bathroom remodel, replace extg door with bi-fold. 3rd floor bathroom remodel, replace rear bedroom door/window with new window and remove bridge to rear yard | $160,000 |
| Jul 11, 2019 | Completed final sign-off Jul 2020 | 333 Texas St | Saturn Construction Co | remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace.Details
remove garage stair & rear patio stair. remodel (e) kitchen & bathroom, add 1 (n) bathroom, replace rear window/door with/bi-fold door. remove (e) fireplace. | $180,000 |
| Jun 5, 2019 | Completed final sign-off Feb 2020 | 1636 Diamond St | Saturn Construction Co | rewaterproof (e) deck, remove penthouse window and infill, update guardrails deck to have same foot print and square footage. replace kitchen window w/bi-fold door. all windows not street visible. max 0.32 u-factor or better.Details
rewaterproof (e) deck, remove penthouse window and infill, update guardrails deck to have same foot print and square footage. replace kitchen window w/bi-fold door. all windows not street visible. max 0.32 u-factor or better. | $60,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2020 | 1723 Church St | revision to pa #201203095741 s-1. 1st fl - relocate (e) powder room to under stairs. 2nd fl - relocate (e) powder room to existing hallway closet. remove from scope shower stall addition. eliminate spiral stair, d204, w204, w206 from scope.Details
revision to pa #201203095741 s-1. 1st fl - relocate (e) powder room to under stairs. 2nd fl - relocate (e) powder room to existing hallway closet. remove from scope shower stall addition. eliminate spiral stair, d204, w204, w206 from scope. | ||
| Nov 28, 2018 | Completed final sign-off Sep 2025 | 145 Buchanan St | Cannon General Contracting Inc | remodel (e) kitchen (150 sq. ft.) & (e) (2) bathrooms (30 sq. ft./20 sq. ft. respectively)Details
remodel (e) kitchen (150 sq. ft.) & (e) (2) bathrooms (30 sq. ft./20 sq. ft. respectively) | $80,000 |
| May 23, 2018 | Completed final sign-off Nov 2018 | 3818 Cesar Chavez St | Hi Level Inc | front facade remodel: replace and reconfigure windows, update (e) stair, (n) wood siding, remove concrete planters@ stair.Details
front facade remodel: replace and reconfigure windows, update (e) stair, (n) wood siding, remove concrete planters@ stair. | $60,000 |
| Oct 18, 2017 | Completed final sign-off Sep 2018 | 1051 Powhattan Av | Saturn Construction Co | remodel master bathroom in kind. add (n) bathroom. (n) window in bedroom. rpelace 3 windows on rear facade.Details
remodel master bathroom in kind. add (n) bathroom. (n) window in bedroom. rpelace 3 windows on rear facade. | $30,000 |
| Aug 30, 2017 | Completed final sign-off Mar 2021 | 2445 Franklin St | (n) interior stair from 1st fl to (e) ground fl rooms. (n) bathroom in ground fl rooms; convert (e) storage room to bedroom and playroom.Details
(n) interior stair from 1st fl to (e) ground fl rooms. (n) bathroom in ground fl rooms; convert (e) storage room to bedroom and playroom. | $80,000 | |
| May 4, 2017 | Completed final sign-off Nov 2017 | 51 Nebraska St | Saturn Construction Co | remodel kitchen. no structural work.Details
remodel kitchen. no structural work. | $21,000 |
| May 4, 2017 | Completed final sign-off Nov 2017 | 51 Nebraska St | Saturn Construction Co | inkind replacement of 9 bonelli windows and sliding doors in front and rear facades; inkind replacement of 2 existing roof-mounted skylights with skylights less than 12" above the roof surface; no other workDetails
inkind replacement of 9 bonelli windows and sliding doors in front and rear facades; inkind replacement of 2 existing roof-mounted skylights with skylights less than 12" above the roof surface; no other work | $30,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2018 | 169 Amber Dr | Saturn Construction Co | replace (e) 18 windows & update, alum clad wood. replace (e) sidingDetails
replace (e) 18 windows & update, alum clad wood. replace (e) siding | $60,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2018 | 169 Amber Dr | Saturn Construction Co | revision to pa 2017-0210-9133 structural updates to enlarge openingsDetails
revision to pa 2017-0210-9133 structural updates to enlarge openings | $50,000 |
| Mar 20, 2017 | Completed final sign-off Dec 2017 | 154 Juanita Wy | Aaron Gordon Construction Inc | interior remodel of ground floor to include 1)remodel extg bathroom, 2)add new office(133 sq ft). 3)update electrical.Details
interior remodel of ground floor to include 1)remodel extg bathroom, 2)add new office(133 sq ft). 3)update electrical. | $60,000 |
| Feb 10, 2017 | Completed final sign-off Jun 2018 | 169 Amber Dr | Saturn Construction Co | remodel 2 bathrooms & 1 half bathroom; add (n) bathroom to 2nd floor. remodel kitchen & bedrooms. update electrical & plumbingDetails
remodel 2 bathrooms & 1 half bathroom; add (n) bathroom to 2nd floor. remodel kitchen & bedrooms. update electrical & plumbing | $120,000 |
| Dec 12, 2016 | Completed final sign-off Aug 2017 | 1144 Pine St | Norcal Painting & Remodeling | revision to pa 2016-0614-9855 change interior layoutDetails
revision to pa 2016-0614-9855 change interior layout | |
| Jun 1, 2016 | Completed final sign-off Jul 2017 | 388 Fulton St | C & C General Engineering Inc. | change of use from retail to restaurant use. add a type 41 liquor licenseDetails
change of use from retail to restaurant use. add a type 41 liquor license | |
| Mar 22, 2016 | Completed final sign-off Sep 2016 | 270 States St | Saturn Construction Co | kitchen remodel. update electrical switches & lighting. remove (e) gas fireplace.Details
kitchen remodel. update electrical switches & lighting. remove (e) gas fireplace. | $40,000 |
| Feb 26, 2016 | Completed final sign-off Jan 2017 | 1032 Castro St | Barron Construction Inc. | kitchen remodel, infill (e) lightwell, remove fireplace (n) skylight in (e) bathroom and kitchen.Details
kitchen remodel, infill (e) lightwell, remove fireplace (n) skylight in (e) bathroom and kitchen. | $60,000 |
| Oct 14, 2015 | Completed final sign-off Jul 2016 | 720 York St | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $30,000 | |
| Jul 20, 2015 | Completed final sign-off Nov 2015 | 958 Carolina St | Saturn Construction Co | bathroom remodel, same location, 2nd flrDetails
bathroom remodel, same location, 2nd flr | $30,000 |
| Jul 8, 2015 | Completed final sign-off May 2016 | 518 Rockdale Dr | Trinity Building Co Llc | remodel (e) bathroom & convert (e) den to bedroom, new office, w/c in (e) envelope, add 120 sf to (e) rear deck. all work @ ground floor levelDetails
remodel (e) bathroom & convert (e) den to bedroom, new office, w/c in (e) envelope, add 120 sf to (e) rear deck. all work @ ground floor level | $120,000 |
| Jun 3, 2015 | Completed final sign-off Feb 2016 | 471 Lombard St | Saturn Construction Co | remodel 1st flr & add (n) bathroom, laundry & closet, remodel 2nd flr & add 1/2 bathroom, replace (e) windows on both floors, remodel (e) deck & remove (e) spiral staircase.Details
remodel 1st flr & add (n) bathroom, laundry & closet, remodel 2nd flr & add 1/2 bathroom, replace (e) windows on both floors, remodel (e) deck & remove (e) spiral staircase. | $180,000 |
| Feb 20, 2015 | Expired or cancelled withdrawn Aug 2015 | 86 Whitney St | 136 sf rear yard addition to include (n) master bathroom. 76 sf deck off proposed addition.Details
136 sf rear yard addition to include (n) master bathroom. 76 sf deck off proposed addition. | $90,000 | |
| Feb 6, 2015 | Completed final sign-off Dec 2015 | 1108 Page St | Saturn Construction Co | ground fl: remove (e) fireplace base, add moment frame, remodel bathroom. 2nd fl: remove fireplace, add moment frame, remodel kitchen, relocate bathroom.Details
ground fl: remove (e) fireplace base, add moment frame, remodel bathroom. 2nd fl: remove fireplace, add moment frame, remodel kitchen, relocate bathroom. | $120,000 |
| Dec 16, 2014 | Completed final sign-off Apr 2015 | 86 Whitney St | Aaron Gordon Construction Inc | enlarge garage door @ front, add moment frame at door, removes posts in garage and add steel beam.Details
enlarge garage door @ front, add moment frame at door, removes posts in garage and add steel beam. | $30,000 |
| Sep 3, 2014 | Completed final sign-off Jan 2015 | 1501 Taylor St | refinish hardwood floor. build ada bathroom. remove soffits, build changing alcove wall.demo extg bathrooms. build stairway. n/a for the maher ordinance #155-13.Details
refinish hardwood floor. build ada bathroom. remove soffits, build changing alcove wall.demo extg bathrooms. build stairway. n/a for the maher ordinance #155-13. | $20,000 | |
| Aug 19, 2014 | Completed final sign-off Oct 2014 | 60 Arguello Bl | Matarozzi/Pelsinger Builders Inc. | revision to permit 201405216419 inspector deemed work over 50%; upgrade guard rails to current code, replace (e) deck withh new decking same footprint.Details
revision to permit 201405216419 inspector deemed work over 50%; upgrade guard rails to current code, replace (e) deck withh new decking same footprint. | $5,000 |
| Jul 28, 2014 | Completed final sign-off Oct 2014 | 60 Arguello Bl | Matarozzi/Pelsinger Builders Inc. | replace 50% (e) deck on (e) deck @ rear. upgrade guardrails ot current code. repair less than 50%.Details
replace 50% (e) deck on (e) deck @ rear. upgrade guardrails ot current code. repair less than 50%. | $3,000 |
| May 9, 2014 | Completed final sign-off May 2017 | 132 Presidio Av | Matarozzi/Pelsinger Builders Inc. | (work to be done on unit#132 & 136). interior remodel of (e) unit#132 (3rd & 4th fl). replace (e) asphalt shingle mansard roof with (n) standing-seam perforated zinc roof. add (e) sotrage room to unit#136 habitable area (no increase in g.f.a) (n) windows where indicated. replace (e) windows in kindDetails
(work to be done on unit#132 & 136). interior remodel of (e) unit#132 (3rd & 4th fl). replace (e) asphalt shingle mansard roof with (n) standing-seam perforated zinc roof. add (e) sotrage room to unit#136 habitable area (no increase in g.f.a) (n) windows where indicated. replace (e) windows in kind | $200,000 |
| Mar 14, 2014 | Completed final sign-off Jun 2014 | 2025 Hayes St | Saturn Construction Co | remodel kitchen: (n) cabinets, appliances, plumbing fixtures, countertops, remov e(e) cabinets & door to dining room.Details
remodel kitchen: (n) cabinets, appliances, plumbing fixtures, countertops, remov e(e) cabinets & door to dining room. | $30,000 |
| Jan 30, 2014 | Never finaled issued Jun 2014, no final | 1740 Buchanan St | change of use retail video store to dance studio. establish dance studio on 2nd floor no proposed alterations or construction.Details
change of use retail video store to dance studio. establish dance studio on 2nd floor no proposed alterations or construction. | ||
| Aug 23, 2013 | Completed final sign-off Apr 2014 | 841 Wisconsin St | Saturn Construction Co | #839: repiar extg deck, replace doors and windows on deck facade. repair and replace overhang, new lighting. #841: replace door and windows on deck facade, new electrical.Details
#839: repiar extg deck, replace doors and windows on deck facade. repair and replace overhang, new lighting. #841: replace door and windows on deck facade, new electrical. | $20,000 |
| Jul 12, 2013 | Completed final sign-off Feb 2014 | 307 Shotwell St | Matarozzi/Pelsinger Builders Inc. | partial demo of middle concrete structure (studio)Details
partial demo of middle concrete structure (studio) | $5,000 |
| Jul 12, 2013 | Completed final sign-off Feb 2014 | 307 Shotwell St | Matarozzi/Pelsinger Builders Inc. | enlarge garage door.Details
enlarge garage door. | $5,000 |
| Jun 13, 2013 | Completed final sign-off Feb 2014 | 307 Shotwell St | Matarozzi/Pelsinger Builders Inc. | remodel bathroom, add w.c & new door off bedroom & update electrical and plumbg in rear of residence. rebuild extg fences to same dimensions 10' height fence. add 3'-0" overhang.Details
remodel bathroom, add w.c & new door off bedroom & update electrical and plumbg in rear of residence. rebuild extg fences to same dimensions 10' height fence. add 3'-0" overhang. | $30,000 |
| Feb 22, 2013 | Completed final sign-off Jun 2013 | 3315 20th St | revision to appl #2013.01.29.9030 - change entrance gate to door, remov evestibule wall, adjust partitoin wall on plans to line up with mullion.Details
revision to appl #2013.01.29.9030 - change entrance gate to door, remov evestibule wall, adjust partitoin wall on plans to line up with mullion. | ||
| Jan 29, 2013 | Completed final sign-off Jun 2013 | 3315 20th St | change of occup from f1 to b occup. remove concrete slabs & tile floor. remove wall over hang above old dryers. build ada bathroom using extg toilet. build partition with door. install new stackable washer & dryer. lay hardwood floor, install overhead radiant heat. remove old plumbing from wahsers.Details
change of occup from f1 to b occup. remove concrete slabs & tile floor. remove wall over hang above old dryers. build ada bathroom using extg toilet. build partition with door. install new stackable washer & dryer. lay hardwood floor, install overhead radiant heat. remove old plumbing from wahsers. | $70,000 | |
| Mar 9, 2012 | Completed final sign-off Nov 2013 | 1721 Church St | convert (e) 2 story barn into a guest house dwelling unit with 2 bedroom, kitchen, bathroom & 1/2 bathroom.Details
convert (e) 2 story barn into a guest house dwelling unit with 2 bedroom, kitchen, bathroom & 1/2 bathroom. | $70,000 | |
| Mar 9, 2012 | Completed final sign-off Aug 2020 | 1723 Church St | remodel of 1st floor adding living space & setting back garage door. infill under courtyard overhang. remodel of 2nd floor kitchen & master bathroom. deck repair. replace (e) courtyard wood stair 2ith spiral metal stair. new windows in both floors except front facade & dining room.Details
remodel of 1st floor adding living space & setting back garage door. infill under courtyard overhang. remodel of 2nd floor kitchen & master bathroom. deck repair. replace (e) courtyard wood stair 2ith spiral metal stair. new windows in both floors except front facade & dining room. | $80,000 | |
| Nov 6, 2009 | Completed final sign-off Oct 2011 | 35 Liberty St | Becca Construction Inc | 2 story addition to the upper and lower units into the rear yard 7'6" (330sf). 2 new full bathrooms, 2 new laundr rooms. new roof deck eith a new stair penthouse to access it on the upper level. moving (e) spiral metal stair to the center of the rear facade.Details
2 story addition to the upper and lower units into the rear yard 7'6" (330sf). 2 new full bathrooms, 2 new laundr rooms. new roof deck eith a new stair penthouse to access it on the upper level. moving (e) spiral metal stair to the center of the rear facade. | $200,000 |
| Jun 3, 2009 | Completed final sign-off Aug 2009 | 27 Latona St | Elisha Mayost | replace existing stairs per inspector request. report # cc-5497. bldg record a/p 273059.Details
replace existing stairs per inspector request. report # cc-5497. bldg record a/p 273059. | $2,000 |
| May 11, 2005 | Never finaled issued May 2005, no final | 357 Tehama St | Becca Construction Inc | remodel (e) 1 bedroom, 2 bathroom. add new bath / bedroom. kitchen remodel.Details
remodel (e) 1 bedroom, 2 bathroom. add new bath / bedroom. kitchen remodel. | $40,000 |
| Sep 5, 2003 | Completed final sign-off Jan 2004 | 401 Hayes St | new wood sleeper floor on top of concrete fire resistive floor at grd floor.Details
new wood sleeper floor on top of concrete fire resistive floor at grd floor. | $4,000 |