Permit GraphShortlistSan Francisco building permits since 2000

Laura Rambin

License
C27742
Look the license up with the state
Listed as
architect
Firm
Studio Bondy Architecture
Based in
Oakland
On San Francisco permits
Sep 2018 to May 2024

27 permits since 2000 (architect on 27 permits): 17 completed, 2 in progress, 6 never finaled, 2 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
May 29, 2024In progress
issued Aug 2024
3250 19th AvThompson Builders Corp, Kevin M. Sullivan & Associates Incstorm water prevention ref pa 2022-0908-2129
Details
Permit
202405293239
Status
issued
Filed
May 29, 2024
Permit issued
Aug 29, 2024
Address
3250 19th Av

storm water prevention ref pa 2022-0908-2129

Open the permit page

Dec 5, 2023Completed
final sign-off Jan 2026
755 Ashbury StPlant Construction Co, Lprenovate exterior play space and parking area, includes installation of play equipment.
Details
Permit
202312051959
Status
complete
Filed
Dec 5, 2023
Permit issued
Jan 29, 2024
Final sign-off
Jan 7, 2026
Declared cost
$325,000
Address
755 Ashbury St

renovate exterior play space and parking area, includes installation of play equipment.

Open the permit page

$325,000
Nov 20, 2023In progress
issued Nov 2023
300 Page StHerrero Builders Incorporatedrevision to bpa#202212168528, add smoke detector access hatch to elevator hoistway per sffd ab 2.01
Details
Permit
202311201131
Status
issued
Filed
Nov 20, 2023
Permit issued
Nov 27, 2023
Declared cost
$1,000
Address
300 Page St

revision to bpa#202212168528, add smoke detector access hatch to elevator hoistway per sffd ab 2.01

Open the permit page

$1,000
Feb 13, 2023Completed
final sign-off May 2025
1245 04th StOnsite Construxtenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred.
Details
Permit
202302131874
Status
complete
Filed
Feb 13, 2023
Permit issued
Aug 30, 2023
Final sign-off
May 14, 2025
Declared cost
$180,000
Address
1245 04th St

tenant improvement. adding children's restroom and kitchenette. establishing e occupancy in vacant retail suite. mep deferred.

Open the permit page

$180,000
Dec 16, 2022Completed
final sign-off Mar 2025
300 Page StHerrero Builders Incorporatedsf zen center modernization and ada upgrades. work includes renovated ada upgrades @ page st, new elevator, new interior lift adj to laguna entrance. new restrooms @ each floor, upgraded mech ventilation at zendo basement level. to comply w/his nov 201470281 - ada upgrades/grab bars. mep deferred
Details
Permit
202212168528
Status
complete
Filed
Dec 16, 2022
Permit issued
Mar 16, 2023
Final sign-off
Mar 11, 2025
Declared cost
$3,400,000
Address
300 Page St

sf zen center modernization and ada upgrades. work includes renovated ada upgrades @ page st, new elevator, new interior lift adj to laguna entrance. new restrooms @ each floor, upgraded mech ventilation at zendo basement level. to comply w/his nov 201470281 - ada upgrades/grab bars. mep deferred

Open the permit page

$3,400,000
Sep 8, 2022Never finaled
issued Jun 2023, no final
3250 19th AvThompson Builders Corppriority process - interior & exterior remodel: structural seismic retrofit, accommodating per-school & elementary classrooms, & provide accessible toilet rooms fpr staff & students. sitework: remove & construct in (n) play areas(landscape/hardscape/play trucrures/basketball courts/fences/gates.
Details
Permit
202209082129
Status
issued
Filed
Sep 8, 2022
Permit issued
Jun 28, 2023
Declared cost
$3,200,000
Address
3250 19th Av

priority process - interior & exterior remodel: structural seismic retrofit, accommodating per-school & elementary classrooms, & provide accessible toilet rooms fpr staff & students. sitework: remove & construct in (n) play areas(landscape/hardscape/play trucrures/basketball courts/fences/gates.

Open the permit page

$3,200,000
Jun 14, 2022Never finaled
filed Jun 2022, never issued
819 Ellis StJs Sullivan Construction Incto erect 16 stories, 1 basement, type i-b, 120 residential with retail mixed use building. (r-2, m, s-2) *** maher: n/a **
Details
Permit
202206146260
Status
filed
Filed
Jun 14, 2022
Declared cost
$16,000,000
Address
819 Ellis St

to erect 16 stories, 1 basement, type i-b, 120 residential with retail mixed use building. (r-2, m, s-2) *** maher: n/a **

Open the permit page

$16,000,000
Jun 10, 2022Never finaled
issued Jun 2023, no final
3250 19th AvThompson Builders Corp, Plant Construction Co, Lpbarrier removal project of (e) mercy high school building include: new accessible elevator. renovations for new accessible gender neutral student and staff restrooms. misc improvements to make path of travel to areas of work accessible (contrasting striping, handrails, guardril. sitework to
Details
Permit
202206106049
Status
issued
Filed
Jun 10, 2022
Permit issued
Jun 14, 2023
Declared cost
$600,000
Address
3250 19th Av

barrier removal project of (e) mercy high school building include: new accessible elevator. renovations for new accessible gender neutral student and staff restrooms. misc improvements to make path of travel to areas of work accessible (contrasting striping, handrails, guardril. sitework to

Open the permit page

$600,000
May 5, 2022Completed
final sign-off Sep 2022
300 Gaven StTruebeck Constructionnew finishes, casework, and lighting on an existing music room at the sf school.
Details
Permit
202205053598
Status
complete
Filed
May 5, 2022
Permit issued
Jun 13, 2022
Final sign-off
Sep 1, 2022
Declared cost
$50,000
Address
300 Gaven St

new finishes, casework, and lighting on an existing music room at the sf school.

Open the permit page

$50,000
May 5, 2022Completed
final sign-off Sep 2022
300 Gaven StTruebeck Constructionmechanical upgrades for the existing classroom building (edeli building) at the sf school.
Details
Permit
202205053597
Status
complete
Filed
May 5, 2022
Permit issued
Jun 13, 2022
Final sign-off
Sep 1, 2022
Declared cost
$50,000
Address
300 Gaven St

mechanical upgrades for the existing classroom building (edeli building) at the sf school.

Open the permit page

$50,000
Mar 30, 2022Completed
final sign-off Nov 2022
260 10th StTruebeck Constructionrenovation of an (e) multipurpose space with new athletic and a/v equipment and enlarging (e) 3ft wide door to 4ft wide door.
Details
Permit
202203301243
Status
complete
Filed
Mar 30, 2022
Permit issued
Jun 7, 2022
Final sign-off
Nov 30, 2022
Declared cost
$350,000
Address
260 10th St

renovation of an (e) multipurpose space with new athletic and a/v equipment and enlarging (e) 3ft wide door to 4ft wide door.

Open the permit page

$350,000
Mar 10, 2022Expired or cancelled
withdrawn Apr 2022
350 Masonic Avremodel (e) rooms w/ new finishes, paint, lighting and acoustical treatment. sinks added to the science and math room. interior parition added in shared office space room no change to (e) school use or exterior building.
Details
Permit
202203109749
Status
withdrawn
Filed
Mar 10, 2022
Declared cost
$80,000
Address
350 Masonic Av

remodel (e) rooms w/ new finishes, paint, lighting and acoustical treatment. sinks added to the science and math room. interior parition added in shared office space room no change to (e) school use or exterior building.

Open the permit page

$80,000
Dec 16, 2021Expired or cancelled
withdrawn Sep 2022
300 Gaven StTruebeck Constructionrevision to permit 202011128771 to remove (e) wall heater from scope of improvements. no other changes proposed.
Details
Permit
202112164594
Status
withdrawn
Filed
Dec 16, 2021
Address
300 Gaven St

revision to permit 202011128771 to remove (e) wall heater from scope of improvements. no other changes proposed.

Open the permit page

Aug 13, 2021Never finaled
issued Aug 2021, no final
350 Masonic AvPotter Fire Protectionrev to pa 201910164593-s3 to relocate fdc closer to (e) hydrant.
Details
Permit
202108136430
Status
issued
Filed
Aug 13, 2021
Permit issued
Aug 27, 2021
Address
350 Masonic Av

rev to pa 201910164593-s3 to relocate fdc closer to (e) hydrant.

Open the permit page

Jun 17, 2021Never finaled
issued Jun 2021, no final
350 Masonic AvHerrero Builders Incorporatedrev to pa# 2019-1016-4593 to add smoke detector at the top of the elevator hoistway, (e) building fdc relocated and mnid-block hydrant omitted from project, no other changes proposed
Details
Permit
202106172718
Status
issued
Filed
Jun 17, 2021
Permit issued
Jun 29, 2021
Declared cost
$7,000
Address
350 Masonic Av

rev to pa# 2019-1016-4593 to add smoke detector at the top of the elevator hoistway, (e) building fdc relocated and mnid-block hydrant omitted from project, no other changes proposed

Open the permit page

$7,000
Apr 27, 2021Completed
final sign-off Jul 2023
350 Masonic AvHerrero Builders Incorporateddeferred electrical submittal to pa# 202010277496.
Details
Permit
202104279431
Status
complete
Filed
Apr 27, 2021
Permit issued
May 4, 2021
Final sign-off
Jul 13, 2023
Declared cost
$1,000
Address
350 Masonic Av

deferred electrical submittal to pa# 202010277496.

Open the permit page

$1,000
Nov 12, 2020Completed
final sign-off Oct 2022
300 Gaven StTruebeck Constructionminor alteration. replacement of (e) glazing with accordian door at middle school building. (n) door & sidelights at middle school admin office entrance. ** maher: n/a **
Details
Permit
202011128771
Status
complete
Filed
Nov 12, 2020
Permit issued
Jul 2, 2021
Final sign-off
Oct 5, 2022
Declared cost
$100,000
Address
300 Gaven St

minor alteration. replacement of (e) glazing with accordian door at middle school building. (n) door & sidelights at middle school admin office entrance. ** maher: n/a **

Open the permit page

$100,000
Nov 12, 2020Completed
final sign-off Oct 2022
300 Gaven StTruebeck Constructionminor alteration. modernization and structural upgrades to preschool building. new preschool and kindergarden bathrooms. new door in (e) window opening. ** maher: n/a **
Details
Permit
202011128790
Status
complete
Filed
Nov 12, 2020
Permit issued
Jul 1, 2021
Final sign-off
Oct 5, 2022
Declared cost
$235,000
Address
300 Gaven St

minor alteration. modernization and structural upgrades to preschool building. new preschool and kindergarden bathrooms. new door in (e) window opening. ** maher: n/a **

Open the permit page

$235,000
Oct 29, 2020Completed
final sign-off Jul 2023
350 Masonic AvHerrero Builders Incorporateddeferred brb frame for pa201910164593.
Details
Permit
202010297692
Status
complete
Filed
Oct 29, 2020
Permit issued
Nov 5, 2020
Final sign-off
Jul 13, 2023
Declared cost
$30,000
Address
350 Masonic Av

deferred brb frame for pa201910164593.

Open the permit page

$30,000
Oct 27, 2020Completed
final sign-off Jul 2023
350 Masonic AvHerrero Builders Incorporatedvoluntary structural strengthening and barrier removal at the entrance on golden gate ave. no changes to the existing school use or exterior building envelope.
Details
Permit
202010277496
Status
complete
Filed
Oct 27, 2020
Permit issued
Mar 18, 2021
Final sign-off
Jul 13, 2023
Declared cost
$500,000
Address
350 Masonic Av

voluntary structural strengthening and barrier removal at the entrance on golden gate ave. no changes to the existing school use or exterior building envelope.

Open the permit page

$500,000
Sep 10, 2020Completed
final sign-off Oct 2021
2120 Golden Gate AvHerrero Builders Incorporateddeferred mep for pa# 201911258136
Details
Permit
202009103905
Status
complete
Filed
Sep 10, 2020
Permit issued
Nov 10, 2020
Final sign-off
Oct 20, 2021
Declared cost
$10,000
Address
2120 Golden Gate Av

deferred mep for pa# 201911258136

Open the permit page

$10,000
Jul 16, 2020Completed
final sign-off Nov 2020
300 Gaven StFtan General Constructioninstallation of 2 temporary modular classrooms. installation matches previosly approved installation under app#201203266887
Details
Permit
202007160294
Status
complete
Filed
Jul 16, 2020
Permit issued
Jul 27, 2020
Final sign-off
Nov 20, 2020
Declared cost
$20,000
Address
300 Gaven St

installation of 2 temporary modular classrooms. installation matches previosly approved installation under app#201203266887

Open the permit page

$20,000
Jun 15, 2020Completed
final sign-off Jun 2023
350 Masonic AvHerrero Builders Incorporatedplumbing permit for storm water control plan review associated only with site permit #201910164593.
Details
Permit
202006158783
Status
complete
Filed
Jun 15, 2020
Permit issued
Oct 21, 2020
Final sign-off
Jun 22, 2023
Address
350 Masonic Av

plumbing permit for storm water control plan review associated only with site permit #201910164593.

Open the permit page

Jun 13, 2020Completed
final sign-off Aug 2020
350 Masonic Avto memorialize egress plans in the existing school building during construction of the addition, which is approved under 201910164593.
Details
Permit
202006138692
Status
complete
Filed
Jun 13, 2020
Permit issued
Jul 22, 2020
Final sign-off
Aug 18, 2020
Address
350 Masonic Av

to memorialize egress plans in the existing school building during construction of the addition, which is approved under 201910164593.

Open the permit page

Feb 5, 2020Completed
final sign-off Sep 2020
2130 Golden Gate AvHerrero Builders Incorporatedto demolish a 2-story, type 5, single family house.
Details
Permit
202002053565
Status
complete
Filed
Feb 5, 2020
Permit issued
Jun 22, 2020
Final sign-off
Sep 9, 2020
Declared cost
$10,000
Address
2130 Golden Gate Av

to demolish a 2-story, type 5, single family house.

Open the permit page

$10,000
Nov 25, 2019Completed
final sign-off Oct 2021
2120 Golden Gate AvHerrero Builders Incorporatedconvert (e)2 residential units to 4 units. no change to building height, mep and fire sprinklers deferred. associated with building permit #201910164593 and cua #2018002179
Details
Permit
201911258136
Status
complete
Filed
Nov 25, 2019
Permit issued
Aug 15, 2020
Final sign-off
Oct 20, 2021
Declared cost
$325,000
Address
2120 Golden Gate Av

convert (e)2 residential units to 4 units. no change to building height, mep and fire sprinklers deferred. associated with building permit #201910164593 and cua #2018002179

Open the permit page

$325,000
Sep 12, 2018Never finaled
issued Sep 2018, no final
260 10th StPlant Construction Co, Lprevision to pa 2017-1016-1381 to remove fire pump (room 109) from scope. room 109 will be used for storage. maher n/a
Details
Permit
201809129908
Status
issued
Filed
Sep 12, 2018
Permit issued
Sep 17, 2018
Address
260 10th St

revision to pa 2017-1016-1381 to remove fire pump (room 109) from scope. room 109 will be used for storage. maher n/a

Open the permit page