Steven P. Duquette
- Listed as
- engineer
- Firm
- Duquette Engineering
- Based in
- San Jose
- On San Francisco permits
- May 2009 to Aug 2025
54 permits since 2000 (engineer on 54 permits): 40 completed, 3 in progress, 3 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 4, 2025 | In progress issued Mar 2026 | 1454 Cortland Av | Appetite For Construction Inc | vertical addition for a new master suite with a bathroom, a bedroom, and walk-in closet. an attic access door will be provided.adu issued sep pa202301109994. toter storage, reconfi entry stair, hand/guardrail, deck over garage, new retaining wall, light andDetails
vertical addition for a new master suite with a bathroom, a bedroom, and walk-in closet. an attic access door will be provided.adu issued sep pa202301109994. toter storage, reconfi entry stair, hand/guardrail, deck over garage, new retaining wall, light and | $282,816 |
| Jul 18, 2024 | In progress issued Jul 2024 | 490 Avila St | Dowbuilt Inc. | shoring of (e) wood frame structure to remain during propsed foundation replacement. deferred submitted for pa# 202209212892.Details
shoring of (e) wood frame structure to remain during propsed foundation replacement. deferred submitted for pa# 202209212892. | $75,000 |
| Apr 22, 2024 | In progress issued Feb 2025 | 3355 Pacific Av | Fma Builders, Partners Contracting Inc. | revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system thDetails
revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system th | $850,000 |
| Feb 24, 2022 | Expired or cancelled expired May 2026 | 2845 Fillmore St | shoring of existing wood fram structure to remain during the proposed foundation replacement.Details
shoring of existing wood fram structure to remain during the proposed foundation replacement. | $40,000 | |
| Aug 12, 2021 | Never finaled filed Aug 2021, never issued | 0 Northgate Dr | bldg 262 on ybi: remove and replace existing corrugate roof. retrofit existing wood windows and replace existing window glazing with new insulated glazing. remove and replace existing sliding barn doors with new aluminum storefront frame and glazing.Details
bldg 262 on ybi: remove and replace existing corrugate roof. retrofit existing wood windows and replace existing window glazing with new insulated glazing. remove and replace existing sliding barn doors with new aluminum storefront frame and glazing. | $300,000 | |
| Feb 8, 2021 | Never finaled issued Mar 2021, no final | 440 Geary St | testing agency conducting concrete wall testing and brick shear testing at select locations of exterior wall of buildingDetails
testing agency conducting concrete wall testing and brick shear testing at select locations of exterior wall of building | $13,340 | |
| Feb 4, 2020 | Never finaled issued Feb 2020, no final | 2760 Divisadero St | Fma Builders | shoring of the existing 3 story wood structure to remain during the proposed foundation replacement pa #2019-1018-4960. pedestrian protection and encroachment under seperate permit with bsmDetails
shoring of the existing 3 story wood structure to remain during the proposed foundation replacement pa #2019-1018-4960. pedestrian protection and encroachment under seperate permit with bsm | $200,000 |
| Dec 27, 2019 | Expired or cancelled cancelled Nov 2022 | 2633 23rd St | wood frame seismic retrofit (soft story) accessibility upgrade for commercial. residential soft story pa #2018-0226-2218.Details
wood frame seismic retrofit (soft story) accessibility upgrade for commercial. residential soft story pa #2018-0226-2218. | $45,000 | |
| Aug 22, 2019 | Completed final sign-off Nov 2020 | 944 Chestnut St | Noa Construction Llc, Bill Brown Construction | temp shoring support of residential structure for retrofit of the foundation.once the fouadation & frraming are sufficiently complete for removel, the shoring will be removed. ref pa201807124449. maher n/a.Details
temp shoring support of residential structure for retrofit of the foundation.once the fouadation & frraming are sufficiently complete for removel, the shoring will be removed. ref pa201807124449. maher n/a. | $90,000 |
| Mar 19, 2019 | Completed final sign-off Mar 2022 | 737 Buena Vista West Av | Redhorse Constructors Inc. | revision to 201512285984; addendum # 3 and 5Details
revision to 201512285984; addendum # 3 and 5 | |
| Sep 25, 2018 | Completed final sign-off Aug 2019 | 1140 Harrison St | Hanover R S Construction Llc. | to demolish a 2 story, type iii, industrial bldg. ** maher: exempted; see attached approval letter from dph **Details
to demolish a 2 story, type iii, industrial bldg. ** maher: exempted; see attached approval letter from dph ** | $1,000,000 |
| Sep 25, 2018 | Completed final sign-off May 2021 | 1140 Harrison St | Hanover R S Construction Llc. | shoring & tiebacks for new construction (ref pa# 2018-0427-7640 s) ** maher: exempted; see attached approval letter from dph **Details
shoring & tiebacks for new construction (ref pa# 2018-0427-7640 s) ** maher: exempted; see attached approval letter from dph ** | $2,500,000 |
| Sep 25, 2018 | Completed final sign-off Apr 2021 | 1140 Harrison St | Hanover R S Construction Llc. | structural bracing & shoring of portions of (e) bldg. ref pa# 2018-0427-7640 s (new bldg), pa# 2018-0904-9056(demo), pa# 2018-0904-9063(shoring), pa# 2018-0904-9061 (grading/exc) ** maher: exempted; see attached approval letter from dph **Details
structural bracing & shoring of portions of (e) bldg. ref pa# 2018-0427-7640 s (new bldg), pa# 2018-0904-9056(demo), pa# 2018-0904-9063(shoring), pa# 2018-0904-9061 (grading/exc) ** maher: exempted; see attached approval letter from dph ** | $1,100,000 |
| Sep 25, 2018 | Completed final sign-off May 2021 | 1140 Harrison St | Hanover R S Construction Llc. | install vertical beams for temp wall bracing & excavation shoring which includes soil mix wall, soldier beams & tiebacks. (ref pa# 2018-0427-7640s) ** maher: exempted; see attached approval letter from dph **Details
install vertical beams for temp wall bracing & excavation shoring which includes soil mix wall, soldier beams & tiebacks. (ref pa# 2018-0427-7640s) ** maher: exempted; see attached approval letter from dph ** | $3,000,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 21 Brush Pl | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 61 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 7 Heron St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 65 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 10 Heron St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 172 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 15 Brush Pl | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 1124 Harrison St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 158 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Expired or cancelled expired Feb 2025 | 176 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 67 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 168 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 152 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 162 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 23 Brush Pl | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 182 Langton St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 50 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 69 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 63 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 1170 Harrison St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 71 Hallam St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 11 Brush Pl | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 1126 Harrison St | Hanover R S Construction Llc. | tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher:Details
tiebacks for new construction @ 1140 harrison street. (ref pa# 2018/04/27/7640-s) ** maher: | $8,000 |
| Feb 26, 2018 | Expired or cancelled cancelled Nov 2022 | 2631 23rd St | ieito comply with complaint 201722291. soft story retrofit, adding moment frames and some new foundation in residential area. soft story retrofit per sfebc chapter 4d engineering criteria rp-807.Details
ieito comply with complaint 201722291. soft story retrofit, adding moment frames and some new foundation in residential area. soft story retrofit per sfebc chapter 4d engineering criteria rp-807. | $70,000 | |
| Aug 29, 2017 | Completed final sign-off May 2018 | 1201 Tennessee St | Devcon Construction | revision to structural and mounting details of previously approved sunshades and awnings under pa #201312234917 and #201701318334. maher naDetails
revision to structural and mounting details of previously approved sunshades and awnings under pa #201312234917 and #201701318334. maher na | |
| Jun 2, 2017 | Completed final sign-off Mar 2021 | 1532 Harrison St | Cannon Constructors North Inc | demolition of on site parking lot, installation of steel soldier beams of shoring to allow for excavation of future basement. excavation of basement to a depth of approx 22 ft. below current grade. finish grading of basement excalvation for future concrete installation. maher exempt.Details
demolition of on site parking lot, installation of steel soldier beams of shoring to allow for excavation of future basement. excavation of basement to a depth of approx 22 ft. below current grade. finish grading of basement excalvation for future concrete installation. maher exempt. | $600,000 |
| Jun 2, 2017 | Completed final sign-off Apr 2021 | 1532 Harrison St | Cannon Constructors North Inc | shoring & tieback for new construction at 1532 harrison st p/a#201607253262-s. maher exempt.Details
shoring & tieback for new construction at 1532 harrison st p/a#201607253262-s. maher exempt. | $600,000 |
| Feb 22, 2017 | Completed final sign-off Jun 2024 | 700 El Camino Del Mar | Fma Builders | underpining related to work at 632 el camino - approved under pa 2015-1125-3600 & 2017-0118-7425. cost of work carried under previous permits. scope previously approved this is to memorialize work under adjacent addressDetails
underpining related to work at 632 el camino - approved under pa 2015-1125-3600 & 2017-0118-7425. cost of work carried under previous permits. scope previously approved this is to memorialize work under adjacent address | |
| Jan 31, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | Devcon Construction | revision pa #201312234917 to show shop drawings structural details & calculations per awnigns & sun shades. n/a maher ordinanceDetails
revision pa #201312234917 to show shop drawings structural details & calculations per awnigns & sun shades. n/a maher ordinance | |
| Jan 18, 2017 | Expired or cancelled expired Jun 2024 | 632 El Camino Del Mar | Fma Builders | shoring revision for 201511021435. no other workDetails
shoring revision for 201511021435. no other work | |
| Jul 18, 2016 | Expired or cancelled withdrawn Feb 2017 | 229 Ellis St | foundation work for future addition, future addition under seperate permit. (vacant building, all ada upgrades to be under future buildout)Details
foundation work for future addition, future addition under seperate permit. (vacant building, all ada upgrades to be under future buildout) | $100,000 | |
| Feb 1, 2016 | Completed final sign-off Nov 2019 | 815 Tennessee St | Cannon Constructors North Inc | shoring & excavation for (n) construction. ref pa #201405054911-2.Details
shoring & excavation for (n) construction. ref pa #201405054911-2. | $750,000 |
| Sep 15, 2015 | Expired or cancelled withdrawn Jul 2020 | 632 El Camino Del Mar | pipe bracing lines 3 & 4 to extend excavation 4' forwards line 3, additional 5 pit piers along line 1 to support edge of mat foundation, re-support the temp. shoring beams on line 1. n/a ordinance #155-13Details
pipe bracing lines 3 & 4 to extend excavation 4' forwards line 3, additional 5 pit piers along line 1 to support edge of mat foundation, re-support the temp. shoring beams on line 1. n/a ordinance #155-13 | $5,000 | |
| Jul 1, 2015 | Completed final sign-off Sep 2022 | 2201 Bay Shore Bl | M Moser Associates Llc | rehabof historic bldg for use as office space. rehab/replacement of windows, seismic upgrade, new roof deck o/(e) skylight area, interior ti for office space includ sales office & model unit, accessibility upgrade new elevator & lift from sidewalk. rated assembles for potential future a3 & i4 uses.Details
rehabof historic bldg for use as office space. rehab/replacement of windows, seismic upgrade, new roof deck o/(e) skylight area, interior ti for office space includ sales office & model unit, accessibility upgrade new elevator & lift from sidewalk. rated assembles for potential future a3 & i4 uses. | $1,800,000 |
| Apr 23, 2015 | Completed final sign-off Aug 2015 | 201 Bosworth St | soft story seismic retrofit per sfbc chapter 34b - 2012 iebc appendix a-4.Details
soft story seismic retrofit per sfbc chapter 34b - 2012 iebc appendix a-4. | $20,000 | |
| Apr 18, 2014 | Completed final sign-off Aug 2015 | 147 Day St | Hubert Penny | seismic retrofit of target story, ground level, per ordinance#66-13 wood frame siesmic retrofit program.Details
seismic retrofit of target story, ground level, per ordinance#66-13 wood frame siesmic retrofit program. | $80,000 |
| Nov 13, 2012 | Completed final sign-off Sep 2013 | 250 Beach St | Rossi Builders Inc. | revision to appl #201207104452 - revised structural calculations, framing & fabric, deferred submittal of awningsDetails
revision to appl #201207104452 - revised structural calculations, framing & fabric, deferred submittal of awnings | |
| Jun 30, 2010 | Completed final sign-off Sep 2011 | 2550 Webster St | Plath & Company Inc | voluntary bolts plus seismic retrofit @ foundation, floors & roof. chimney & some parapets were reinforced per permit #907282.Details
voluntary bolts plus seismic retrofit @ foundation, floors & roof. chimney & some parapets were reinforced per permit #907282. | $125,000 |
| May 20, 2009 | Expired or cancelled expired Jan 2012 | 1512 York St | Richard F Trevino Jr | foundation retrofit, all crawl spaceDetails
foundation retrofit, all crawl space | $6,400 |
| May 18, 2009 | Completed final sign-off Jul 2010 | 307 30th St | revision to pa #200406116185s1r2, structural only sheet at s1.0, s1.1.0 & s3.0Details
revision to pa #200406116185s1r2, structural only sheet at s1.0, s1.1.0 & s3.0 |