Sandy Blair
- Listed as
- architect
- Firm
- Marx/Okubo
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Dec 2025
8 permits since 2000 (architect on 8 permits): 6 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 18, 2025 | In progress filed Dec 2025, not yet issued | 1200 04th St | mb360 block 5: replace part of cast-in-place concrete sidewalks w/ pavers and introduce additional landscape strips between the sidewalks to improve efficiency of the maintenance of the areas. locally adjust structural slabs at building entrances. accessibility work will be brought to compliance.Details
mb360 block 5: replace part of cast-in-place concrete sidewalks w/ pavers and introduce additional landscape strips between the sidewalks to improve efficiency of the maintenance of the areas. locally adjust structural slabs at building entrances. accessibility work will be brought to compliance. | $1,300,000 | |
| Oct 26, 2023 | Completed final sign-off Apr 2025 | 1515 Fillmore St | Sft Construction Corp | to comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg).Details
to comply w/ accessible business entrance program- abe# 202310118882, ada entry/ bathroom upgrades for commercial restaurant, required by structural work at 1730 ofarrell st .(same bldg). | $35,000 |
| Oct 26, 2023 | Completed final sign-off Apr 2025 | 1740 Ofarrell St | Sft Construction Corp | to comply w/ accessible business entrance program - abe# 20231011881, ada upgrades for commercial restaurant, required by structual work at 1730 ofarrell st (same bldg).Details
to comply w/ accessible business entrance program - abe# 20231011881, ada upgrades for commercial restaurant, required by structual work at 1730 ofarrell st (same bldg). | $35,000 |
| Oct 26, 2023 | Completed final sign-off Apr 2025 | 1730 Ofarrell St | Sft Construction Corp | voluntary partial structural strengthening - reinforced concrete column jackets/wall overlays at street shearwalls. removal & replacement of architectural finishes to allow for structural work to be completed, ada upgrades of residential lobby.Details
voluntary partial structural strengthening - reinforced concrete column jackets/wall overlays at street shearwalls. removal & replacement of architectural finishes to allow for structural work to be completed, ada upgrades of residential lobby. | $500,000 |
| Jun 22, 2023 | Expired or cancelled withdrawn Oct 2023 | 1730 Ofarrell St | voluntary partial seismic retrofit.reinforced concrete column jackets/wall overlays @ select shear walls.removal & replacement of archtictural finishes to allow for structrual work to be completed.accessibility work @ two bldg entrances to bring slopes @ landings into compliance.Details
voluntary partial seismic retrofit.reinforced concrete column jackets/wall overlays @ select shear walls.removal & replacement of archtictural finishes to allow for structrual work to be completed.accessibility work @ two bldg entrances to bring slopes @ landings into compliance. | $500,000 | |
| Oct 11, 2016 | Completed final sign-off Aug 2018 | 444 Spear St | Saarman Construction,Ltd. | suite 205 - adding four private offices to an (e) commercial office space. improvements include new non-bearing, non-rated partitions, interior doors & sidelites, minor hvac modifications, new or relocated electrical & data receptacles and minor lighting adjustments. n/a maher ordinanceDetails
suite 205 - adding four private offices to an (e) commercial office space. improvements include new non-bearing, non-rated partitions, interior doors & sidelites, minor hvac modifications, new or relocated electrical & data receptacles and minor lighting adjustments. n/a maher ordinance | $144,647 |
| May 13, 2014 | Completed final sign-off Oct 2015 | 1 Grant Av | Rainbow Waterproofing & Restor | remove broken roof access window; replace with metal door. remove north skylight glazing; replace with metal roof. r tom 5-13-14Details
remove broken roof access window; replace with metal door. remove north skylight glazing; replace with metal roof. r tom 5-13-14 | $25,000 |
| May 2, 2014 | Completed final sign-off Apr 2015 | 1 Grant Av | Rainbow Waterproofing & Restor | re-coat roof, repair skylights, repair elevator penthouse roof, repoint roof-level granite, repoint entry granite, seal concrete sidewalk cracks.Details
re-coat roof, repair skylights, repair elevator penthouse roof, repoint roof-level granite, repoint entry granite, seal concrete sidewalk cracks. | $300,000 |