Ron Rusell
- Listed as
- architect
- Firm
- Arquitectonica
- Based in
- Los Angeles
- On San Francisco permits
- Jun 2008 to Jul 2018
24 permits since 2000 (architect on 24 permits): 11 completed, 12 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2018 | Completed final sign-off Dec 2018 | 201 Folsom St | rev to pa# 201207124717 to erect a 42 story building with a unit dwelling count corrected as previously approved permit 201512175381, revise interior layour on floors 41& 42 from 7 dwelling units to 3 dwelling unitsDetails
rev to pa# 201207124717 to erect a 42 story building with a unit dwelling count corrected as previously approved permit 201512175381, revise interior layour on floors 41& 42 from 7 dwelling units to 3 dwelling units | ||
| Apr 3, 2018 | Completed final sign-off Nov 2018 | 110 Channel | Peacock Construction | grnd flr - construct new non structural demising walls to subdivide retail space- sprinklers separate permitDetails
grnd flr - construct new non structural demising walls to subdivide retail space- sprinklers separate permit | $29,000 |
| Nov 14, 2017 | Completed final sign-off Dec 2018 | 301 Beale St | tenant improvement unit 42c move non bearing partition add closet, kitchen, baths, add non bearing walls to bedroom maher not reqDetails
tenant improvement unit 42c move non bearing partition add closet, kitchen, baths, add non bearing walls to bedroom maher not req | $50,000 | |
| Aug 17, 2015 | Never finaled issued Oct 2016, no final | 1190 Mission St | Swinerton Builders | hydranlic elevator & machine rm at level b1, new corridor w/ 3hr door to 33-8th st garage level b2, at level 1, a new corridor for materials & waste to be moved to & fr 1190 mission thru 1188 mission & a new outdoor landcaped plaza at mission st at level 2, new exterior dr & canopy at lobby w/ storeDetails
hydranlic elevator & machine rm at level b1, new corridor w/ 3hr door to 33-8th st garage level b2, at level 1, a new corridor for materials & waste to be moved to & fr 1190 mission thru 1188 mission & a new outdoor landcaped plaza at mission st at level 2, new exterior dr & canopy at lobby w/ store | $1,200,000 |
| Aug 17, 2015 | Never finaled issued Oct 2016, no final | 1188 Mission St | Swinerton Builders | new egress corridor at level 1 w/ 3 hr doors to communicate w/ adjacent 33-8th st garage level b1 & new temporary storage room at level 2 above the existing bicycle storage room, w/ new 3-hr door to 33-8th st plaza. n/a for maher ordinance no.155-13.Details
new egress corridor at level 1 w/ 3 hr doors to communicate w/ adjacent 33-8th st garage level b1 & new temporary storage room at level 2 above the existing bicycle storage room, w/ new 3-hr door to 33-8th st plaza. n/a for maher ordinance no.155-13. | $1,100,000 |
| May 14, 2014 | Completed final sign-off Feb 2017 | 33 08th St | Swinerton Builders | revision to approved and issued addendum one ap #201209069080. 1) tie down pressure revisions-revised structural sheets for b6 (sectors a-d) and new tie-down sheets s2.6o (sectors a-d) with pertinent calculations. 2) global sliding resistance- pertinent calculations only, no drawing changes.Details
revision to approved and issued addendum one ap #201209069080. 1) tie down pressure revisions-revised structural sheets for b6 (sectors a-d) and new tie-down sheets s2.6o (sectors a-d) with pertinent calculations. 2) global sliding resistance- pertinent calculations only, no drawing changes. | |
| Mar 12, 2014 | Completed final sign-off Jul 2014 | 1998 Market St | Cahill Contractors Inc | revision to appl #2010.1221.7106: revise east corner units on floors 4 through 8. relocate bathroom, kitchen & bedrooms. mep. & lighting to be under seperate permit.Details
revision to appl #2010.1221.7106: revise east corner units on floors 4 through 8. relocate bathroom, kitchen & bedrooms. mep. & lighting to be under seperate permit. | |
| Dec 3, 2013 | Completed final sign-off Feb 2018 | 1527 Pine St | Swinerton Builders | to erect 12 stories, 2 basement, 103 residential with retail and parking.Details
to erect 12 stories, 2 basement, 103 residential with retail and parking. | $39,000,000 |
| Sep 27, 2013 | Never finaled issued Oct 2013, no final | 1190 Mission St | Swinerton Builders | add pg & e gas meter cabinet located northwest facade. pg & e will run supply line to room & place required meter. trinity will then run supply gas pipe from the meter cabinet to the retail area. this p.a will cover the work required to build the cabinet to meet pg & e specs & extend gas lineDetails
add pg & e gas meter cabinet located northwest facade. pg & e will run supply line to room & place required meter. trinity will then run supply gas pipe from the meter cabinet to the retail area. this p.a will cover the work required to build the cabinet to meet pg & e specs & extend gas line | $35,000 |
| May 9, 2013 | Never finaled issued Jul 2013, no final | 1188 Mission St | Swinerton Builders | bicycle pkg area reconfigured to allow for storage of more bikes and to allow access into 1188 mission thru the west exterior wall a new 3-hr rated roll up door and 3-hr ratedswing door are to be added to the existing 4-hr rated west exterior wall . the ext wall was previously permitted to allowDetails
bicycle pkg area reconfigured to allow for storage of more bikes and to allow access into 1188 mission thru the west exterior wall a new 3-hr rated roll up door and 3-hr ratedswing door are to be added to the existing 4-hr rated west exterior wall . the ext wall was previously permitted to allow | $20,000 |
| Apr 2, 2013 | Never finaled issued Jul 2013, no final | 1190 Mission St | Swinerton Builders | architectural revisions to the corridor mechanical supply duct shaft at all floor levels, in order to provide the required 2-hr fire separation by wy of 3m rated duct wrap assembly & spray-applied fire proofing materials in lieu of a framed shaft assembly as shown in addendum 3 work has been approveDetails
architectural revisions to the corridor mechanical supply duct shaft at all floor levels, in order to provide the required 2-hr fire separation by wy of 3m rated duct wrap assembly & spray-applied fire proofing materials in lieu of a framed shaft assembly as shown in addendum 3 work has been approve | $160,000 |
| Jan 29, 2013 | Expired or cancelled expired Jul 2022 | 1169 Market St | Swinerton Builders | one 10x32 construction trailer, "mobile modular trailer" for 1169 market st construction site with ada ramp, temporary only. ref approved pa# 201209069084. see detail drawings by tmp svcs, sheets 1-8 under 2013.01.29.8995.Details
one 10x32 construction trailer, "mobile modular trailer" for 1169 market st construction site with ada ramp, temporary only. ref approved pa# 201209069084. see detail drawings by tmp svcs, sheets 1-8 under 2013.01.29.8995. | $2,000 |
| Nov 14, 2012 | Never finaled issued Feb 2013, no final | 1190 Mission St | Swinerton Builders | epoxy injection in shear wall cracks at west core, south wall.Details
epoxy injection in shear wall cracks at west core, south wall. | $5,000 |
| Jul 12, 2012 | Never finaled issued May 2013, no final | 318 Main St | plaza a - erect 8 stories, 59 dwelling units, 4 basement with parking and retail building.Details
plaza a - erect 8 stories, 59 dwelling units, 4 basement with parking and retail building. | $15,000,000 | |
| Jul 12, 2012 | Never finaled issued May 2013, no final | 333 Beale St | plaza c - erect 8 stories, 80 dwelling units, 4 basement with parking and retail building.Details
plaza c - erect 8 stories, 80 dwelling units, 4 basement with parking and retail building. | $15,000,000 | |
| Jul 12, 2012 | Completed final sign-off Jun 2018 | 201 Folsom St | podium structure - erect 2 stories, parking with 3 level basements, building.Details
podium structure - erect 2 stories, parking with 3 level basements, building. | $46,000,000 | |
| Jul 12, 2012 | Never finaled issued May 2013, no final | 338 Main St | tower d - erect 37 stories, 245 dwelling units, 4 basement with parking and retail building.Details
tower d - erect 37 stories, 245 dwelling units, 4 basement with parking and retail building. | $70,000,000 | |
| Jul 12, 2012 | Never finaled issued May 2013, no final | 301 Beale St | tower b - erect 42 stories, 285 dwelling units, 4 basement with parking and retail building.Details
tower b - erect 42 stories, 285 dwelling units, 4 basement with parking and retail building. | $80,000,000 | |
| Dec 21, 2010 | Completed final sign-off Jul 2014 | 1998 Market St | to erect 9 stories, 114 residential units with retail & parking building.Details
to erect 9 stories, 114 residential units with retail & parking building. | $17,500,000 | |
| Dec 16, 2010 | Completed final sign-off Oct 2013 | 1190 Mission St | Swinerton Builders | erect 22 stories of 418 dwelling unit with commercialDetails
erect 22 stories of 418 dwelling unit with commercial | $60,000,000 |
| Apr 8, 2009 | Never finaled issued Apr 2009, no final | 1188 Mission St | Cannon Constructors North Inc | revision to 200704098308/s4. modification to kitchen cabinets, breadboard.Details
revision to 200704098308/s4. modification to kitchen cabinets, breadboard. | $5,000 |
| Oct 31, 2008 | Completed final sign-off May 2016 | 1415 Mission St | Build Group Inc. | to erect 13 stories, 2 basements, 121 residential unit with commercial and parking building.Details
to erect 13 stories, 2 basements, 121 residential unit with commercial and parking building. | $4,130,000 |
| Oct 7, 2008 | Completed final sign-off Aug 2009 | 353 King St | Allied Fire Protection | submitting cpvc bracing literature for fire sprinkler main and revised plan per app #200105300277Details
submitting cpvc bracing literature for fire sprinkler main and revised plan per app #200105300277 | |
| Jun 24, 2008 | Never finaled issued Jun 2008, no final | 318 Spear St | rev. to pa # 2004/09/28/5395 s4, demolition of (e) drywall ceiling areas in the health club and installation of new drywall and acoustic tile ceiling as described in the enclosed plans. electrical, mechanical and fire sprinkler work under separate permit.Details
rev. to pa # 2004/09/28/5395 s4, demolition of (e) drywall ceiling areas in the health club and installation of new drywall and acoustic tile ceiling as described in the enclosed plans. electrical, mechanical and fire sprinkler work under separate permit. | $50,000 |