Block 8705, lot 006
353 King St
- City’s use
- Multi-Family Residential
- Built
- 2009
- Stories
- 18
- Units
- 260
- Building
- 418,981 sq ft
- Lot
- 64,904 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2025 | Completed final sign-off Dec 2025 | 353 King St | Rapid Fire Safety&Security Llc Dba Pafa | db testing matrixDetails
db testing matrix | |
| Sep 11, 2024 | Completed final sign-off Nov 2024 | 353 King St | Marquee Fire Protection Dba Pye Barker F | work will include the relocation for 4 sidewall sprinkler heads and the additono of 2 new pendant sprinkler heads and addition of 2 new pendant sprinkler heads in the 3rd fl lsounge which is to be turned into a dwelling unit ref 202311291555Details
work will include the relocation for 4 sidewall sprinkler heads and the additono of 2 new pendant sprinkler heads and addition of 2 new pendant sprinkler heads in the 3rd fl lsounge which is to be turned into a dwelling unit ref 202311291555 | $9,475 |
| Sep 4, 2024 | Completed final sign-off Jan 2025 | 353 King St | revision to 202311291555(adu unit). revision to the bathroom layout and addition of closet.kitchen and bathroom to be adaptableDetails
revision to 202311291555(adu unit). revision to the bathroom layout and addition of closet.kitchen and bathroom to be adaptable | ||
| Nov 29, 2023 | Completed final sign-off Jan 2025 | 353 King St | Cobalt Facities Inc Sba Cobalt Construct | conversion of (e) social lounge into (n) 1 bedroom adu unit on the 3rd floor accessory dwelling units (adus) with (n) kitchen, bedroom, living room and bathroom @ 353/383 king st.Details
conversion of (e) social lounge into (n) 1 bedroom adu unit on the 3rd floor accessory dwelling units (adus) with (n) kitchen, bedroom, living room and bathroom @ 353/383 king st. | $50,000 |
| Oct 5, 2022 | Expired or cancelled cancelled Jan 2026 | 383 King St | p2 level: remove 2 (e) level 2 ev chargers in garage & replace with 2 new level 2 charges. install 1 new level 2 chargerDetails
p2 level: remove 2 (e) level 2 ev chargers in garage & replace with 2 new level 2 charges. install 1 new level 2 charger | $100,000 | |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 353 King St | Fairview Restoration Inc. | g/f suite 176 -interior partition walls for new entry area, new epoxy floor, new washer and dryer at toilet room, new acoustical gyp bd ceiling, new exhaust fan, for dog day care use. maher not reqDetails
g/f suite 176 -interior partition walls for new entry area, new epoxy floor, new washer and dryer at toilet room, new acoustical gyp bd ceiling, new exhaust fan, for dog day care use. maher not req | $20,000 |
| Jan 6, 2016 | Completed final sign-off Jan 2016 | 383 King St | Rudy's Glass Inc | install/retrofit window in existing opening,no visible in the street; to comply with nov 201571325Details
install/retrofit window in existing opening,no visible in the street; to comply with nov 201571325 | $2,195 |
| Dec 5, 2014 | Expired or cancelled cancelled Jan 2026 | 298 Berry St | Krill Construction | t.i. to extg 1st floor retail space to yoga studio business.Details
t.i. to extg 1st floor retail space to yoga studio business. | $30,000 |
| Nov 21, 2014 | Completed final sign-off Jun 2015 | 383 King St | Jericho Project | revision to 201410279939. letter size 10 be 12", letters elevated 2" higher on canopy, letters to be attached with screws not weldedDetails
revision to 201410279939. letter size 10 be 12", letters elevated 2" higher on canopy, letters to be attached with screws not welded | |
| Oct 27, 2014 | Completed final sign-off Jun 2015 | 383 King St | Jericho Project | 1 non electric canopy signDetails
1 non electric canopy sign | $2,000 |
| Oct 27, 2014 | Completed final sign-off Jun 2015 | 383 King St | Jericho Project | 3 non electric wall signs. maher not reqDetails
3 non electric wall signs. maher not req | $1,000 |
| Jul 13, 2010 | Completed final sign-off Dec 2010 | 353 King St | first ti. shell buildout of retail soace. no struc. work. sorinkler under separate permit. interior work only.Details
first ti. shell buildout of retail soace. no struc. work. sorinkler under separate permit. interior work only. | $25,000 | |
| Aug 11, 2009 | Completed final sign-off Aug 2009 | 353 King St | Webcor Construction Lp | to obtain final inspection for work approved under app #200706214751 all work is completeDetails
to obtain final inspection for work approved under app #200706214751 all work is complete | |
| Jul 1, 2009 | Completed final sign-off Aug 2009 | 353 King St | Webcor Construction Lp | as built for maintenance shop rm 171, revised occupancy count for recreation rm 373, clarification to occupance calculation & path of travel for exiting from podium addition of panic hardware on lobby smoke door #380a @mid-rise elevator door lobby 3rd floor. revision to pa# 2001-0530-0277.Details
as built for maintenance shop rm 171, revised occupancy count for recreation rm 373, clarification to occupance calculation & path of travel for exiting from podium addition of panic hardware on lobby smoke door #380a @mid-rise elevator door lobby 3rd floor. revision to pa# 2001-0530-0277. | $4,000 |
| Dec 3, 2008 | Completed final sign-off Jul 2009 | 353 King St | Martinelli Environmental Graph | to erect non electric, projecting, doubld faced sign.Details
to erect non electric, projecting, doubld faced sign. | $12,000 |
| Dec 3, 2008 | Completed final sign-off Jun 2009 | 353 King St | Martinelli Environmental Graph | to erect non-electrical signDetails
to erect non-electrical sign | |
| Oct 7, 2008 | Completed final sign-off Aug 2009 | 353 King St | Allied Fire Protection | submitting cpvc bracing literature for fire sprinkler main and revised plan per app #200105300277Details
submitting cpvc bracing literature for fire sprinkler main and revised plan per app #200105300277 | |
| Mar 17, 2008 | Completed final sign-off Aug 2009 | 383 King St | Allied Fire Protection | install 6" fire service 20' feet out from building.Details
install 6" fire service 20' feet out from building. | $4,000 |
| Jun 21, 2007 | Expired or cancelled expired Aug 2009 | 353 King St | Webcor Construction Lp | grading.Details
grading. | $150,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.