Raymond Situ
- Listed as
- architect, engineer
- Firm
- Inncon Design
- Based in
- San Francisco
- On San Francisco permits
- Nov 2017 to Mar 2026
69 permits since 2000 (engineer on 68 permits, architect on 1 permit): 48 completed, 3 in progress, 13 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2026 | In progress issued Jul 2026 | 1254 36th Av | erect (n) pre-fab type vb 1 story greenhouse.Details
erect (n) pre-fab type vb 1 story greenhouse. | $50,000 | |
| Jan 2, 2026 | In progress issued Oct 2026 | 1520 45th Av | alter site to pa# 201709056882, reconfigure interior layout for (n) bathrooms, closets, laundry, media room and (e) garage @ 1/f. reconfigure layout of (e) living room, kitchen, bath and bedrooms @ 2/f. propose (n) bath w/skylight @ 2/f. revise doors & windows @ rear facade. update applicable buildiDetails
alter site to pa# 201709056882, reconfigure interior layout for (n) bathrooms, closets, laundry, media room and (e) garage @ 1/f. reconfigure layout of (e) living room, kitchen, bath and bedrooms @ 2/f. propose (n) bath w/skylight @ 2/f. revise doors & windows @ rear facade. update applicable buildi | ||
| Dec 5, 2023 | In progress filed Dec 2023, not yet issued | 1355 35th Av | legalize as-built 2nd dwelling unit on 1/f per ordinance 43-14 in a building currently containing one legal unit at 2/f. legalize as-built full bath, closet, hallway, and kitchen remodel at 2/f per plan. remove as-built rain shelter above lightwellDetails
legalize as-built 2nd dwelling unit on 1/f per ordinance 43-14 in a building currently containing one legal unit at 2/f. legalize as-built full bath, closet, hallway, and kitchen remodel at 2/f per plan. remove as-built rain shelter above lightwell | $100,000 | |
| Jul 11, 2022 | Completed final sign-off Dec 2022 | 49 Barcelona Av | The Great Ocean General Contractor | rev to pa202206156385: remodel (e) bathrooms on each floor. remodel the kitchen on each floor. add and remove walls per plans. add 3 skylihgts on roof. turn 1st floor closet into a full bathroom. install shower pan, toilet and vanity. back to back of current bathroom.Details
rev to pa202206156385: remodel (e) bathrooms on each floor. remodel the kitchen on each floor. add and remove walls per plans. add 3 skylihgts on roof. turn 1st floor closet into a full bathroom. install shower pan, toilet and vanity. back to back of current bathroom. | $50,000 |
| Dec 2, 2021 | Completed final sign-off Jun 2022 | 80 Molimo Dr | The Great Ocean General Contractor | relocate bathroom and add laundry room on 1/f. relocate interior stairscase. remodel (e) kitchen, living room and living room on 2/f. add (n) bathroom on 2/f. replace water heater with tankless.replace window with sliding door on 2/f.Details
relocate bathroom and add laundry room on 1/f. relocate interior stairscase. remodel (e) kitchen, living room and living room on 2/f. add (n) bathroom on 2/f. replace water heater with tankless.replace window with sliding door on 2/f. | $200,000 |
| Nov 23, 2021 | Completed final sign-off Dec 2022 | 2736 Ortega St | reconfigure interior stairs. g/f: remodel (e) bathroom, bedroom & family room (ref 200008289043). 2/f: remodel (e) kichen, dining room, living room, (e) bathroom. convert (e) bedroom into master bedroom on 2/f.Details
reconfigure interior stairs. g/f: remodel (e) bathroom, bedroom & family room (ref 200008289043). 2/f: remodel (e) kichen, dining room, living room, (e) bathroom. convert (e) bedroom into master bedroom on 2/f. | $20,000 | |
| Nov 23, 2021 | Expired or cancelled cancelled Mar 2025 | 522 Vienna St | adu per government code 65852.2.Details
adu per government code 65852.2. | $150,000 | |
| Nov 15, 2021 | Completed final sign-off Aug 2022 | 1482 29th Av | rev to pa202110220983: revert back to original 1/f sunroom per previous approved permit; update structural plan and details. new retaining wallDetails
rev to pa202110220983: revert back to original 1/f sunroom per previous approved permit; update structural plan and details. new retaining wall | $5,000 | |
| Nov 9, 2021 | Completed final sign-off Dec 2021 | 1745 18th Av | to comply with complaint 201989938: to remove unpermitted cookeware on 1/f per plan. legalized habitable space under pa9607956Details
to comply with complaint 201989938: to remove unpermitted cookeware on 1/f per plan. legalized habitable space under pa9607956 | $1,000 | |
| Nov 9, 2021 | Completed final sign-off Jan 2023 | 2754 43rd Av | Guan Construction, Global Standard Construction Inc | infill 1/f rear.add (n) media room,office,family room,bathroom and (n) laundry room per plan.remodel (e) kitchen and dining room, add (n) bathroom to (e) bedroom on 2/f and expand (e) bath on 2/f.Details
infill 1/f rear.add (n) media room,office,family room,bathroom and (n) laundry room per plan.remodel (e) kitchen and dining room, add (n) bathroom to (e) bedroom on 2/f and expand (e) bath on 2/f. | $80,000 |
| Nov 5, 2021 | Completed final sign-off Jul 2022 | 2706 43rd Av | Bay Area Builders | remodel kitchen on 2/f. replace window with sliding door on 2/f. replace water heater with tankless type.Details
remodel kitchen on 2/f. replace window with sliding door on 2/f. replace water heater with tankless type. | $40,000 |
| Nov 5, 2021 | Never finaled issued Nov 2021, no final | 109 Fillmore St | units 109/111/111a fillmore st: remodel all bathrooms. unit 109: remodel kitchen in-kind & remove storage next to hallway.widen the (e) bedroom in front of unit 111a. add 2 skylights in hall area of unit 111a.Details
units 109/111/111a fillmore st: remodel all bathrooms. unit 109: remodel kitchen in-kind & remove storage next to hallway.widen the (e) bedroom in front of unit 111a. add 2 skylights in hall area of unit 111a. | $40,000 | |
| Nov 3, 2021 | Completed final sign-off Aug 2023 | 1279 39th Av | Tam Woot Remodeling | infill 1/f rear below (e) 2/f. add family room, 2 bedrooms,2baths,2 closets on1/f.remodel (e) kitchen on 2/f,reconfig interior stairs,relocate (e) bath & add 1 bath on 2/f.remove lightwell staircase & infill 2/f. window replacment throughout. stucco repair at front.Details
infill 1/f rear below (e) 2/f. add family room, 2 bedrooms,2baths,2 closets on1/f.remodel (e) kitchen on 2/f,reconfig interior stairs,relocate (e) bath & add 1 bath on 2/f.remove lightwell staircase & infill 2/f. window replacment throughout. stucco repair at front. | $125,000 |
| Oct 28, 2021 | Never finaled issued Dec 2021, no final | 3031 Ulloa St | infill 1/f rear; add (n) family room, bedroom, walk-in closet,bathroom,guest room and storage; relocate (e) laundry area & waterheater/furnace all per plans.Details
infill 1/f rear; add (n) family room, bedroom, walk-in closet,bathroom,guest room and storage; relocate (e) laundry area & waterheater/furnace all per plans. | $50,000 | |
| Oct 27, 2021 | Completed final sign-off Jan 2022 | 261 Arleta Av | rev to pa202008131721: reconfigure new powder room to a full bath on g/f; relocate water heater & furnace. add wet bar on g/f. new entrance on g/f.Details
rev to pa202008131721: reconfigure new powder room to a full bath on g/f; relocate water heater & furnace. add wet bar on g/f. new entrance on g/f. | $2,500 | |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 2258 25th Av | Innovative Construction Implement | structural rev to pa202109208771. remove structural beam. reconfigure bathroom vanity location. remove structural beams, reconfigure bathroom vanity location & window size.Details
structural rev to pa202109208771. remove structural beam. reconfigure bathroom vanity location. remove structural beams, reconfigure bathroom vanity location & window size. | |
| Oct 25, 2021 | Completed final sign-off Aug 2022 | 3031 Ulloa St | to comply with nov 202050726 & 202045171. repair & replace (e) rear retaining wall.Details
to comply with nov 202050726 & 202045171. repair & replace (e) rear retaining wall. | $30,000 | |
| Oct 25, 2021 | Completed final sign-off Dec 2023 | 3957 Cesar Chavez St | add (n) m.bed,gym,ent. area and 1 bath on 1/f. remodel (e) kitchen, dining and bath on 2/f. convert (e) bed to m.bed on 2/f.convert 2 (e) bed to 1 m.bd. on 3/f.add (n) sunroom & roof deck on 3/f.Details
add (n) m.bed,gym,ent. area and 1 bath on 1/f. remodel (e) kitchen, dining and bath on 2/f. convert (e) bed to m.bed on 2/f.convert 2 (e) bed to 1 m.bd. on 3/f.add (n) sunroom & roof deck on 3/f. | $80,000 | |
| Oct 22, 2021 | Completed final sign-off Aug 2022 | 1482 29th Av | infill lightwell on 2/f per plan.add 1 family room, 2 bedroom & 2 baths on 1/f.remodel kitchen on 2/f.relocate & add 1 new bathroom,reconfig int & ext stairs.remove lightwell stucco stairs.wdw replacement to all,repair stucco in front.remove int plaster.upgrade all electrical.Details
infill lightwell on 2/f per plan.add 1 family room, 2 bedroom & 2 baths on 1/f.remodel kitchen on 2/f.relocate & add 1 new bathroom,reconfig int & ext stairs.remove lightwell stucco stairs.wdw replacement to all,repair stucco in front.remove int plaster.upgrade all electrical. | $200,000 | |
| Oct 14, 2021 | Completed final sign-off Jan 2022 | 3615 Alemany Bl | The Great Ocean General Contractor | to comply with nov202181037: to legalize as-build side entrance door on g/f. door not used for egress purposes.Details
to comply with nov202181037: to legalize as-build side entrance door on g/f. door not used for egress purposes. | $1,500 |
| Sep 27, 2021 | Completed final sign-off Aug 2023 | 196 Urbano Dr | amend to 202107063836: stucco replacement more than 50% permit per plans for front, rear and sides of building.Details
amend to 202107063836: stucco replacement more than 50% permit per plans for front, rear and sides of building. | $2,000 | |
| Sep 22, 2021 | Completed final sign-off Dec 2021 | 312 Mount Vernon Av | The Great Ocean General Contractor | to comply with complaint 202179604. remodel of (e) bathrooms, office and bedroom on 1/f per plan. add 3rd bathroom on 1/f.Details
to comply with complaint 202179604. remodel of (e) bathrooms, office and bedroom on 1/f per plan. add 3rd bathroom on 1/f. | $50,000 |
| Sep 20, 2021 | Completed final sign-off Oct 2022 | 20 Willard North St | relocate (e) laundry room from 1/f to 2/f. remodel (e) kitchen and bathroom on 2/f. add (n) master bathroom to (e) bed on 2/f. replace all windows.Details
relocate (e) laundry room from 1/f to 2/f. remodel (e) kitchen and bathroom on 2/f. add (n) master bathroom to (e) bed on 2/f. replace all windows. | $150,000 | |
| Sep 20, 2021 | Completed final sign-off Jul 2022 | 148 Foerster St | remodel (e) bathroom and add 1 (n) bathroom on 1/f. add 1 new master bathroom and 1 closet to (e) bedroom on 2/f. remodel (e) kitchen, dining room and living room on 2/f redesign (e) interior staircase. remove curb cut,new man door north sideDetails
remodel (e) bathroom and add 1 (n) bathroom on 1/f. add 1 new master bathroom and 1 closet to (e) bedroom on 2/f. remodel (e) kitchen, dining room and living room on 2/f redesign (e) interior staircase. remove curb cut,new man door north side | $150,000 | |
| Sep 20, 2021 | Completed final sign-off Mar 2022 | 2258 25th Av | Innovative Construction Implement | infill at g/f underneath (e) cantiliver structure on 2/f. relocate the (e) bathroom on (e) g/f. turn the (e) bedroom into entertainment area.Details
infill at g/f underneath (e) cantiliver structure on 2/f. relocate the (e) bathroom on (e) g/f. turn the (e) bedroom into entertainment area. | $40,000 |
| Sep 2, 2021 | Completed final sign-off Oct 2023 | 1250 12th Av | Hungto Co Incorporation | infill (s) lightwell & remove the (e) ext staircase.relocate the (e) powder rm,furance and w/h on 1/f.add 1 bath,1 office and 1 entertainment room on 1/f. infill (n) lightwell next to the (e) poweder room on 2/f. remodel 2/f.remodel 2/fDetails
infill (s) lightwell & remove the (e) ext staircase.relocate the (e) powder rm,furance and w/h on 1/f.add 1 bath,1 office and 1 entertainment room on 1/f. infill (n) lightwell next to the (e) poweder room on 2/f. remodel 2/f.remodel 2/f | $100,000 |
| Aug 30, 2021 | Never finaled issued Nov 2021, no final | 1900 Irving St | Applied General Construction Inc, Innovative Construction Implement | rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021)Details
rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021) | |
| Aug 30, 2021 | Never finaled issued Nov 2021, no final | 1906 Irving St | Innovative Construction Implement | rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021)Details
rev to pa202001232622 & 202010307798 - revise kitchen equipment, restroom layout and structural plan. as of 9/23/2021 - no exterior work - not callled out in scope but was in page a.4 - not to be in this permit review. (e.o cp 9/23/2021) | |
| Aug 27, 2021 | Completed final sign-off Mar 2023 | 3817 Folsom St | The Great Ocean General Contractor | relocate (e) kitchen, bathroom and living room on 1/f per plan. remove (e) 1 bathroom on 2/f per plan and remodel the (e) kitchen and (e) bathroom on 2/f. convert the (e) family room on 3/f into a master bedroom. new roof deck with stairs ref2018-008954enf. rev. 201710252224 and 201810052437.Details
relocate (e) kitchen, bathroom and living room on 1/f per plan. remove (e) 1 bathroom on 2/f per plan and remodel the (e) kitchen and (e) bathroom on 2/f. convert the (e) family room on 3/f into a master bedroom. new roof deck with stairs ref2018-008954enf. rev. 201710252224 and 201810052437. | $15,000 |
| Aug 20, 2021 | Completed final sign-off Dec 2021 | 782 36th Av | 782-784 36th avenue: structural rev to pa:202106172649: proposed concrete retiaing wall at rear, concrete steeps at southside of bldg and update shear wall location.Details
782-784 36th avenue: structural rev to pa:202106172649: proposed concrete retiaing wall at rear, concrete steeps at southside of bldg and update shear wall location. | $5,000 | |
| Aug 17, 2021 | Completed final sign-off Feb 2022 | 1506 Underwood Av | rev to pa202009265169: redesign front exterior staircase leading from 2/f to g/f.Details
rev to pa202009265169: redesign front exterior staircase leading from 2/f to g/f. | ||
| Jul 30, 2021 | Completed final sign-off Apr 2024 | 610 Holloway Av | Applied General Construction Inc | rev to pa201808207818. 1/f: reconfigure (e) bathrs & add (n) laundry.2/f: relocate (e) kitchen, add (n) laundry and reconfigure (e) bathroom & (e) powder room.reconfigure (e) 2/f & 3/f stairscase.3/f:reconfigure (e) master bath, add (n) w/c, add 2 dormers, 2 skylights.Details
rev to pa201808207818. 1/f: reconfigure (e) bathrs & add (n) laundry.2/f: relocate (e) kitchen, add (n) laundry and reconfigure (e) bathroom & (e) powder room.reconfigure (e) 2/f & 3/f stairscase.3/f:reconfigure (e) master bath, add (n) w/c, add 2 dormers, 2 skylights. | $60,000 |
| Jul 21, 2021 | Completed final sign-off Jan 2023 | 195 Margaret Av | new deck (less than 36in from grade) at ground floor with stairs to rear yard.Details
new deck (less than 36in from grade) at ground floor with stairs to rear yard. | $20,000 | |
| Jul 19, 2021 | Completed final sign-off Jan 2025 | 184 Jordan Av | J L General Construction Inc | rev to pa202007089808 & 202104148546: remove & replace foundation along gridline 1 & 5 insteal of underpinning per previous rev permit 202104148546. remove 2 windows on 1/f. remove 2 windows on 2/f.Details
rev to pa202007089808 & 202104148546: remove & replace foundation along gridline 1 & 5 insteal of underpinning per previous rev permit 202104148546. remove 2 windows on 1/f. remove 2 windows on 2/f. | |
| Jul 15, 2021 | Completed final sign-off Jul 2025 | 1518 Quesada Av | Shek's Construction Co | legalize unwarranted dwelling unit at ground floor per government code section 65852.2Details
legalize unwarranted dwelling unit at ground floor per government code section 65852.2 | $30,000 |
| Jul 14, 2021 | Completed final sign-off Jul 2022 | 1234 40th Av | Innovative Construction Implement | revision to pa# 202106243150 to clarify the foundation condition at property line. revised detail to confirm no underpinning occurs at adjacent propertyDetails
revision to pa# 202106243150 to clarify the foundation condition at property line. revised detail to confirm no underpinning occurs at adjacent property | |
| Jul 9, 2021 | Completed final sign-off Nov 2021 | 201 Chicago Wy | Innovative Construction Implement | rev pa202007089810: r/r 3 windows on 2/f rear.r/r 3 windows on 1/f rear. wdws not visible to stret. repair (e) siding at rear (east and right side (south) approx 30% - not visible to street.Details
rev pa202007089810: r/r 3 windows on 2/f rear.r/r 3 windows on 1/f rear. wdws not visible to stret. repair (e) siding at rear (east and right side (south) approx 30% - not visible to street. | |
| Jul 9, 2021 | Completed final sign-off Mar 2024 | 1234 Geneva Av | Ruby Plumbing & Electrical | 1234-1236 geneva ave: fire damange repair to 2/f only. repir to include celing members, wall members, elecvtrical wiring, plumbing and other fixtures including building structural as necessery. revert all damaged to building original condition and strutcurallly safe as compliance.Details
1234-1236 geneva ave: fire damange repair to 2/f only. repir to include celing members, wall members, elecvtrical wiring, plumbing and other fixtures including building structural as necessery. revert all damaged to building original condition and strutcurallly safe as compliance. | $20,000 |
| Jun 28, 2021 | Never finaled issued Jul 2021, no final | 1769 Oak St | repair front stairecase less than 50%, repair the rear wooden deck per plans less than 50%, replace the (e) french door to new french doors on 1/f, replace the (e) french doors to new sliding doors on 2nd & 3rd floors.Details
repair front stairecase less than 50%, repair the rear wooden deck per plans less than 50%, replace the (e) french door to new french doors on 1/f, replace the (e) french doors to new sliding doors on 2nd & 3rd floors. | $20,000 | |
| Jun 24, 2021 | Completed final sign-off Jul 2022 | 1234 40th Av | Innovative Construction Implement | rev to pa202011199280 structural only. proposed underpinning on garage level along guildline 1 & 4 to comply with min height requirement by excavation approx 8in. replace (e) overhead beam at garage level due to dryrot per plan.replace (e) roof joist on 2/f master bedroom at rear.Details
rev to pa202011199280 structural only. proposed underpinning on garage level along guildline 1 & 4 to comply with min height requirement by excavation approx 8in. replace (e) overhead beam at garage level due to dryrot per plan.replace (e) roof joist on 2/f master bedroom at rear. | |
| Jun 24, 2021 | Completed final sign-off Mar 2022 | 240 Santa Ana Av | Hong Shink Construction | 2/f: remodel/relocated (e) kitchen & bathroom, add new bedroom, dining and bathroom and removed wall withopen staircase. remodel (e) sace with new bathrooms and bedroom on 1/f.Details
2/f: remodel/relocated (e) kitchen & bathroom, add new bedroom, dining and bathroom and removed wall withopen staircase. remodel (e) sace with new bathrooms and bedroom on 1/f. | $150,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2023 | 588 12th Av | Innovative Construction Implement | 1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124.Details
1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124. | $45,000 |
| Jun 21, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | Innovative Construction Implement | rev pa202102184908: update structural plan acording to (e) conditions. relocated (e) bedroom and add 1 new bathroom, 1 wet bar on 1/f per plan. revised rear deck layout per plan. no change in height.Details
rev pa202102184908: update structural plan acording to (e) conditions. relocated (e) bedroom and add 1 new bathroom, 1 wet bar on 1/f per plan. revised rear deck layout per plan. no change in height. | $10,000 |
| Jun 17, 2021 | Completed final sign-off Dec 2021 | 782 36th Av | Kam's Construction Inc | 782-784 36th avenue: relocate (e) bathroom, family room & kitchen on 1/f per plans. add (n) mechanical room on 1/f. add 1 new bedroom, bathroom & closet on 2/f. relocate (e) kitchen on 2/f.Details
782-784 36th avenue: relocate (e) bathroom, family room & kitchen on 1/f per plans. add (n) mechanical room on 1/f. add 1 new bedroom, bathroom & closet on 2/f. relocate (e) kitchen on 2/f. | $80,000 |
| Jun 4, 2021 | Never finaled issued Dec 2021, no final | 425 43rd Av | rev pa 202103297446 at bsmt.relocate dining, kitchen,living rms on 2/f 3/f.add2 master bed,bath and closet on 2/f 3/f units.add 2 master bed, bath, closet & laundry on 1/f. add interior stairs connecting g/f and 2/f.replace damange bricks at front of building.cfc 8306041 comfirms 3 unitDetails
rev pa 202103297446 at bsmt.relocate dining, kitchen,living rms on 2/f 3/f.add2 master bed,bath and closet on 2/f 3/f units.add 2 master bed, bath, closet & laundry on 1/f. add interior stairs connecting g/f and 2/f.replace damange bricks at front of building.cfc 8306041 comfirms 3 unit | $150,000 | |
| May 17, 2021 | Never finaled issued Mar 2022, no final | 715 47th Av | add 1 bathroom on basement floor per plan.Details
add 1 bathroom on basement floor per plan. | $20,000 | |
| May 6, 2021 | Completed final sign-off Dec 2021 | 1309 Hayes St | Quality Home Builders Construction Inc | interior remodel of unit 1309 hayes street only: add 1 full bathroom, 1 shower room and one powder room to unit 1309. replace (e) windows in dining, kitchen, bedroom with like to like condition to unit 1309, not visable to street.Details
interior remodel of unit 1309 hayes street only: add 1 full bathroom, 1 shower room and one powder room to unit 1309. replace (e) windows in dining, kitchen, bedroom with like to like condition to unit 1309, not visable to street. | $22,000 |
| Apr 30, 2021 | Never finaled issued May 2021, no final | 215 Precita Av | B&H Builder Inc | rev pa#202012030171: remove kitchen island and relocate kitchen sink and d/w on 1/f per plan. propse a bigger door from 24in and 30in at the laundry machine area on the 1/f per plan.Details
rev pa#202012030171: remove kitchen island and relocate kitchen sink and d/w on 1/f per plan. propse a bigger door from 24in and 30in at the laundry machine area on the 1/f per plan. | |
| Apr 29, 2021 | Expired or cancelled withdrawn May 2021 | 1388 Alabama St | The Great Ocean General Contractor | relocate (e) bedroom on 3/f at nit 1388 per plan, add 1 bathroom, 1 new storage and 1 closet per plan. all work on 3/f under this permit.Details
relocate (e) bedroom on 3/f at nit 1388 per plan, add 1 bathroom, 1 new storage and 1 closet per plan. all work on 3/f under this permit. | $80,000 |
| Apr 29, 2021 | Completed final sign-off Aug 2021 | 571 Myra Wy | Innovative Construction Implement | rev to pa202006128650: to propose to replace and adding upper right unauthorized 9x7 sliding door with 9x5 window with center fixed, side casement aluminum-clad wood window.Details
rev to pa202006128650: to propose to replace and adding upper right unauthorized 9x7 sliding door with 9x5 window with center fixed, side casement aluminum-clad wood window. | $1,500 |
| Mar 12, 2021 | Completed final sign-off Feb 2022 | 485 23rd Av | Innovative Construction Implement | rev to pa201809241148 s1. upgragde structural according to (e) field condition. change proposed strong walls to new steel ordinary frames at front of bldg and repair (e) foundation along gridline 1 on 1/f. redesign interior staircase. relocate kitchen at 1/f. relocate rear stair, add retaining wall.Details
rev to pa201809241148 s1. upgragde structural according to (e) field condition. change proposed strong walls to new steel ordinary frames at front of bldg and repair (e) foundation along gridline 1 on 1/f. redesign interior staircase. relocate kitchen at 1/f. relocate rear stair, add retaining wall. | $18,000 |
| Mar 11, 2021 | Completed final sign-off Jul 2022 | 222 Madrid St | K L Construction & Remodeling | legalize one unwarranted dwelling unit on 1st floor of an (e) single family dwelling per legalization ordinance 43-14. legalize (e) laundry area into a dining room w/ kitchen on 1st floor plan.Details
legalize one unwarranted dwelling unit on 1st floor of an (e) single family dwelling per legalization ordinance 43-14. legalize (e) laundry area into a dining room w/ kitchen on 1st floor plan. | $15,000 |
| Feb 18, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | Innovative Construction Implement | reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bathDetails
reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bath | $200,000 |
| Feb 17, 2021 | Completed final sign-off Dec 2021 | 1928 23rd Av | new extension of 2/f deck with staircase to 1/f.Details
new extension of 2/f deck with staircase to 1/f. | $8,000 | |
| Feb 5, 2021 | Never finaled issued Mar 2021, no final | 3090 21st Av | renew 9717048 for inspection, all work is complete. remodel (e) bathroom, relocate furnace & water heater on 1/f. convert (e) gym room into master room with full bath on 1/f. replace larger window in new master bedroom & ent room. reconfigure bathroom fixtures on 2/f.Details
renew 9717048 for inspection, all work is complete. remodel (e) bathroom, relocate furnace & water heater on 1/f. convert (e) gym room into master room with full bath on 1/f. replace larger window in new master bedroom & ent room. reconfigure bathroom fixtures on 2/f. | $40,000 | |
| Feb 5, 2021 | Never finaled issued Mar 2021, no final | 1421 22nd Av | Hb Kitchen Bath Inc | enlarge the door opening at (e) laundry room on g/f per plan. remodel the (e) kitchen on 2/f per plan including bathroom remodel in like to like.Details
enlarge the door opening at (e) laundry room on g/f per plan. remodel the (e) kitchen on 2/f per plan including bathroom remodel in like to like. | $15,000 |
| Jan 29, 2021 | Never finaled issued Mar 2021, no final | 253 Paris St | Castle Construction | foundation repair. excavate and lower slab on 1/f.Details
foundation repair. excavate and lower slab on 1/f. | $20,000 |
| Jan 28, 2021 | Completed final sign-off Jul 2026 | 1221 Waller St | Alex Builder Inc | to comply with nov202056261.no work to be done on 1/f under this pemrit.add 1 new master bedroom on 2/f per plan.relocate (e) bathroom on 2/f per plan.enlarge (e) kitchen & living room on 2/f per plan.relocate laundry room on 2/f. repair/underpin (e) foundation.Details
to comply with nov202056261.no work to be done on 1/f under this pemrit.add 1 new master bedroom on 2/f per plan.relocate (e) bathroom on 2/f per plan.enlarge (e) kitchen & living room on 2/f per plan.relocate laundry room on 2/f. repair/underpin (e) foundation. | $30,000 |
| Jan 25, 2021 | Never finaled filed Jan 2021, never issued | 362 Vernon St | horizontal & vertical addition to add 2.854 sqft of habitableDetails
horizontal & vertical addition to add 2.854 sqft of habitable | $300,000 | |
| Jan 25, 2021 | Expired or cancelled cancelled Oct 2025 | 176 Farragut Av | vertical addition to a 2-story building. recofigure the existing interior staircase to comply with code. reconfigure interior for more habitable space.Details
vertical addition to a 2-story building. recofigure the existing interior staircase to comply with code. reconfigure interior for more habitable space. | $350,000 | |
| Jan 12, 2021 | Expired or cancelled withdrawn Apr 2026 | 522 Vienna St | rev to pa#201506229534: update to (e) condition of rear grade level at basement level & rear yard.add 1 (n) master bedroo, ,bathroom and closet at attic floor level.add 2 (n) dormers at attic level. relocate 1 bath & kitchen @2nd floor. add (n) storage, media, and bathroom at basement.Details
rev to pa#201506229534: update to (e) condition of rear grade level at basement level & rear yard.add 1 (n) master bedroo, ,bathroom and closet at attic floor level.add 2 (n) dormers at attic level. relocate 1 bath & kitchen @2nd floor. add (n) storage, media, and bathroom at basement. | $5,000 | |
| Oct 23, 2020 | Completed final sign-off May 2021 | 1675 32nd Av | U C Construction | reference complaint# 202055991 to legalize as-built deck located at the rear of the building on the garage floor.Details
reference complaint# 202055991 to legalize as-built deck located at the rear of the building on the garage floor. | $20,000 |
| Oct 22, 2020 | Expired or cancelled withdrawn Aug 2026 | 237 Sanchez St | erect a four story type 5 construction 5 units apartment buildingDetails
erect a four story type 5 construction 5 units apartment building | $1,500,000 | |
| Oct 6, 2020 | Completed final sign-off Jul 2026 | 1221 Waller St | Gary Liu | new dwelling unit @ basement level per adu ordinance 162-16Details
new dwelling unit @ basement level per adu ordinance 162-16 | $250,000 |
| Jul 8, 2020 | Completed final sign-off Feb 2021 | 743 Peru Av | Kmh Construction Company | add (n) exterior wooden deck at rear, btw street level & basement level. upgrade new staircase from basement to main fl & garage level. convert e 2 bedrooms into 1 family room & 1 office on street level. remodel e full bath w/ cosmetic elementsDetails
add (n) exterior wooden deck at rear, btw street level & basement level. upgrade new staircase from basement to main fl & garage level. convert e 2 bedrooms into 1 family room & 1 office on street level. remodel e full bath w/ cosmetic elements | $50,000 |
| Mar 10, 2020 | Completed final sign-off Oct 2021 | 1230 Shafter Av | Kennie Kwong Construction | add two bedrooms, one full bath and one media room @ ground floor. add one full bath @ 2nd floor. remodel (e) kitchen and bath @ 2nd floorDetails
add two bedrooms, one full bath and one media room @ ground floor. add one full bath @ 2nd floor. remodel (e) kitchen and bath @ 2nd floor | $58,888 |
| Oct 5, 2018 | Completed final sign-off Mar 2023 | 3817 Folsom St | The Great Ocean General Contractor | legalization of dwelling unit (1 bedroom & 1 bath) per ord# 43-14.Details
legalization of dwelling unit (1 bedroom & 1 bath) per ord# 43-14. | $12,500 |
| May 11, 2018 | Completed final sign-off Jul 2021 | 1111 Taraval St | change of use new limited retaurant, update accessibility/restroom new kitchen and equiptments, wash/prep area and new service counters. per conditional use 2015012697 cuaDetails
change of use new limited retaurant, update accessibility/restroom new kitchen and equiptments, wash/prep area and new service counters. per conditional use 2015012697 cua | $45,000 | |
| Nov 27, 2017 | Completed final sign-off Apr 2023 | 3817 Folsom St | The Great Ocean General Contractor | grnd flr: convert (e) first floor to (n) family room. provide (n) 1/2 bath. 2nd flr: remove (e) deck. 3rd flr: provide (2) new roof decks at front & rear.Details
grnd flr: convert (e) first floor to (n) family room. provide (n) 1/2 bath. 2nd flr: remove (e) deck. 3rd flr: provide (2) new roof decks at front & rear. | $40,000 |