Kam's Construction Inc
- Based in
- So San Francisco
- On San Francisco permits
- Jan 2012 to Aug 2025
- Last 24 months
- 1 permit filed
12 permits since 2000: 11 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2025 | Completed final sign-off Jan 2026 | 5 Turquoise Wy | kitchen remodel in-kind w/out changed plumbing location, add a subpanel in 2nd floor; install new cabinet & countertop; remove partition wallsDetails
kitchen remodel in-kind w/out changed plumbing location, add a subpanel in 2nd floor; install new cabinet & countertop; remove partition walls | $52,000 |
| Mar 21, 2024 | Completed final sign-off Jun 2024 | 737 Paris St | kitchen and bathroom remodel in kind w/o change. plumbing location replace bathtub in kind.Details
kitchen and bathroom remodel in kind w/o change. plumbing location replace bathtub in kind. | $45,000 |
| Aug 5, 2022 | Completed final sign-off Nov 2022 | 400 Quintara St | remodel 2nd floor kitchen and bathroom. no structure change.Details
remodel 2nd floor kitchen and bathroom. no structure change. | $30,000 |
| Jun 17, 2021 | Completed final sign-off Dec 2021 | 782 36th Av | 782-784 36th avenue: relocate (e) bathroom, family room & kitchen on 1/f per plans. add (n) mechanical room on 1/f. add 1 new bedroom, bathroom & closet on 2/f. relocate (e) kitchen on 2/f.Details
782-784 36th avenue: relocate (e) bathroom, family room & kitchen on 1/f per plans. add (n) mechanical room on 1/f. add 1 new bedroom, bathroom & closet on 2/f. relocate (e) kitchen on 2/f. | $80,000 |
| May 17, 2021 | Never finaled issued May 2021, no final | 782 36th Av | in-kind remodeling of 2 kitchen(s) in 1st fl, 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). need a "green tag" for electrical service equipment.Details
in-kind remodeling of 2 kitchen(s) in 1st fl, 2nd fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). need a "green tag" for electrical service equipment. | $80,000 |
| Jan 20, 2016 | Completed final sign-off May 2016 | 56 Restani Wy | add mud roo, 2 bedrooms, a storage room and 2 full baths on 1st floor. relocate laundry facilities. replace water heater and furnaceDetails
add mud roo, 2 bedrooms, a storage room and 2 full baths on 1st floor. relocate laundry facilities. replace water heater and furnace | $47,300 |
| Jan 8, 2016 | Completed final sign-off Jan 2016 | 1466 Hyde St | g/f -removal of non-bearing wall to provide path of travel to restroom that does not go through the kitchenDetails
g/f -removal of non-bearing wall to provide path of travel to restroom that does not go through the kitchen | $1,000 |
| Aug 21, 2014 | Completed final sign-off Feb 2015 | 66 Miramar Av | provide new bedroom and bathroom at ground floor, enlarge foyer at ground floor, remodel (e) bath and kitchen on 2/f, replace (e) lath & plaster with 5/8" type 'x" gyp bd. on 2/f.Details
provide new bedroom and bathroom at ground floor, enlarge foyer at ground floor, remodel (e) bath and kitchen on 2/f, replace (e) lath & plaster with 5/8" type 'x" gyp bd. on 2/f. | $45,000 |
| Jul 10, 2013 | Completed final sign-off Sep 2013 | 514 12th Av | replace in kind one french door, remove one pair of french door and reduce opening to retrive new window, use existing header and opening width & frame in wall below new window to match existing materials. all in back yard.Details
replace in kind one french door, remove one pair of french door and reduce opening to retrive new window, use existing header and opening width & frame in wall below new window to match existing materials. all in back yard. | $4,300 |
| Apr 30, 2013 | Completed final sign-off Jun 2013 | 176 Whipple Av | remodel (e) bath and (e) kitchen on 2nd fl. replace 2 (e) windows in kind at rear of bldg on 2nd fl. windows not visible from street. replacement windows to have u factor of 0.40 max. no change in walls & openings layout; kitchen lighting shall have min 50% wattage high efficiency; bathroom lightinDetails
remodel (e) bath and (e) kitchen on 2nd fl. replace 2 (e) windows in kind at rear of bldg on 2nd fl. windows not visible from street. replacement windows to have u factor of 0.40 max. no change in walls & openings layout; kitchen lighting shall have min 50% wattage high efficiency; bathroom lightin | $20,000 |
| Sep 4, 2012 | Completed final sign-off Dec 2012 | 45 Arleta Av | interior remodel s.f.d., add family room/entertainment room, bedroom, 2nd baths and storage room at ground floor. remove non-load bearing walls between kitchen and dining. add rear side deck and stairs on 2nd floor. replace all window on 2nd floor in kind.Details
interior remodel s.f.d., add family room/entertainment room, bedroom, 2nd baths and storage room at ground floor. remove non-load bearing walls between kitchen and dining. add rear side deck and stairs on 2nd floor. replace all window on 2nd floor in kind. | $40,000 |
| Jan 17, 2012 | Completed final sign-off May 2012 | 76 Miramar Av | remodel 1st floor (garage level)-convert family room into master bedroom & master bathroom. add playroom & 2 bathrooms. replace (e) furnace & water heater & (3) washer/dryer.Details
remodel 1st floor (garage level)-convert family room into master bedroom & master bathroom. add playroom & 2 bathrooms. replace (e) furnace & water heater & (3) washer/dryer. | $30,000 |