Kam's Construction Inc
- Based in
- So San Francisco
- On San Francisco permits
- Jan 2012 to Aug 2025
- Last 24 months
- 1 permit filed
12 permits since 2000: 11 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2012 | Completed final sign-off Dec 2012 | 45 Arleta Av | interior remodel s.f.d., add family room/entertainment room, bedroom, 2nd baths and storage room at ground floor. remove non-load bearing walls between kitchen and dining. add rear side deck and stairs on 2nd floor. replace all window on 2nd floor in kind.Details
interior remodel s.f.d., add family room/entertainment room, bedroom, 2nd baths and storage room at ground floor. remove non-load bearing walls between kitchen and dining. add rear side deck and stairs on 2nd floor. replace all window on 2nd floor in kind. | $40,000 |