Erica Severns
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Twinsteps Inc
- Based in
- Nevada City
- On San Francisco permits
- May 2008 to Dec 2023
16 permits since 2000 (architect on 11 permits, authorized agent-others on 2 permits, engineer on 2 permits, designer on 1 permit): 11 completed, 1 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 22, 2023 | In progress issued Feb 2024 | 1201 Bryant St | Skyline Construction | 3rd floor: installations of racks associated mep system and required structural anchorages in the hil lab space. roof-install vrf and package roof toop units.Details
3rd floor: installations of racks associated mep system and required structural anchorages in the hil lab space. roof-install vrf and package roof toop units. | $250,000 |
| May 17, 2023 | Completed final sign-off Aug 2024 | 201 Toland St | Richlen Construction | revision to pa#: 202011189158 add a new 2hr rated pre-fabriated storage container at the covered dock to store 20% ipa.Details
revision to pa#: 202011189158 add a new 2hr rated pre-fabriated storage container at the covered dock to store 20% ipa. | $15,000 |
| Jan 23, 2020 | Expired or cancelled withdrawn Mar 2020 | 1794 Filbert St | administrative(site) permit to 2016-0927-8915 s, boa approval in 12/12/2019. original siet permit-new 3rd story, 3 apt units, garage, 1 commercial. boa approval-new 3rd story, 4 apt units(including 1 adu), garage, commercial space eliminated. no work will be done under this permit.Details
administrative(site) permit to 2016-0927-8915 s, boa approval in 12/12/2019. original siet permit-new 3rd story, 3 apt units, garage, 1 commercial. boa approval-new 3rd story, 4 apt units(including 1 adu), garage, commercial space eliminated. no work will be done under this permit. | ||
| Sep 27, 2016 | Completed final sign-off Jan 2025 | 1794 Filbert St | Oltranti Construction Company Inc. | add 3rd story to (e) 2-story bldg. relocate (e) 1st flr unit to 3rd flr. remodel 2 units on 2nd flr. eliminate commercial space on 1st flr. add garage & accesory dwelling unit to 1st flr. install (n) siding,windows,roof,elevator,stair for all 4 units.Details
add 3rd story to (e) 2-story bldg. relocate (e) 1st flr unit to 3rd flr. remodel 2 units on 2nd flr. eliminate commercial space on 1st flr. add garage & accesory dwelling unit to 1st flr. install (n) siding,windows,roof,elevator,stair for all 4 units. | $1,450,000 |
| Jun 26, 2014 | Completed final sign-off May 2018 | 166 Sproule Ln | Cal C A D E Construction Inc | to erect 3 stories, 1 basement, 2 units condominium building.Details
to erect 3 stories, 1 basement, 2 units condominium building. | $1,163,000 |
| Aug 9, 2013 | Completed final sign-off Mar 2014 | 131 Caselli Av | remodel bath & enclose lightwell (24 sq ft), install new skylight, re-frame 1 closet wall & install new closet doors @2 closets. add cabinetry to family room, repl casement sashes @family room with like kind sashes. misc electrical on 2nd floor, no work on any other levels, no work in garage.Details
remodel bath & enclose lightwell (24 sq ft), install new skylight, re-frame 1 closet wall & install new closet doors @2 closets. add cabinetry to family room, repl casement sashes @family room with like kind sashes. misc electrical on 2nd floor, no work on any other levels, no work in garage. | $78,000 | |
| Sep 11, 2012 | Completed final sign-off Aug 2014 | 2535 18th St | Hilbers Inc. | oshpd3 project - new interior improvements for 25 station dialysis clinic with support space. this project will require oshpd3 approval .Details
oshpd3 project - new interior improvements for 25 station dialysis clinic with support space. this project will require oshpd3 approval . | $950,000 |
| Aug 15, 2012 | Completed final sign-off Aug 2014 | 2535 18th St | Hilbers Inc. | shell&core improv for future dialysis clinic. landscape on & off site, remove(e)fence & replace w/ new wrought iron fence. repave parking lots. refer blk&lot 4025/002,013,014 -2012-08-15-7378.Details
shell&core improv for future dialysis clinic. landscape on & off site, remove(e)fence & replace w/ new wrought iron fence. repave parking lots. refer blk&lot 4025/002,013,014 -2012-08-15-7378. | |
| Aug 15, 2012 | Completed final sign-off Aug 2014 | 626 Potrero Av | Hilbers Inc. | shell&core improv for future dialysis clinic.landscape,remove(e)fence&replc w/ new wrought iron fence.replace parking lots, demo interior. add elevator tower. replace doors&windows.reroof, add roof screen. new hvac units. (blk&lot 4025/001(2012-08-15-7382) shall be referenced to this permit.)Details
shell&core improv for future dialysis clinic.landscape,remove(e)fence&replc w/ new wrought iron fence.replace parking lots, demo interior. add elevator tower. replace doors&windows.reroof, add roof screen. new hvac units. (blk&lot 4025/001(2012-08-15-7382) shall be referenced to this permit.) | $750,000 |
| Jun 2, 2011 | Completed final sign-off Mar 2014 | 4 25th North Av | horizontal extension @ basement level only. deck on top of extension. at 1st floor, enclose (e) terrace / patio with glass walls & glass roof.Details
horizontal extension @ basement level only. deck on top of extension. at 1st floor, enclose (e) terrace / patio with glass walls & glass roof. | $150,000 | |
| Feb 14, 2011 | Expired or cancelled cancelled Nov 2018 | 1 Belmont Av | install new roof over front entry stairs.Details
install new roof over front entry stairs. | $8,000 | |
| Dec 22, 2010 | Expired or cancelled expired Jun 2018 | 71 Pierce St | Gech Inc., Green City Construction Inc | remove exterior back stairs.move unit b fr 3/fl to 1/fl.return 3/fl to orig use as bedrooms for unit a.horizontal extension on 3/fl rear.small infill extension on 2/fl rear. excavate at 1/fl to create new unit b.Details
remove exterior back stairs.move unit b fr 3/fl to 1/fl.return 3/fl to orig use as bedrooms for unit a.horizontal extension on 3/fl rear.small infill extension on 2/fl rear. excavate at 1/fl to create new unit b. | $200,000 |
| Apr 9, 2010 | Never finaled issued Dec 2010, no final | 1831 Grant Av | Kevin Webb Construction Inc | remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e)Details
remodel of top flr unit in rear-2 decks created by pulling in exterior walls, no extensions or additions to building. install new windows include 3 fire rated property line windows. remove wood burning firepace & replace with gas insert. new finishes throughout, bathrooms & kitchens remain in (e) | $150,000 |
| Apr 7, 2010 | Completed final sign-off Nov 2010 | 2646 Broderick St | William Thoms Construction | remodel bathroom, no exterior work, no structural work, replace kitchen countertops, no electrical work.Details
remodel bathroom, no exterior work, no structural work, replace kitchen countertops, no electrical work. | $39,000 |
| Oct 7, 2009 | Completed final sign-off May 2010 | 340 Kansas St | P K I Construction Company | t.i. remove one mezzannine,sheet rock some walls,new partial height non-bearing partitions, new cabinets, remove wood fl at front area, remove roll up door, add gate. install entrance lift, alter entry stairs. new sewing area for retail showroom.Details
t.i. remove one mezzannine,sheet rock some walls,new partial height non-bearing partitions, new cabinets, remove wood fl at front area, remove roll up door, add gate. install entrance lift, alter entry stairs. new sewing area for retail showroom. | $40,000 |
| May 28, 2008 | Completed final sign-off Mar 2009 | 2005 Lyon St | partial remodel of top floor unit 2005. no work on exterior of building. kitchen and 2 baths to be remodeled. ceiling in dining area being raised and partial wall in kitchen being removed. existing wood burning metal box fireplace being replaced with gas, reconfigure rooms.elect/plmb separate permitDetails
partial remodel of top floor unit 2005. no work on exterior of building. kitchen and 2 baths to be remodeled. ceiling in dining area being raised and partial wall in kitchen being removed. existing wood burning metal box fireplace being replaced with gas, reconfigure rooms.elect/plmb separate permit | $200,000 |