Peter Zepponi
- Listed as
- architect, engineer
- Firm
- Peter A. Zepponi, Aia
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Sep 2026
58 permits since 2000 (architect on 55 permits, engineer on 3 permits): 47 completed, 6 in progress, 2 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress issued Sep 2026 | 3 Balmy St | Barahona Brothers Construction Inc. | interior remodel of (e) kitchen. new powder room at 2/f.Details
interior remodel of (e) kitchen. new powder room at 2/f. | $65,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3 Balmy St | Barahona Brothers Construction Inc. | chimney demolitionDetails
chimney demolition | $18,000 |
| Jan 28, 2026 | In progress issued Feb 2026 | 65 Raycliff Tr | Stroub Construction | recommencement & completion of work approved under pa# 202111182729, 202104198802, 202409060299.Details
recommencement & completion of work approved under pa# 202111182729, 202104198802, 202409060299. | |
| May 29, 2025 | In progress issued Jul 2026 | 65 Raycliff Tr | Stroub Construction | revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build asDetails
revision 202406174663- 1st floor kitchen, study , dining , entry remodel, 2nd floor master suite, reconfigure (e) stairs and guard rails to be up to code. remove (e) bathroom #3. 3rd floor multi purpose room remodel, and add (n) powder room and support for (e) deck cantilever. mep design build as | $350,000 |
| Sep 6, 2024 | In progress issued Sep 2024 | 65 Raycliff Tr | Stroub Construction | revision to pa 202111182729. to remove the addition of adu and maintain existing single family use. remove one (e) closet wall and door. revise kitchen to remove full size range and hood and full size refrig. replace w/ under counter frig and 2-burner invention cooktop. remove designated adu addressDetails
revision to pa 202111182729. to remove the addition of adu and maintain existing single family use. remove one (e) closet wall and door. revise kitchen to remove full size range and hood and full size refrig. replace w/ under counter frig and 2-burner invention cooktop. remove designated adu address | $10,000 |
| Aug 4, 2023 | Completed final sign-off Dec 2023 | 1692 08th Av | Astorga Construction Inc | kitchen and diniing room remodel. remove wall between kitchen and dining.Details
kitchen and diniing room remodel. remove wall between kitchen and dining. | $60,000 |
| Oct 24, 2022 | In progress issued Feb 2024 | 2530 14th Av | Barahona Brothers Construction Inc. | 1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl.Details
1st fl:remove & replace(e)interior stair with a (n)stair to 2nd fl. 2nd fl:interior remodel,kitchen,full bath, add 1/2 bath,remove bedroom,new stair to 1st & 3rd fl.3rd fl:add bed and full bath to (e)fl,new stair to 2nd fl. | $200,000 |
| Jun 8, 2022 | Expired or cancelled expired Oct 2025 | 455 Melrose Av | Rinaldi Construction | add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater.Details
add new stair, mech room, bedroom, bath, family room to 1st fl. 2nd fl remodel (e) bedroom, bathroom & office into master suite. 3rd fl remove (e) fireplace. (n) heatpumps & tankless water heater. | $175,000 |
| May 2, 2022 | Completed final sign-off Jul 2022 | 84 Molimo Dr | corrective permit to document the construction work to comply with nov #201956581 "excavation, foundation and structural work, performed without permit, violation has been addressed undrer previously approved permit pa# 2019-0520-1153 ref drawngs s2.1, s3.1,s4.1,s4.2Details
corrective permit to document the construction work to comply with nov #201956581 "excavation, foundation and structural work, performed without permit, violation has been addressed undrer previously approved permit pa# 2019-0520-1153 ref drawngs s2.1, s3.1,s4.1,s4.2 | $40,000 | |
| Apr 29, 2022 | Never finaled issued May 2022, no final | 2530 14th Av | Barahona Brothers Construction Inc. | demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level.Details
demolition of (e) partitions & finishes, structural & foundation upgrades, remove & replace fau & water heater. add bedroom & bathroom & laundry @ garage level. | $60,000 |
| Jan 26, 2022 | Completed final sign-off Jul 2022 | 84 Molimo Dr | to comply with nov #202289252.new 1 hour wall at property line. reduce size of (e) deck. replace (e) deck stair with new stair to rear yard. 2nd floor deck at rear demolish and rebuild.Details
to comply with nov #202289252.new 1 hour wall at property line. reduce size of (e) deck. replace (e) deck stair with new stair to rear yard. 2nd floor deck at rear demolish and rebuild. | $16,000 | |
| Apr 16, 2021 | Completed final sign-off Jul 2022 | 112 Molimo Dr | Barahona Brothers Construction Inc. | 1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights.Details
1st fl: garage infill, 1 bedroom, 1 bathroom, laundry, (n) stair, furnace & tankless water heater. 2nd fl: remodel kitchen /dining /living room. remodel bathroom in-kind replacements. reroof. patch & repair (e) skylights. | $300,000 |
| Nov 3, 2020 | Never finaled issued Nov 2020, no final | 1474 06th Av | Seamus R Cudden | revision to pa #201801027653 - due to correction notice and public safety, remove and replace existing brick stairs in kind as a revision to approved plans. rebuild garage door opening. existing porch to remainDetails
revision to pa #201801027653 - due to correction notice and public safety, remove and replace existing brick stairs in kind as a revision to approved plans. rebuild garage door opening. existing porch to remain | $30,000 |
| Feb 28, 2020 | Completed final sign-off Mar 2021 | 76 Molimo Dr | Barahona Brothers Construction Inc. | 1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bathDetails
1/f: relocate (e) stair, bedroom, 1 closet remodel, new furnace & tankless water heater. 2/f: kitchen & dining room remodel, new stair, remove f.p, add 1/2 bath | $110,000 |
| Oct 22, 2019 | Completed final sign-off Feb 2021 | 12 Whitney St | Patrick Coakley Construction | unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen.Details
unit #12 remodel:replace (e) foundations & new slab to convert (e) unconditioned space into habitable @ 1st fl& convert (e) 2nd fl unit withnew stair;add 2 bedrooms & 2 bathrooms & laundry hook ups @ 1st fl; widen & 1 hr rate (e) passage.(n) fau & tankless water hetaer; 2nd fl - remodel kitchen. | $500,000 |
| Oct 9, 2019 | Expired or cancelled expired Oct 2025 | 455 Melrose Av | Rinaldi Construction | remove and replace extg rear decks and stairs with new . new windows and doors at rear wall not visible from street.Details
remove and replace extg rear decks and stairs with new . new windows and doors at rear wall not visible from street. | $35,000 |
| May 20, 2019 | Completed final sign-off Jul 2022 | 84 Molimo Dr | Barahona Brothers Construction Inc. | interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom.Details
interior remodel: 1st floor: relocate extg stair to 2nd floor, master bedroom/bath/office remodel, relocate laundry, add entry closet,new furnace, tankless water heater. 2nd fl: kitchen/dining remodel, remodel 2 bedrooms, 1 bathroom. | $190,000 |
| Mar 7, 2019 | Completed final sign-off Nov 2019 | 48 Coventry Ct | C G Adams Construction | interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heaterDetails
interior remodel; kitchen, stairway, 2 bath rooms, bedroom remodel, laundry closet, new fav & tankless water heater | $200,000 |
| Aug 21, 2018 | Completed final sign-off Jul 2020 | 48 Molimo Dr | Barahona Brothers Construction Inc. | 1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island.Details
1st flr: rear yard ground level addition w/ roof dekc above. add 1/2 bathroom & family room. 2nd flr: new patio door to roof deck. clearestory skylight over kitchen island. | $110,000 |
| Mar 7, 2018 | Completed final sign-off Sep 2018 | 48 Molimo Dr | Barahona Brothers Construction Inc. | residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof.Details
residential interior remodel due to structural fire next door and fire dept fighting fire. remodel kitchen, dining, living, stairs, entry, bedrooms, laundry, bathroom, new hvac and water heater relocated. patch rear siding to match (e), patch & repair roof. | $80,000 |
| Aug 2, 2017 | Completed final sign-off Apr 2019 | 1722 08th Av | Seamus R Cudden | remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry.Details
remove exterior deck stair & infill 1/f to property line wall, create new interior hallway connect to upper level. remodel 1/f space to include bedroom, bathroom, mech room. (n) decking & laundry. | $180,000 |
| Jul 13, 2017 | Completed final sign-off Sep 2019 | 500 Teresita Bl | sun room interior remodel. add roof deck to existing sunroom. new sliging door to roof deckDetails
sun room interior remodel. add roof deck to existing sunroom. new sliging door to roof deck | $25,000 | |
| Apr 24, 2017 | Completed final sign-off Feb 2021 | 501 Teresita Bl | Seamus R Cudden | add single story rear yard addition w/ a roof deck above. (n) stairway, rec room, 1/2 bath, wet bar, storage. 2nd flr: kitchen, dining, family rm remodel. gas fp insert, bath remodel, wet bar, horizontal extension. 3rd flr: 3 bdrms & laundry.Details
add single story rear yard addition w/ a roof deck above. (n) stairway, rec room, 1/2 bath, wet bar, storage. 2nd flr: kitchen, dining, family rm remodel. gas fp insert, bath remodel, wet bar, horizontal extension. 3rd flr: 3 bdrms & laundry. | $400,000 |
| Aug 5, 2016 | Completed final sign-off Mar 2017 | 1692 08th Av | Seamus R Cudden | remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/hDetails
remodel lower level basement - 1 bed 1 1/2 bath. relocate (e) bedroom 1 & bath 1. remodel lower level deck add bedroom 2. convert 1/2 bath 2 to full bath 2 relocate laundry. add family room. new fau & w/h | $150,000 |
| Apr 21, 2016 | Completed final sign-off Sep 2016 | 511 Alvarado St | Barahona Brothers Construction Inc. | add full bathroom in garage, convert (e) enclosed exterior space into a bedroom, infill wall opening with door, replace (e) furnace & water heater with new.no work visible from street.Details
add full bathroom in garage, convert (e) enclosed exterior space into a bedroom, infill wall opening with door, replace (e) furnace & water heater with new.no work visible from street. | $60,000 |
| Nov 9, 2015 | Completed final sign-off Jul 2016 | 1238 Willard St | add dormers, 1 1/2 bathrooms, wet bar, and laundry to 4th floor. convert (e) attic into habitable 4th floor.Details
add dormers, 1 1/2 bathrooms, wet bar, and laundry to 4th floor. convert (e) attic into habitable 4th floor. | $75,000 | |
| Sep 24, 2015 | Completed final sign-off Jun 2016 | 358 Edinburgh St | garage infill - add bedroom, bathroom, mud room/office, laundry, (n) furnace & water heater, ground level deck .Details
garage infill - add bedroom, bathroom, mud room/office, laundry, (n) furnace & water heater, ground level deck . | $95,000 | |
| Aug 31, 2015 | Completed final sign-off Jun 2018 | 840 Fell St | split existing 3/f off as seperate unit, add sprinklers to 3/f & stairway, add 1 hr. entry door to unit #2 and new unit #3, add range to existing wet bar to make into kitchen.Details
split existing 3/f off as seperate unit, add sprinklers to 3/f & stairway, add 1 hr. entry door to unit #2 and new unit #3, add range to existing wet bar to make into kitchen. | $17,000 | |
| Aug 14, 2015 | Completed final sign-off Sep 2018 | 75 Molimo Dr | Barahona Brothers Construction Inc. | rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks.Details
rear yard addition. 1st floor: master bed / bath remodel. laundry. 2nd floor: kitchen / dining remodel. new rear windows. replace (e) decks with new rear decks. | $140,000 |
| Jun 23, 2015 | Completed final sign-off Aug 2018 | 161 Hamerton Av | Keen Construction Incorporated | horiz/vert.additn.add new 3/fl w/3 bedrms &2 bathrms.kitchen/dining/fam remodel.remove 2 bedrms.full bath to 1/2. 1st ground:1 car garage to remain.remove ext stair&move to interior.laundry,remodel 2(e)bedrooms &1 (e)bathroom.bsmt/storage lower slab for 8' ceiling.add 1/2 bath& utility sink.Details
horiz/vert.additn.add new 3/fl w/3 bedrms &2 bathrms.kitchen/dining/fam remodel.remove 2 bedrms.full bath to 1/2. 1st ground:1 car garage to remain.remove ext stair&move to interior.laundry,remodel 2(e)bedrooms &1 (e)bathroom.bsmt/storage lower slab for 8' ceiling.add 1/2 bath& utility sink. | $500,000 |
| Nov 25, 2014 | Completed final sign-off Feb 2016 | 264 Evelyn Wy | Alive Design & Construction | ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rearDetails
ground fl: new bath, laundry room, remodel e bedroom, new floor slab. 2nd fl: kitchen/dining room, remodel/relocate bedroom to livng room, new entry. aprox. 40% existing interior framing to remain. new deck at rear | $200,000 |
| Nov 25, 2013 | Completed final sign-off Jul 2015 | 903 Sanchez St | Keen Construction Incorporated | add 3rd floor master bedroom, bathroom & roof deck. 2nd floor: remodel kitchen, reconfigure to create additional bedroom. new stairway. 1st floor: extend new stair to ground floor.Details
add 3rd floor master bedroom, bathroom & roof deck. 2nd floor: remodel kitchen, reconfigure to create additional bedroom. new stairway. 1st floor: extend new stair to ground floor. | $185,000 |
| May 23, 2013 | Completed final sign-off Jun 2015 | 111 Dellbrook Av | Grand American Construction Co | 2nd level: open (e) stairway to living area. add skylight. convert (e) bedroom to den. add roof deck over ground level addition with stair to rear yard. 1st levels horizontal extension. rear yard extension include 2 bedrooms, 1 new bath, remodel (e) bedroom & bathroom. laundry, new fau & h2o heater.Details
2nd level: open (e) stairway to living area. add skylight. convert (e) bedroom to den. add roof deck over ground level addition with stair to rear yard. 1st levels horizontal extension. rear yard extension include 2 bedrooms, 1 new bath, remodel (e) bedroom & bathroom. laundry, new fau & h2o heater. | $110,000 |
| May 15, 2013 | Completed final sign-off Aug 2013 | 2138 Beach St | partial removal of non-load bearing wall between kitchen & family room, 1/2 wall to remain between rooms, relocating existing wall outlets.Details
partial removal of non-load bearing wall between kitchen & family room, 1/2 wall to remain between rooms, relocating existing wall outlets. | $6,000 | |
| Apr 15, 2013 | Completed final sign-off Apr 2014 | 940 Laguna Honda Bl | Bevilacqua & Sons | remodel of front yard landscaping. enclose yard w/new fence of 6ft.Details
remodel of front yard landscaping. enclose yard w/new fence of 6ft. | $40,000 |
| Mar 15, 2013 | Completed final sign-off Nov 2013 | 267 Teresita Bl | Creative Tile Design | garage infill, kitchen & bath remodel, rear ground level deck, garage infill to include: (2) bedrooms, 1-1/2 bathrooms, (1) family room, relocate laundry to closet, new slab on grade, new foundations, new windows.Details
garage infill, kitchen & bath remodel, rear ground level deck, garage infill to include: (2) bedrooms, 1-1/2 bathrooms, (1) family room, relocate laundry to closet, new slab on grade, new foundations, new windows. | $130,000 |
| Jan 17, 2012 | Completed final sign-off Mar 2013 | 99 Marietta Dr | kitchen and bath remodel. add entry closet. add bath and walk in closet to master bedroom. extend e stair to lower level. partial rear window replacement. convert bedroom into family room. remove non complieant stair from garage to lower level. new landing and stair at rear yard.Details
kitchen and bath remodel. add entry closet. add bath and walk in closet to master bedroom. extend e stair to lower level. partial rear window replacement. convert bedroom into family room. remove non complieant stair from garage to lower level. new landing and stair at rear yard. | $110,000 | |
| May 16, 2011 | Completed final sign-off Oct 2011 | 2138 Beach St | Ryan C Hu | add interior stair within single unit from garage level to the floor above. convert shower to closet on 2nd floor. replace rear window and doorDetails
add interior stair within single unit from garage level to the floor above. convert shower to closet on 2nd floor. replace rear window and door | $50,000 |
| Dec 15, 2010 | Completed final sign-off Jul 2011 | 31 Marietta Dr | Seamus R Cudden | revision to pa #201011124832 & 201012015895; remove & replace existing foundation @ rear and east wall & front; place new foundation adjacent to old foundation at west side. replace (e) wood beam with steel beam above garage.Details
revision to pa #201011124832 & 201012015895; remove & replace existing foundation @ rear and east wall & front; place new foundation adjacent to old foundation at west side. replace (e) wood beam with steel beam above garage. | $30,000 |
| Nov 9, 2009 | Completed final sign-off Dec 2009 | 1512 Clay St | Seamus R Cudden | revision to pa# 2008.09.23.2422. partial gagare excavation and retraining wakk, slab and under pinning. stair framing modifications. no exterior workDetails
revision to pa# 2008.09.23.2422. partial gagare excavation and retraining wakk, slab and under pinning. stair framing modifications. no exterior work | $5,000 |
| Jun 29, 2009 | Completed final sign-off Aug 2009 | 701 Miramar Av | replace double garage door with two single doors.Details
replace double garage door with two single doors. | $6,500 | |
| Jun 12, 2009 | Completed final sign-off Sep 2009 | 1973 17th Av | Patrick Keaney Const | convert (e) garage space into music room. install new windows & door. replace (e) sink with new sink. one parking space to remain.Details
convert (e) garage space into music room. install new windows & door. replace (e) sink with new sink. one parking space to remain. | $40,000 |
| May 11, 2009 | Completed final sign-off May 2012 | 70 Eastwood Dr | horizontal addition: ground floor - add bedroom, bathroom, den addition w/roof deck, relocate f.a.u. & w.h. tank; 2nd floor - enlarge kitchen & bathroom fixtures remodel; replace (e) stair with new stair between ground & 2nd floor; replace portion of conc slab & footings.Details
horizontal addition: ground floor - add bedroom, bathroom, den addition w/roof deck, relocate f.a.u. & w.h. tank; 2nd floor - enlarge kitchen & bathroom fixtures remodel; replace (e) stair with new stair between ground & 2nd floor; replace portion of conc slab & footings. | $165,000 | |
| Apr 24, 2009 | Completed final sign-off May 2009 | 1518 Clay St | new laundry hookups and add closet in bedroom at second floor.Details
new laundry hookups and add closet in bedroom at second floor. | $5,000 | |
| Oct 27, 2008 | Completed final sign-off Jan 2009 | 115 Greenwood Av | kitchen remodel. replace cabinets and floor and lighting. new pass through opening to dining room. infill e door from kitchen to dining roomDetails
kitchen remodel. replace cabinets and floor and lighting. new pass through opening to dining room. infill e door from kitchen to dining room | $28,000 | |
| Sep 23, 2008 | Completed final sign-off Dec 2009 | 1512 Clay St | Becca Construction Inc | garage storage remodel. relocate post, new slab, 2 new flourescent lights.Details
garage storage remodel. relocate post, new slab, 2 new flourescent lights. | $3,500 |
| May 20, 2008 | Completed final sign-off Nov 2008 | 1522 Clay St | interior remodel of unit 1522 on the 3rd fl- kitchen, bathroom,add closets, reinish surfaces, update electrical, relocate w/d and removal of non-bearing wallsDetails
interior remodel of unit 1522 on the 3rd fl- kitchen, bathroom,add closets, reinish surfaces, update electrical, relocate w/d and removal of non-bearing walls | $70,000 | |
| May 19, 2008 | Completed final sign-off Nov 2008 | 157 Westwood Dr | ground level garage build out to include: 2 bedrooms, 2 baths, landry room, upgrade stair between floors partial footing and slab replacmentDetails
ground level garage build out to include: 2 bedrooms, 2 baths, landry room, upgrade stair between floors partial footing and slab replacment | $140,000 | |
| May 15, 2008 | Completed final sign-off Nov 2008 | 71 Gaviota Wy | ground level garage infill. add bedroom & living room, bathroom, laundry, and stairway.Details
ground level garage infill. add bedroom & living room, bathroom, laundry, and stairway. | $80,000 | |
| Dec 31, 2007 | Completed final sign-off May 2010 | 840 Fell St | Q Design Construction | remodel existing 4th floor. add 3 bedrooms, 2 bathrooms. replace portion of pitched roof with flat roof. new stairs to roof. new deck & interior stairs to 4th floor.Details
remodel existing 4th floor. add 3 bedrooms, 2 bathrooms. replace portion of pitched roof with flat roof. new stairs to roof. new deck & interior stairs to 4th floor. | $200,000 |
| Dec 28, 2007 | Completed final sign-off Jun 2008 | 1512 Clay St | kitchen & bath remodel, laundry room remodel, general repair & maintenance all work in one unit.Details
kitchen & bath remodel, laundry room remodel, general repair & maintenance all work in one unit. | $60,000 | |
| Jul 8, 2005 | Completed final sign-off Jul 2006 | 66 Juanita Wy | kitchen remodel-new cabinets, skylights, finishes, appliances, enclosing lightwell. bathrm remodel:Details
kitchen remodel-new cabinets, skylights, finishes, appliances, enclosing lightwell. bathrm remodel: | $70,000 | |
| Mar 2, 2005 | Completed final sign-off Apr 2005 | 207 Bella Vista Wy | Patrick Keaney Const | minor dry rot repair visible from street.Details
minor dry rot repair visible from street. | $2,000 |
| Mar 2, 2005 | Completed final sign-off Nov 2005 | 211 Bella Vista Wy | Patrick Keaney Const | minor dry rot repair visible from streetDetails
minor dry rot repair visible from street | $2,000 |
| Jan 21, 2005 | Completed final sign-off Jul 2005 | 401 Bella Vista Wy | kitchen remodel - new cabinets, remove partical wall, island, fixtures, flooring, repace two windowDetails
kitchen remodel - new cabinets, remove partical wall, island, fixtures, flooring, repace two window | $50,000 | |
| Nov 29, 2004 | Expired or cancelled expired Apr 2010 | 211 Bella Vista Wy | kitchen remodel/replace furnace basement. add bath & laundry room w/in garage. in fill lightwell.Details
kitchen remodel/replace furnace basement. add bath & laundry room w/in garage. in fill lightwell. | $40,000 | |
| Oct 28, 2004 | Completed final sign-off Apr 2005 | 11 Gladys St | replace canopy in front of house, complete remodel of bathroom on the main floor, not to exceed enveDetails
replace canopy in front of house, complete remodel of bathroom on the main floor, not to exceed enve | $15,000 | |
| Oct 25, 2004 | Completed final sign-off Oct 2005 | 525 Rockdale Dr | remove rear deck sunroom addition & replace w/(n)bay window,repair (e)deck,replace decking w/'trex'Details
remove rear deck sunroom addition & replace w/(n)bay window,repair (e)deck,replace decking w/'trex' | $40,000 |