Block 3162, lot 002
115 Greenwood Ave
- City’s use
- Single Family Residential
- Built
- 1923
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,140 sq ft
- Lot
- 4,329 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 22, 2021 | Never finaled issued Mar 2021, no final | 115 Greenwood Av | Gateway Roofing And Water Proofing Inc | re-roofing: remove and replace roofing material / existing roofing material (in-kind)Details
re-roofing: remove and replace roofing material / existing roofing material (in-kind) | $18,800 |
| Sep 2, 2014 | Completed final sign-off Feb 2015 | 115 Greenwood Av | Dba Golden Gate Termite, Diodati Inc | repairs to the front stairs. no change to design. no structural repairs. less than 50%. like for like.Details
repairs to the front stairs. no change to design. no structural repairs. less than 50%. like for like. | $19,500 |
| Oct 27, 2008 | Completed final sign-off Jan 2009 | 115 Greenwood Av | kitchen remodel. replace cabinets and floor and lighting. new pass through opening to dining room. infill e door from kitchen to dining roomDetails
kitchen remodel. replace cabinets and floor and lighting. new pass through opening to dining room. infill e door from kitchen to dining room | $28,000 | |
| Oct 22, 2002 | Completed final sign-off Oct 2002 | 115 Greenwood Av | Cas Construction | to renew app#2001/09/18/8592 for final inspection.Details
to renew app#2001/09/18/8592 for final inspection. | |
| Aug 5, 2002 | Completed final sign-off Oct 2002 | 115 Greenwood Av | Cas Construction | pa 200110231400-convert bedroom #2 to study room as planDetails
pa 200110231400-convert bedroom #2 to study room as plan | |
| Oct 23, 2001 | Completed final sign-off Oct 2002 | 115 Greenwood Av | Cas Construction | convert extg uninhabitalbe ground floor space into new playroom/bthrm/2 bdrm/838 sq ftDetails
convert extg uninhabitalbe ground floor space into new playroom/bthrm/2 bdrm/838 sq ft | $40,000 |
| Sep 18, 2001 | Completed final sign-off Oct 2002 | 115 Greenwood Av | Cas Construction | replace perimeter concrete foundationDetails
replace perimeter concrete foundation | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cas Construction (4), Dba Golden Gate Termite, Diodati Inc, Gateway Roofing And Water Proofing Inc
- Architects
- Peter Zepponi
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.