Mike P Abell
- Listed as
- architect, engineer, pmt consultant/expediter
- Firm
- City Structural Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2015 to Jun 2026
58 permits since 2000 (engineer on 53 permits, architect on 4 permits, pmt consultant/expediter on 1 permit): 39 completed, 5 in progress, 5 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 29, 2026 | In progress filed Jun 2026, not yet issued | 25 Parnassus Av | seismic strengthening. interior and exterior remodel to include replace rear door in kind and mep work.Details
seismic strengthening. interior and exterior remodel to include replace rear door in kind and mep work. | $250,000 | |
| May 29, 2026 | Completed final sign-off Sep 2026 | 373 Capp St | Seismic Retrofitters Inc. | voluntary strengthening at ground floor.Details
voluntary strengthening at ground floor. | $130,000 |
| May 23, 2025 | In progress issued Sep 2025 | 2230 Mission St | Arris Build Group, Inc. | foundation repair, replace due to field condition. reference building permit# 2018-0914-0336. upgrade existing restroom to fully accessible.Details
foundation repair, replace due to field condition. reference building permit# 2018-0914-0336. upgrade existing restroom to fully accessible. | $50,000 |
| Feb 4, 2025 | In progress issued Feb 2025 | 501 Crescent Av | Atrisco Construction | revision to approved pa # 2021-0317-6756 add 3 (n) bathrooms, relocate the kitchen & reconfigure interior walls. rear yard design. change window frame material from aluminum to fibrex. change wall finish stucco to hardie architectural panel. no change to the exterior envelope, total sq ft orDetails
revision to approved pa # 2021-0317-6756 add 3 (n) bathrooms, relocate the kitchen & reconfigure interior walls. rear yard design. change window frame material from aluminum to fibrex. change wall finish stucco to hardie architectural panel. no change to the exterior envelope, total sq ft or | $23,100 |
| Aug 6, 2024 | Completed final sign-off Dec 2024 | 167 Fair Oaks St | Als Builders Pro Inc | voluntary strengthening at foundation - new concrete foundation footings cast against existing brick foundation at corners of outer building perimeter and inner building courtyard. new collector elements at g/f framing.Details
voluntary strengthening at foundation - new concrete foundation footings cast against existing brick foundation at corners of outer building perimeter and inner building courtyard. new collector elements at g/f framing. | $100,000 |
| Jul 18, 2024 | In progress filed Jul 2024, not yet issued | 3562 18th St | structural- garage renovation. removal of existing wood post and beam system. new steel post and beam system with new isolated foundation footings at each new steel post adjustment to layout of hallway typical stud wall. (shared garage)Details
structural- garage renovation. removal of existing wood post and beam system. new steel post and beam system with new isolated foundation footings at each new steel post adjustment to layout of hallway typical stud wall. (shared garage) | $25,000 | |
| Jul 1, 2024 | Completed final sign-off Aug 2024 | 3854 26th | Connor Daly Corporation | voluntary strenghtening at ground floor per 2022 cebc ch. a-4.Details
voluntary strenghtening at ground floor per 2022 cebc ch. a-4. | $20,000 |
| Jun 24, 2024 | Completed final sign-off May 2025 | 1476 California St | Arris Build Group, Inc. | residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.Details
residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards. | $75,000 |
| Jun 24, 2024 | Completed final sign-off Jun 2025 | 1490 California St | Arris Build Group, Inc. | commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.Details
commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards. | $15,000 |
| Apr 8, 2024 | Completed final sign-off May 2024 | 1027 Fell St | Connor Daly Corporation | voluntary strengthening at ground flDetails
voluntary strengthening at ground fl | $58,000 |
| Nov 15, 2023 | In progress issued Dec 2023 | 2230 Leavenworth St | response to nov# 202313401. new structural calculations for planters on roof. plan shows planters. change guardrail from glass to decorative iron. structural response to connection comment. ref pa# 201909252739.Details
response to nov# 202313401. new structural calculations for planters on roof. plan shows planters. change guardrail from glass to decorative iron. structural response to connection comment. ref pa# 201909252739. | $35,000 | |
| Jul 19, 2023 | Never finaled issued Aug 2023, no final | 1 Santa Ysabel Av | Mission Home Remodeling Inc | revision to pa# 202306230703. front stair replacement. dry rot repair > 50%, replace in kindDetails
revision to pa# 202306230703. front stair replacement. dry rot repair > 50%, replace in kind | |
| Jun 9, 2023 | Completed final sign-off Jun 2023 | 66 Cumberland St | revision to pa 201712085880 & 202203220559 (recommencement permit to 201712085880)Details
revision to pa 201712085880 & 202203220559 (recommencement permit to 201712085880) | ||
| Oct 26, 2022 | Completed final sign-off Feb 2023 | 2751 Clay St | Sft Construction Corp | madatory soft stoy retrofit per sfebc ch 4dDetails
madatory soft stoy retrofit per sfebc ch 4d | $28,000 |
| Mar 28, 2022 | Expired or cancelled cancelled Jan 2026 | 1027 Lake St | voluntary strengthening at ground floor.Details
voluntary strengthening at ground floor. | $10,000 | |
| Oct 1, 2021 | Completed final sign-off Aug 2022 | 617 Castro St | Sft Construction Corp, Connor Daly Corporation | voluntary foundation strengthening.Details
voluntary foundation strengthening. | $24,000 |
| Jul 9, 2021 | Completed final sign-off Jun 2023 | 60 Collins St | S O D Home Group | (n) bedroom & study @ ground floor. residiential renovation w/new interior stair, (n) interior wall framing (n) bedroom + study at ground floor.Details
(n) bedroom & study @ ground floor. residiential renovation w/new interior stair, (n) interior wall framing (n) bedroom + study at ground floor. | $18,000 |
| Jul 8, 2021 | Expired or cancelled cancelled Jan 2026 | 3007 California St | voluntary strengthening @ ground floorDetails
voluntary strengthening @ ground floor | $18,000 | |
| Jun 11, 2021 | Completed final sign-off Aug 2022 | 1974 34th Av | E.J. Builders | convert (e) garage area to new master bed, 1 bed, den, laundry closet and batrhoom.new interior stairway.reconfig interior walls.new wdws and ext sliding doors.new ext stairs and deck at 2/f, rear side.replace all (e) windows in-kind.(e) attic space to be removed and new ceiling raised to (e) roofDetails
convert (e) garage area to new master bed, 1 bed, den, laundry closet and batrhoom.new interior stairway.reconfig interior walls.new wdws and ext sliding doors.new ext stairs and deck at 2/f, rear side.replace all (e) windows in-kind.(e) attic space to be removed and new ceiling raised to (e) roof | $150,000 |
| Apr 14, 2021 | Expired or cancelled withdrawn Aug 2023 | 2052 Greenwich St | voluntary structural strengthening.Details
voluntary structural strengthening. | $18,000 | |
| Apr 14, 2021 | Never finaled issued Aug 2022, no final | 1170 South Van Ness Av | kitchen & bathroom remodel. new interior door opening.Details
kitchen & bathroom remodel. new interior door opening. | $6,000 | |
| Mar 17, 2021 | Never finaled issued Nov 2022, no final | 501 Crescent Av | Atrisco Construction | demo (e) 2-story single family dwelling. (collapsed in 2016, only stair/wall remaining.)Details
demo (e) 2-story single family dwelling. (collapsed in 2016, only stair/wall remaining.) | $650 |
| Mar 17, 2021 | Expired or cancelled cancelled Jan 2026 | 281 Amber Dr | new retaining wall in backyard.Details
new retaining wall in backyard. | $8,000 | |
| Jan 11, 2021 | Never finaled issued May 2023, no final | 824 Waller St | Connor Daly Corporation | voluntary strengthening by installing (n) plywood shearwalls in crawlspace, (n) collector elements. no foundation workDetails
voluntary strengthening by installing (n) plywood shearwalls in crawlspace, (n) collector elements. no foundation work | $8,000 |
| Sep 28, 2020 | Completed final sign-off Sep 2023 | 164 Lower Tr | comply w/ #202034491: all work on 2nd & 3rd floor. 3 new skylight, remove wall, demo closet. new wall, new washer/dryer. new heat pump at roof flat rear. separate roof permit required.Details
comply w/ #202034491: all work on 2nd & 3rd floor. 3 new skylight, remove wall, demo closet. new wall, new washer/dryer. new heat pump at roof flat rear. separate roof permit required. | $84,000 | |
| Jun 9, 2020 | Completed final sign-off Jan 2021 | 349 Howth St | Ideal Builders | voluntary strengthening at ground flr per 2016 cebc chapter a3. standard earthquake brace & bolt project participating in the fema brace & bolt program.Details
voluntary strengthening at ground flr per 2016 cebc chapter a3. standard earthquake brace & bolt project participating in the fema brace & bolt program. | $4,050 |
| Feb 27, 2020 | Expired or cancelled cancelled Jan 2026 | 30 Caine Av | voluntary seismic strengthening @ ground floor per 2016 cebc appendix a4Details
voluntary seismic strengthening @ ground floor per 2016 cebc appendix a4 | $8,000 | |
| Nov 20, 2019 | Completed final sign-off Jul 2020 | 25 Castenada Av | Connor Daly Corporation | voluntary strengtheningDetails
voluntary strengthening | $4,000 |
| Feb 27, 2019 | Completed final sign-off Jun 2019 | 1078 Clay St | M J Construction | to comply with vio 201803271 foundation repair & partial replacementDetails
to comply with vio 201803271 foundation repair & partial replacement | $12,000 |
| Oct 18, 2018 | Expired or cancelled cancelled Jan 2026 | 176 Gold Mine Dr | in-kind replacement: repair of (e) 3-level deck.Details
in-kind replacement: repair of (e) 3-level deck. | $12,000 | |
| Aug 28, 2018 | Completed final sign-off Jan 2019 | 103 12th Av | Actually Design Build Inc | (n) wall opening btwn. kitchen & fyr at 4th level. kitchen remodel under pa #201806192293.Details
(n) wall opening btwn. kitchen & fyr at 4th level. kitchen remodel under pa #201806192293. | $5,000 |
| May 25, 2018 | Completed final sign-off Sep 2018 | 590 South Van Ness Av | Sgv Group Construction | voluntary seismic upgrade at gr fl per 2016 cebc appendix a4Details
voluntary seismic upgrade at gr fl per 2016 cebc appendix a4 | $33,000 |
| May 4, 2018 | Completed final sign-off Feb 2022 | 436 Tehama St | Singha Construction Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $38,000 |
| Apr 30, 2018 | Completed final sign-off Dec 2018 | 1083 Union St | Brendan Waters Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $38,000 |
| Mar 27, 2018 | Completed final sign-off Jul 2018 | 74 Beaver St | Goffo Construction Inc | voluntary structural strengthening: (m) shearwalls w/footings, steel beam with post removal.Details
voluntary structural strengthening: (m) shearwalls w/footings, steel beam with post removal. | $32,000 |
| Feb 22, 2018 | Completed final sign-off Apr 2018 | 1170 South Van Ness Av | Brendan Waters Construction Inc | revision to 201709289782. relocate new footing @ grid 7 leftward 3'-0". reduce s.w. length @ grid 7 to 12'-0"Details
revision to 201709289782. relocate new footing @ grid 7 leftward 3'-0". reduce s.w. length @ grid 7 to 12'-0" | |
| Feb 9, 2018 | Completed final sign-off Jun 2018 | 229 Douglass St | Michael E Miranda General Contractor | voluntary strenghtening , anchor 1st fl to foundation with vfp fasteners design is in comromance w/california (e) building code cebc appendix a3Details
voluntary strenghtening , anchor 1st fl to foundation with vfp fasteners design is in comromance w/california (e) building code cebc appendix a3 | $4,000 |
| Dec 8, 2017 | Expired or cancelled expired Jun 2023 | 66 Cumberland St | revision to 201704264942, new retractable skylight, new floor framing at 3rd fl bathrooms, revised bath 1&2 layout, new roof framing at living rm,nw roof deck,nw int. stairs to roof deck. nw water heater, & rpc extg windows w/newDetails
revision to 201704264942, new retractable skylight, new floor framing at 3rd fl bathrooms, revised bath 1&2 layout, new roof framing at living rm,nw roof deck,nw int. stairs to roof deck. nw water heater, & rpc extg windows w/new | $18,000 | |
| Sep 28, 2017 | Completed final sign-off Apr 2018 | 1170 South Van Ness Av | Brendan Waters Construction Inc | voluntary structural strengthening @ ground floor per 2016 cebc appendix a4. (n) plywood shearwalls with (n) fnd. ftgs.Details
voluntary structural strengthening @ ground floor per 2016 cebc appendix a4. (n) plywood shearwalls with (n) fnd. ftgs. | $40,000 |
| Sep 12, 2017 | Completed final sign-off Nov 2018 | 570 Duncan St | mandatory soft story retrofit per sfebc ch 4 d. eng criteria 2016 cebc app a4. n plywood sw with epoxy hd e fdn. n cantilever col system with new footingDetails
mandatory soft story retrofit per sfebc ch 4 d. eng criteria 2016 cebc app a4. n plywood sw with epoxy hd e fdn. n cantilever col system with new footing | $45,000 | |
| Sep 12, 2017 | Completed final sign-off Apr 2020 | 1101 Lake St | mandatory soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4 - ref pa 2005-0201-4478 plywood shearwall w/epoxy h.d. @ (e) fdn. ( residential pa #201709127746). stripe stairs for ada & bath signage work already complete. verify compliance in fieldDetails
mandatory soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4 - ref pa 2005-0201-4478 plywood shearwall w/epoxy h.d. @ (e) fdn. ( residential pa #201709127746). stripe stairs for ada & bath signage work already complete. verify compliance in field | $1,700 | |
| Sep 12, 2017 | Completed final sign-off Apr 2020 | 1101 Lake St | mandatory soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4 - ref pa 2005-0201-4478 plywood shearwall w/epoxy h.d. @ (e) fdn. ( commercial pa #201709127743). work already completed. very compliance in fieldDetails
mandatory soft story retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4 - ref pa 2005-0201-4478 plywood shearwall w/epoxy h.d. @ (e) fdn. ( commercial pa #201709127743). work already completed. very compliance in field | $8,300 | |
| Aug 16, 2017 | Completed final sign-off Jun 2019 | 483 07th Av | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $50,000 | |
| Jul 25, 2017 | Completed final sign-off Jan 2018 | 590 South Van Ness Av | Argueta And Ruano Construction Inc | 3rd floor unit interior remodel: ktichen, bath, bedroom, relocate living room & bedroom, one (n) bath, one (n) bedroom, one (n) playroom. remove & replace interior finishes & doors, remove & replace (e) windows in same openings. mech, elec & plbg struct work as related to remodel. n/a maherDetails
3rd floor unit interior remodel: ktichen, bath, bedroom, relocate living room & bedroom, one (n) bath, one (n) bedroom, one (n) playroom. remove & replace interior finishes & doors, remove & replace (e) windows in same openings. mech, elec & plbg struct work as related to remodel. n/a maher | $55,000 |
| Jul 7, 2017 | Never finaled issued Jun 2018, no final | 652 Clayton St | Bay Pro Property Solutions Inc | conversion of (e) unconditioned 1st floor garage & storage space of a 4 story building into a new conditioned adu per ordinance# 162-16. mep work & structural work related to new unit. adu part of building. seismic upgrade ref pa# 2017/07/07/1198. sprinkler 13rDetails
conversion of (e) unconditioned 1st floor garage & storage space of a 4 story building into a new conditioned adu per ordinance# 162-16. mep work & structural work related to new unit. adu part of building. seismic upgrade ref pa# 2017/07/07/1198. sprinkler 13r | $50,000 |
| Jul 7, 2017 | Completed final sign-off Jul 2019 | 652 Clayton St | Bay Pro Property Solutions Inc | soft story retrofit per sfebc chaper 4d engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chaper 4d engineering criteria 2016 cebc appendix a-4. | $30,000 |
| Jun 15, 2017 | Expired or cancelled cancelled Jan 2026 | 3319 Clay St | install new stairs from 1st floor to 2nd floor & from 2nd floor to roof. install a sliding skylight @ roof. install a redwood roof deck with parapet wall. replace upper unit furnace. n/a maher ordinanceDetails
install new stairs from 1st floor to 2nd floor & from 2nd floor to roof. install a sliding skylight @ roof. install a redwood roof deck with parapet wall. replace upper unit furnace. n/a maher ordinance | $75,500 | |
| Apr 26, 2017 | Completed final sign-off Nov 2018 | 66 Cumberland St | upper unit: interior remodel of (e) to include: kitchen, bathroom, closets, (n) bedroom in (e) space. (n) bathroom in (e) space. (e) bedrooms, mechanical, plumbing & electrical work related to remodel, sptructural work, window replacement.Details
upper unit: interior remodel of (e) to include: kitchen, bathroom, closets, (n) bedroom in (e) space. (n) bathroom in (e) space. (e) bedrooms, mechanical, plumbing & electrical work related to remodel, sptructural work, window replacement. | $150,000 | |
| Jan 6, 2017 | Completed final sign-off Feb 2019 | 2240 North Point St | Brendan Waters Construction Inc | mandatory soft story retrofit iebc a4 new plywood shearwalls @ (e) fdn. new cantilever column systems @ (e) fdn. no welding no additional dwelling unit maher naDetails
mandatory soft story retrofit iebc a4 new plywood shearwalls @ (e) fdn. new cantilever column systems @ (e) fdn. no welding no additional dwelling unit maher na | $85,000 |
| Jan 6, 2017 | Completed final sign-off Jan 2018 | 565 08th Av | Brendan Waters Construction Inc | mandatory soft story retrofit per sfbc chapter 34b, engineering criteria per iebc a4: new plywood shearwalls @ (e) fdn. no welding no additional dwelling unitDetails
mandatory soft story retrofit per sfbc chapter 34b, engineering criteria per iebc a4: new plywood shearwalls @ (e) fdn. no welding no additional dwelling unit | $45,000 |
| Dec 13, 2016 | Expired or cancelled withdrawn Aug 2018 | 2 Carl St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $35,000 | |
| Nov 17, 2016 | Completed final sign-off May 2018 | 495 14th Av | Sgdm Llc | mandatory soft story retrofit iebc a4 new plywood shear walls w/epoxy hold downs into (e) fdn. new cantilever column systems w/new fdn footings. maher naDetails
mandatory soft story retrofit iebc a4 new plywood shear walls w/epoxy hold downs into (e) fdn. new cantilever column systems w/new fdn footings. maher na | $75,000 |
| Oct 13, 2016 | Completed final sign-off Oct 2017 | 99 Fernwood Dr | Quinlan Construction | to comply with nov# 201630691, replacement of urm wallDetails
to comply with nov# 201630691, replacement of urm wall | $20,000 |
| Jun 30, 2016 | Completed final sign-off Mar 2017 | 57 Ashbury St | New Cities Construction | soft story retrofit per sfbc chapter 34b, fema p-807. new plywood shear walls w/apoxy hold-downs into (e) fdn fema p-807 soft story retrofit.Details
soft story retrofit per sfbc chapter 34b, fema p-807. new plywood shear walls w/apoxy hold-downs into (e) fdn fema p-807 soft story retrofit. | $30,000 |
| Apr 8, 2016 | Completed final sign-off Sep 2016 | 1822 20th Av | revision to app#201512094643. wider kitchen opening with new post and footing below. new kitchen opening with new posts below.new s.o.g. to replace extg s.o. gDetails
revision to app#201512094643. wider kitchen opening with new post and footing below. new kitchen opening with new posts below.new s.o.g. to replace extg s.o. g | $8,000 | |
| Apr 8, 2016 | Completed final sign-off May 2017 | 241 Francisco St | Brendan Waters Construction Inc | soft story retrofit per sfbc chapter 34 engineering criteria for fema p-807. new wood frame shear walls with post intalled epoxy based hold-downs.Details
soft story retrofit per sfbc chapter 34 engineering criteria for fema p-807. new wood frame shear walls with post intalled epoxy based hold-downs. | $25,000 |
| Apr 1, 2016 | Completed final sign-off Aug 2016 | 3632 24th St | Brendan Waters Construction Inc | fema p 807 soft story retofit. new wood frame shear walls new footing, replace front stairs in kindDetails
fema p 807 soft story retofit. new wood frame shear walls new footing, replace front stairs in kind | $30,000 |
| May 12, 2015 | Completed final sign-off Dec 2015 | 223 Dolores St | soft story retrofit per sfbc chapter 34b, fema p-807. (6) solid timber shear wall segments with (n) ocntinuous footings & diaphragm work.(work througout common area below all units)Details
soft story retrofit per sfbc chapter 34b, fema p-807. (6) solid timber shear wall segments with (n) ocntinuous footings & diaphragm work.(work througout common area below all units) | $50,000 |