Permit GraphShortlistSan Francisco building permits since 2000

Block 1268, lot 011

2 Carl St

City’s use
Multi-Family Residential
Built
1900
Stories
3
Units
7
Rooms
7 bathrooms
Building
6,000 sq ft
Lot
2,495 sq ft
Zoning
RH3
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

10 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jun 16, 2026Completed
final sign-off Jun 2026
2 Carl StRamirez Roofing Corporationinstall 3 ply modified bitumen roof system over (e) single layer roof membrane. torch down
Details
Permit
202606163263
Status
complete
Filed
Jun 16, 2026
Permit issued
Jun 16, 2026
Final sign-off
Jun 18, 2026
Declared cost
$26,300
Address
2 Carl St

install 3 ply modified bitumen roof system over (e) single layer roof membrane. torch down

Open the permit page

$26,300
Jan 17, 2025Completed
final sign-off Nov 2025
2 Carl StSan Francisco Fire Protectionreplace fire alarm system to comply with sffc 1103.7.6.1 install new fire alarm control panel, as radio, smoke detectors, pull stations, monitor modules, and horn strombes, install lf sounders in all units potential sleeping areas to comply with sffd 1103.7.6.1
Details
Permit
202501178550
Status
complete
Filed
Jan 17, 2025
Permit issued
Jan 17, 2025
Final sign-off
Nov 18, 2025
Declared cost
$10,000
Address
2 Carl St

replace fire alarm system to comply with sffc 1103.7.6.1 install new fire alarm control panel, as radio, smoke detectors, pull stations, monitor modules, and horn strombes, install lf sounders in all units potential sleeping areas to comply with sffd 1103.7.6.1

Open the permit page

$10,000
Jul 27, 2018Completed
final sign-off Dec 2018
2 Carl StBrendan Waters Construction Incmandatory soft story retrofit per sfebc ch 4d engineering criteria: cebc appendix a4
Details
Permit
201807275689
Status
complete
Filed
Jul 27, 2018
Permit issued
Aug 20, 2018
Final sign-off
Dec 5, 2018
Declared cost
$28,000
Address
2 Carl St

mandatory soft story retrofit per sfebc ch 4d engineering criteria: cebc appendix a4

Open the permit page

$28,000
May 8, 2018Never finaled
issued May 2018, no final
2 Carl StBrendan Waters Construction Incexploratory demo. demolition - removal of lath and plaster, drywall and plywood from walls in basement and garage. approx 350 sq ft
Details
Permit
201805088569
Status
issued
Filed
May 8, 2018
Permit issued
May 8, 2018
Declared cost
$2,000
Address
2 Carl St

exploratory demo. demolition - removal of lath and plaster, drywall and plywood from walls in basement and garage. approx 350 sq ft

Open the permit page

$2,000
Dec 13, 2016Expired or cancelled
withdrawn Aug 2018
2 Carl Stsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201612134812
Status
withdrawn
Filed
Dec 13, 2016
Declared cost
$35,000
Address
2 Carl St

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$35,000
Feb 3, 2011Expired or cancelled
expired Dec 2013
6 Carl StHong Bo Hardware Supplyremodel one kitchen and one bathroom. new counter, new cabinets, new floor tile. new shower wall tile non structural remodel.
Details
Permit
201102039583
Status
expired
Filed
Feb 3, 2011
Permit issued
Feb 3, 2011
Declared cost
$18,000
Address
6 Carl St

remodel one kitchen and one bathroom. new counter, new cabinets, new floor tile. new shower wall tile non structural remodel.

Open the permit page

$18,000
Nov 4, 2010Never finaled
issued Nov 2010, no final
2 Carl Ststreet space permit
Details
Permit
M228008
Status
issued
Filed
Nov 4, 2010
Permit issued
Nov 4, 2010
Address
2 Carl St

street space permit

Open the permit page

Jul 27, 2010Never finaled
issued Jul 2010, no final
2 Carl Ststreet space & sidewalk permit
Details
Permit
M213129
Status
issued
Filed
Jul 27, 2010
Permit issued
Jul 27, 2010
Address
2 Carl St

street space & sidewalk permit

Open the permit page

May 27, 2010Completed
final sign-off Aug 2010
2 Carl StHong Bo Hardware Supplychange kitchen cabinets, floor & counter. bathroom tile on floor & wall. work performed at #4 carl street
Details
Permit
201005273388
Status
complete
Filed
May 27, 2010
Permit issued
May 27, 2010
Final sign-off
Aug 9, 2010
Declared cost
$13,000
Address
2 Carl St

change kitchen cabinets, floor & counter. bathroom tile on floor & wall. work performed at #4 carl street

Open the permit page

$13,000
Jul 19, 2006Completed
final sign-off Aug 2006
2 Carl Strepair rotted parts of back stairs to comply with nov dated 7-19-06 less than 50% of structure
Details
Permit
200607197031
Status
complete
Filed
Jul 19, 2006
Permit issued
Jul 19, 2006
Final sign-off
Aug 30, 2006
Declared cost
$600
Address
2 Carl St

repair rotted parts of back stairs to comply with nov dated 7-19-06 less than 50% of structure

Open the permit page

$600

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Brendan Waters Construction Inc (2), Hong Bo Hardware Supply (2), Ramirez Roofing Corporation, San Francisco Fire Protection
Engineers
Mike P Abell

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.