Block 1268, lot 011
2 Carl St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 7
- Rooms
- 7 bathrooms
- Building
- 6,000 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 16, 2026 | Completed final sign-off Jun 2026 | 2 Carl St | Ramirez Roofing Corporation | install 3 ply modified bitumen roof system over (e) single layer roof membrane. torch downDetails
install 3 ply modified bitumen roof system over (e) single layer roof membrane. torch down | $26,300 |
| Jan 17, 2025 | Completed final sign-off Nov 2025 | 2 Carl St | San Francisco Fire Protection | replace fire alarm system to comply with sffc 1103.7.6.1 install new fire alarm control panel, as radio, smoke detectors, pull stations, monitor modules, and horn strombes, install lf sounders in all units potential sleeping areas to comply with sffd 1103.7.6.1Details
replace fire alarm system to comply with sffc 1103.7.6.1 install new fire alarm control panel, as radio, smoke detectors, pull stations, monitor modules, and horn strombes, install lf sounders in all units potential sleeping areas to comply with sffd 1103.7.6.1 | $10,000 |
| Jul 27, 2018 | Completed final sign-off Dec 2018 | 2 Carl St | Brendan Waters Construction Inc | mandatory soft story retrofit per sfebc ch 4d engineering criteria: cebc appendix a4Details
mandatory soft story retrofit per sfebc ch 4d engineering criteria: cebc appendix a4 | $28,000 |
| May 8, 2018 | Never finaled issued May 2018, no final | 2 Carl St | Brendan Waters Construction Inc | exploratory demo. demolition - removal of lath and plaster, drywall and plywood from walls in basement and garage. approx 350 sq ftDetails
exploratory demo. demolition - removal of lath and plaster, drywall and plywood from walls in basement and garage. approx 350 sq ft | $2,000 |
| Dec 13, 2016 | Expired or cancelled withdrawn Aug 2018 | 2 Carl St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $35,000 | |
| Feb 3, 2011 | Expired or cancelled expired Dec 2013 | 6 Carl St | Hong Bo Hardware Supply | remodel one kitchen and one bathroom. new counter, new cabinets, new floor tile. new shower wall tile non structural remodel.Details
remodel one kitchen and one bathroom. new counter, new cabinets, new floor tile. new shower wall tile non structural remodel. | $18,000 |
| Nov 4, 2010 | Never finaled issued Nov 2010, no final | 2 Carl St | street space permitDetails
street space permit | ||
| Jul 27, 2010 | Never finaled issued Jul 2010, no final | 2 Carl St | street space & sidewalk permitDetails
street space & sidewalk permit | ||
| May 27, 2010 | Completed final sign-off Aug 2010 | 2 Carl St | Hong Bo Hardware Supply | change kitchen cabinets, floor & counter. bathroom tile on floor & wall. work performed at #4 carl streetDetails
change kitchen cabinets, floor & counter. bathroom tile on floor & wall. work performed at #4 carl street | $13,000 |
| Jul 19, 2006 | Completed final sign-off Aug 2006 | 2 Carl St | repair rotted parts of back stairs to comply with nov dated 7-19-06 less than 50% of structureDetails
repair rotted parts of back stairs to comply with nov dated 7-19-06 less than 50% of structure | $600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brendan Waters Construction Inc (2), Hong Bo Hardware Supply (2), Ramirez Roofing Corporation, San Francisco Fire Protection
- Engineers
- Mike P Abell
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.