Guanghong Ou
- License
- C40325
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- On San Francisco permits
- Jun 2024 to Nov 2026
3 permits since 2000 (architect on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Arris Build Group, Inc. (2)
- Engineers
- Mike P Abell (2)
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 1
- Commercial 1
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 17, 2026 | In progress issued Nov 2026 | 3424 Noriega St | (e)bathroom and kitchen remodel. in-kind replacement of (e)equipment. fixture and millwork. elect and plumbing work limited to fiting new fixtures and alignment of outlets. level2: bathroom (e) bathtub, toilet, lavatory and tile wall/flr to be removed. new tiled standing shower, new toilet, newDetails
(e)bathroom and kitchen remodel. in-kind replacement of (e)equipment. fixture and millwork. elect and plumbing work limited to fiting new fixtures and alignment of outlets. level2: bathroom (e) bathtub, toilet, lavatory and tile wall/flr to be removed. new tiled standing shower, new toilet, new | $10,000 | |
| Jun 24, 2024 | Completed final sign-off May 2025 | 1476 California St | Arris Build Group, Inc. | residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.Details
residential - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards. | $75,000 |
| Jun 24, 2024 | Completed final sign-off Jun 2025 | 1490 California St | Arris Build Group, Inc. | commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards.Details
commecial - soft story retrofit per sfebc chapter 45 engineering criteria 2022 cebs appendix a-4. to comply with nov 202301466. excavate less than 5 cubic yards. | $15,000 |