Michael Del Gatto
- License
- C29829
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Gensler
- Based in
- Las Vegas
- On San Francisco permits
- Oct 2005 to Feb 2017
4 permits since 2000 (architect on 4 permits): 2 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Clune Construction Company L P, Hathaway Dinwiddie Co., Skyline Construction
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2017 | Never finaled issued Feb 2017, no final | 3 Embarcadero Center | Clune Construction Company L P | 24th floor - revision to pa 2016-1221-5548 sheet a201. changing of assigned room numbers.Details
24th floor - revision to pa 2016-1221-5548 sheet a201. changing of assigned room numbers. | |
| Jul 17, 2008 | Completed final sign-off Mar 2009 | 1 Front St | Skyline Construction | revised to appl. #2008.07.17.7003. occupancy load of individual rooms does not exceed fifty. no panic hardware is required per cbc 2007 sec 1008.1.9. occupancy load at exit used for purposes of determining exit width.Details
revised to appl. #2008.07.17.7003. occupancy load of individual rooms does not exceed fifty. no panic hardware is required per cbc 2007 sec 1008.1.9. occupancy load at exit used for purposes of determining exit width. | |
| Feb 21, 2008 | Completed final sign-off Mar 2009 | 1 Front St | ti for 1st and 2nd floor. construct new non-bearing partition walls, new ceiling system, new lighting fixtures, new electrical /tel-data outlets and new finishes. fire safety work to be under separate permit.Details
ti for 1st and 2nd floor. construct new non-bearing partition walls, new ceiling system, new lighting fixtures, new electrical /tel-data outlets and new finishes. fire safety work to be under separate permit. | $780,000 | |
| Oct 4, 2005 | Expired or cancelled expired Feb 2007 | 210 King St | Hathaway Dinwiddie Co. | ground floor lobby renovation. also remodeling front door & revised van parking handicapped accessible space.Details
ground floor lobby renovation. also remodeling front door & revised van parking handicapped accessible space. | $200,000 |