Karin Payson
- Listed as
- architect, authorized agent-others, designer
- Firm
- Karin Payson Arch. & Design
- Based in
- San Francisco
- On San Francisco permits
- Oct 2002 to Mar 2026
66 permits since 2000 (architect on 62 permits, authorized agent-others on 2 permits, designer on 2 permits): 34 completed, 3 in progress, 14 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 23, 2026 | In progress filed Mar 2026, not yet issued | 2245 Post St | Cahill Contractors Llc. | to erect 4 stories, 1 basement, type ii-a, philanthoropic facility.Details
to erect 4 stories, 1 basement, type ii-a, philanthoropic facility. | $41,000,000 |
| Aug 20, 2025 | In progress issued Nov 2025 | 1640 Scott St | Vc & Kw Builders | build new elevator pit & hoistway for a machine roomless, gurney-size service elevator (by others). to accomodate the elevator, demolish & rebuild general restroom & accessible guest room/bathroom @ 1st floor. remove 1 guest room/bathroom & replace with office/lounge room @ 2nd floor & removeDetails
build new elevator pit & hoistway for a machine roomless, gurney-size service elevator (by others). to accomodate the elevator, demolish & rebuild general restroom & accessible guest room/bathroom @ 1st floor. remove 1 guest room/bathroom & replace with office/lounge room @ 2nd floor & remove | $850,000 |
| Apr 24, 2025 | Expired or cancelled cancelled May 2025 | 1640 Scott St | Vc & Kw Builders | build new elevator pit and hoistway for a machine roomless, gurney style service elevator (by others) to access three stories abive grade with control at 3rd fl to accomodate the elevator demolish and rebuild general restroom and accessible guest room/bathroom.Details
build new elevator pit and hoistway for a machine roomless, gurney style service elevator (by others) to access three stories abive grade with control at 3rd fl to accomodate the elevator demolish and rebuild general restroom and accessible guest room/bathroom. | $850,000 |
| Feb 12, 2025 | In progress filed Feb 2025, not yet issued | 1710 Scott St | install steel security gate at main entrance. replace (2) exterior lights, add (6) exterior lightsDetails
install steel security gate at main entrance. replace (2) exterior lights, add (6) exterior lights | $85,000 | |
| Mar 5, 2024 | Completed final sign-off Feb 2025 | 1640 Scott St | Cannon General Contracting Inc | removal of steel trellises on the second and third floorDetails
removal of steel trellises on the second and third floor | $8,000 |
| Aug 24, 2023 | Completed final sign-off Jan 2024 | 67 Pond St | Andrew Gallagher Construction | interior remodel of bathroom and bedroom, upper unit only (1 story)Details
interior remodel of bathroom and bedroom, upper unit only (1 story) | $39,500 |
| Oct 20, 2022 | Expired or cancelled expired Feb 2026 | 520 Chestnut St | Andrew Chekene Enterprises/ Dba Ac Enter, Connemara Fine Trim Inc Dba Highland Bui | #401: (5) window replacements at same location and size. u=0.30 maxDetails
#401: (5) window replacements at same location and size. u=0.30 max | $30,000 |
| May 26, 2022 | Never finaled issued Jul 2022, no final | 1640 Scott St | cosmetic repairs to an existing 3 story guest house (former ronald mcdonald house) same use under a new owner. (n) windows & exterior doors @ (e) locations.Details
cosmetic repairs to an existing 3 story guest house (former ronald mcdonald house) same use under a new owner. (n) windows & exterior doors @ (e) locations. | $300,000 | |
| Apr 27, 2022 | Expired or cancelled withdrawn Jun 2022 | 2245 Post St | remodel of two story commercial bldg to include mech and structural upgrades. expansion of 2/f where there is now a roof and deck over the 1/f, rebuilt a smaller deck remaining roof.Details
remodel of two story commercial bldg to include mech and structural upgrades. expansion of 2/f where there is now a roof and deck over the 1/f, rebuilt a smaller deck remaining roof. | $2,000,000 | |
| Mar 22, 2022 | Completed final sign-off Oct 2024 | 38 Samoset St | J..H. Construction Co./John A Huerta Co | lower bedroom addition under (e) living room. kitchen & bathroom remodel. modification of (e) deck. (n) windows & doors.Details
lower bedroom addition under (e) living room. kitchen & bathroom remodel. modification of (e) deck. (n) windows & doors. | $400,000 |
| Mar 17, 2022 | Completed final sign-off Nov 2022 | 612 Howard St | J..H. Construction Co./John A Huerta Co | replace (e) door at 612 howard st (entry door).Details
replace (e) door at 612 howard st (entry door). | $10,000 |
| Sep 22, 2021 | Expired or cancelled withdrawn Jan 2022 | 1640 Scott St | remodel (e) 3-story guest house (formerly ronald mcdonald house) w/ code compliance & upgrades. same use. (n) 3-stop elevator, 2 (n) accessible restrooms, replace windows & doors, remove decorative metal pergolas at facade, remodel guest rms- 8 rms converted to 6. add ada bathrmDetails
remodel (e) 3-story guest house (formerly ronald mcdonald house) w/ code compliance & upgrades. same use. (n) 3-stop elevator, 2 (n) accessible restrooms, replace windows & doors, remove decorative metal pergolas at facade, remodel guest rms- 8 rms converted to 6. add ada bathrm | $3,000,000 | |
| Apr 30, 2021 | Completed final sign-off Apr 2022 | 155 Mayfair Dr | Connor Daly Corporation | existing unit built in 2008, no records of permitting. we are submitting documentation for legalization. unit is 811 sq approx with: 1 bedroom, 1 full bathroom, 1 kitchen, independent access from street. one of the existing windows needs to be altered to comply with cbc 1030Details
existing unit built in 2008, no records of permitting. we are submitting documentation for legalization. unit is 811 sq approx with: 1 bedroom, 1 full bathroom, 1 kitchen, independent access from street. one of the existing windows needs to be altered to comply with cbc 1030 | $120,000 |
| Apr 23, 2021 | Completed final sign-off Apr 2022 | 155 Mayfair Dr | Connor Daly Corporation | lower level (n) bedroom, (n) bathroom, replace (e) garage door w/(n) man door, remove and replace (e) windows as noted for code compliance cbc103/main level, remodel (e) bathroom to add shower, (n) door at room 3, demo (e) wall as notedDetails
lower level (n) bedroom, (n) bathroom, replace (e) garage door w/(n) man door, remove and replace (e) windows as noted for code compliance cbc103/main level, remodel (e) bathroom to add shower, (n) door at room 3, demo (e) wall as noted | $75,000 |
| Nov 24, 2020 | Completed final sign-off Jun 2021 | 612 Howard St | Principal Builders Inc. | suite 300. tenant improvements incl (n) meeting room w/ (n) doors, change in lighting layout.Details
suite 300. tenant improvements incl (n) meeting room w/ (n) doors, change in lighting layout. | $80,000 |
| Nov 24, 2020 | Completed final sign-off Nov 2022 | 612 Howard St | J..H. Construction Co./John A Huerta Co | lobby: remove and replace floor finishes. replace (e) lighting and add (n) lighting. replace (e) door at suite 100. (n) wall finishes, paint throughout.Details
lobby: remove and replace floor finishes. replace (e) lighting and add (n) lighting. replace (e) door at suite 100. (n) wall finishes, paint throughout. | $18,000 |
| Sep 24, 2020 | Never finaled issued Apr 2021, no final | 780 Elizabeth St | Prospect Construction Inc, Finbarr Collins Construction Inc. | (n) roof deck w/ handrail. (n) stairs to meet roof deck. (n) water tampered outlet and plubming for a hose bib at roof deck.Details
(n) roof deck w/ handrail. (n) stairs to meet roof deck. (n) water tampered outlet and plubming for a hose bib at roof deck. | $25,000 |
| Aug 31, 2020 | Never finaled issued Sep 2020, no final | 612 Howard St | J..H. Construction Co./John A Huerta Co | suite 300: t.i. revisiion to pa#201904258898; / additional phone roomsDetails
suite 300: t.i. revisiion to pa#201904258898; / additional phone rooms | $12,000 |
| Jun 30, 2020 | Completed final sign-off Nov 2021 | 612 Howard St | J..H. Construction Co./John A Huerta Co | ti (n) toilets, (n) fixtures & (n) finishes, (n) lighting @ (e) j boxes. sand & patch (e) wood floorDetails
ti (n) toilets, (n) fixtures & (n) finishes, (n) lighting @ (e) j boxes. sand & patch (e) wood floor | $195,000 |
| Sep 5, 2019 | Expired or cancelled expired Sep 2022 | 2331 19th St | Northpoint Builders | residential remodel - revision to pa 2014-0522-6466. basement - add vestibule & closet, convert (e) storage room to a bedroom by adding (n) venting window; 1st fl - kitchen remodel, (n) powder room and a (n) window @ dining room; 2nd fl - fixed window replaced w/operable awning windowDetails
residential remodel - revision to pa 2014-0522-6466. basement - add vestibule & closet, convert (e) storage room to a bedroom by adding (n) venting window; 1st fl - kitchen remodel, (n) powder room and a (n) window @ dining room; 2nd fl - fixed window replaced w/operable awning window | $45,000 |
| Aug 15, 2019 | Completed final sign-off Aug 2023 | 246 Eureka St | Edgewood Builders Inc | lower level: relocate laundry-add(n)bath, rebuild(e)stair. excavate lightwell,(n)rear bedrm behind garage. 1st fl: demo/relocate powder rm. relocate kitchen, demo(e)breakfast rm, add(n)family rm. 2nd fl: remodel (e)front bedrm. re-organize rear bedrm w/ horizontal addition.add bath,(n) stair to 3rdDetails
lower level: relocate laundry-add(n)bath, rebuild(e)stair. excavate lightwell,(n)rear bedrm behind garage. 1st fl: demo/relocate powder rm. relocate kitchen, demo(e)breakfast rm, add(n)family rm. 2nd fl: remodel (e)front bedrm. re-organize rear bedrm w/ horizontal addition.add bath,(n) stair to 3rd | $1,200,000 |
| Jul 18, 2019 | Completed final sign-off Nov 2021 | 612 Howard St | J..H. Construction Co./John A Huerta Co | ti - (n) restrooms, remodel offices & corridor; (n) server room, re-lamp (e) lighting scheme using (e) j-boxes; replace (e) in-suite hvac as necessary; paint, repair & re-coat (e) floor; paint throughoutDetails
ti - (n) restrooms, remodel offices & corridor; (n) server room, re-lamp (e) lighting scheme using (e) j-boxes; replace (e) in-suite hvac as necessary; paint, repair & re-coat (e) floor; paint throughout | $195,000 |
| Apr 25, 2019 | Never finaled issued May 2019, no final | 612 Howard St | J..H. Construction Co./John A Huerta Co | third floor tenant improvement: eliminate corridor (n) bathrooms, (n) lighting, (n) non-structural partitions, paint. (n) elevator panel upgrade, (n) entry (bldg) threshold. maher n/a.Details
third floor tenant improvement: eliminate corridor (n) bathrooms, (n) lighting, (n) non-structural partitions, paint. (n) elevator panel upgrade, (n) entry (bldg) threshold. maher n/a. | $90,000 |
| Jan 28, 2019 | Never finaled issued Dec 2019, no final | 780 Elizabeth St | Finbarr Collins Construction Inc., Excel Site Services Inc | interior remodel: structural upgrade, (n) doors & windows back of house, remodel interior stairs, increase habitable space @ basement, expansion habitable space roof line 2/3 back of house. legalize ground floor unit.Details
interior remodel: structural upgrade, (n) doors & windows back of house, remodel interior stairs, increase habitable space @ basement, expansion habitable space roof line 2/3 back of house. legalize ground floor unit. | $800,000 |
| Jul 31, 2018 | Completed final sign-off Feb 2021 | 1700 Broadway | J..H. Construction Co./John A Huerta Co | unit 605 - new bay window & framing at location of existing. new skylight. new windows at bay windowDetails
unit 605 - new bay window & framing at location of existing. new skylight. new windows at bay window | $30,000 |
| Jan 12, 2018 | Completed final sign-off Jan 2019 | 630 Wawona St | Jln Builders | enclosure of lightwell infill along the east facade to enlarge an existing bathroom, main level. ref bpa#201702028508Details
enclosure of lightwell infill along the east facade to enlarge an existing bathroom, main level. ref bpa#201702028508 | $2,500 |
| Sep 19, 2017 | Completed final sign-off Aug 2018 | 61 Sharon St | Connemara Fine Trim Inc Dba Highland Bui | 2nd fl: new bathroom: existing office spaace to be remodeled into a bathroom with toilet, vanity, & shower. re-sheetrock, tile, plumbing & electrical.Details
2nd fl: new bathroom: existing office spaace to be remodeled into a bathroom with toilet, vanity, & shower. re-sheetrock, tile, plumbing & electrical. | $45,000 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 1700 Broadway | commencement of work not started under prev approved permit 201508285502Details
commencement of work not started under prev approved permit 201508285502 | $100,000 | |
| Jun 28, 2017 | Never finaled issued Oct 2018, no final | 1710 Scott St | replace 2 pairs (e)windows&adj portions wall w/2(n) recessed windows; replace handrails; add (n)window facing (e)recessed entry vesitbule windows sutter st. add/expand (17'-10"x9'-5") for (n)conference rm; replace (e) fence/gate with (n). interior=reconfiguration of reception/waiting area.Details
replace 2 pairs (e)windows&adj portions wall w/2(n) recessed windows; replace handrails; add (n)window facing (e)recessed entry vesitbule windows sutter st. add/expand (17'-10"x9'-5") for (n)conference rm; replace (e) fence/gate with (n). interior=reconfiguration of reception/waiting area. | $150,000 | |
| Mar 15, 2017 | Never finaled issued Apr 2018, no final | 2030 Scott St | basement: converting partially to habitable space & lowering (e) garage level by approx 2'-0". 1st level: remodeling kitchen & replacing glass conservatory structure w/ frame structure to include (n) roof deck.Details
basement: converting partially to habitable space & lowering (e) garage level by approx 2'-0". 1st level: remodeling kitchen & replacing glass conservatory structure w/ frame structure to include (n) roof deck. | $400,000 | |
| Feb 2, 2017 | Completed final sign-off Dec 2018 | 630 Wawona St | Jln Builders | lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof.Details
lower level: remodel & upgrade of bedroom, reconfigure foyer & enclosure of (e) open stairwell. main level: reconfigure kitchen, powder room, office, bathroom & (2) bedrooms. upper level: demo (e) stair & build (n) stair, remodel master suite & bathroom, demo (e) roof to replace w/ (n) roof. | $600,000 |
| Nov 3, 2016 | Expired or cancelled cancelled Jan 2026 | 4302 19th St | Edgewood Builders Inc | remodel of bathroom and new lighting fixture in master bedroom.Details
remodel of bathroom and new lighting fixture in master bedroom. | $20,000 |
| Sep 1, 2016 | Completed final sign-off Dec 2018 | 31 Miramar Av | Essa's Remodeling | revision to pa 2014-1203-2911 (s1) - lower level: no expansion. re-arrange bathroom fixture location, add skylight @ new master bedroomDetails
revision to pa 2014-1203-2911 (s1) - lower level: no expansion. re-arrange bathroom fixture location, add skylight @ new master bedroom | $50,000 |
| Apr 21, 2016 | Completed final sign-off Apr 2017 | 1271 Stanyan St | A L Martin Construction | front elevation facing stanyan st - installing new hardie plank siding and window replacement with new larger windows. south elevation - adding new canopy at doorway and replace (e) window with (n) larger windowDetails
front elevation facing stanyan st - installing new hardie plank siding and window replacement with new larger windows. south elevation - adding new canopy at doorway and replace (e) window with (n) larger window | $80,000 |
| Mar 29, 2016 | Completed final sign-off Apr 2017 | 1271 Stanyan St | A L Martin Construction | residential remodel, main level, relocate powder room, expand kitchen area and remodel upper level. remodel/reconfigure master bath and closet. remodel bath. remodel garden shed at rear, 92 sfDetails
residential remodel, main level, relocate powder room, expand kitchen area and remodel upper level. remodel/reconfigure master bath and closet. remodel bath. remodel garden shed at rear, 92 sf | $200,000 |
| Feb 29, 2016 | Never finaled issued Apr 2016, no final | 372 Douglass St | residential interior remodel - upper level: reconfiguration of master nathroom, closet and nook. main levell reconfiguration of 2nd bathroomDetails
residential interior remodel - upper level: reconfiguration of master nathroom, closet and nook. main levell reconfiguration of 2nd bathroom | $150,000 | |
| Aug 28, 2015 | Completed final sign-off Feb 2021 | 1700 Broadway | ste #605, 6th flr: remodel (e) apartment; remove (e) kitchen cabinetry,countertop & sink & replace them; remove (e) bathrm fixtures & tiles and replace them; remove (e) windows and replace them ( true - divided mullion pattern); maher n/a. convert fireplace to direct vent; add skylightDetails
ste #605, 6th flr: remodel (e) apartment; remove (e) kitchen cabinetry,countertop & sink & replace them; remove (e) bathrm fixtures & tiles and replace them; remove (e) windows and replace them ( true - divided mullion pattern); maher n/a. convert fireplace to direct vent; add skylight | $100,000 | |
| Aug 26, 2015 | Completed final sign-off Sep 2016 | 4300 19th St | Edgewood Builders Inc | remodel (e) garage; upgrade structure for (n) roof deck. access from adjacent (attached) condo (4300 19th st). open railings and trellis not to exceed 42".Details
remodel (e) garage; upgrade structure for (n) roof deck. access from adjacent (attached) condo (4300 19th st). open railings and trellis not to exceed 42". | $87,000 |
| Jul 30, 2015 | Completed final sign-off Apr 2016 | 4300 19th St | remodel one bath and one kitchen and one bathroom. remodel closet.Details
remodel one bath and one kitchen and one bathroom. remodel closet. | $130,000 | |
| Feb 5, 2015 | Expired or cancelled withdrawn Mar 2017 | 1710 Scott St | front elevation facing scott st. replace 2 pairs of e windows and small portion of adjacent wal with 2 new recessed windows, replace handrail add new window facign the recessed entry vestibule. replace e window tih new door to access e garden. replace e fence with new fenceDetails
front elevation facing scott st. replace 2 pairs of e windows and small portion of adjacent wal with 2 new recessed windows, replace handrail add new window facign the recessed entry vestibule. replace e window tih new door to access e garden. replace e fence with new fence | $50,000 | |
| Jan 23, 2015 | Completed final sign-off Apr 2015 | 1935 Franklin St | Brady Construction | new laundry facilities and bicycle storage on ground floor. n/a ordinance #155-13Details
new laundry facilities and bicycle storage on ground floor. n/a ordinance #155-13 | $47,000 |
| Dec 9, 2014 | Completed final sign-off Nov 2019 | 276 Ripley St | Northpoint Builders | remodel of (e) single family dwelling & addition @ rear w/ 1-kitchen & 2 1/2-bathroom (existing 1 1/2-bathrooms)Details
remodel of (e) single family dwelling & addition @ rear w/ 1-kitchen & 2 1/2-bathroom (existing 1 1/2-bathrooms) | $350,000 |
| Dec 3, 2014 | Never finaled issued Jun 2015, no final | 31 Miramar Av | res'd remodel & rear addition. main level: expand the rear by 6'-0" to add a breakfast area and a deck. lowel level: expand by 6'-0". lower (e) slab by 2'-0" on the rear. reconfigure (e) bedrooms/layout & bathroom, relocate mechanical rm. rebuild (e) stair.Details
res'd remodel & rear addition. main level: expand the rear by 6'-0" to add a breakfast area and a deck. lowel level: expand by 6'-0". lower (e) slab by 2'-0" on the rear. reconfigure (e) bedrooms/layout & bathroom, relocate mechanical rm. rebuild (e) stair. | $115,000 | |
| Jun 23, 2014 | Never finaled issued Jun 2014, no final | 4719 18th St | Northpoint Builders | interior kitchen and bathroom remodel (residential); partially reconfigure some walls and closets; replace fixtures and cabinets, all interior workDetails
interior kitchen and bathroom remodel (residential); partially reconfigure some walls and closets; replace fixtures and cabinets, all interior work | $25,000 |
| May 22, 2014 | Expired or cancelled expired Sep 2022 | 2331 19th St | Northpoint Builders, Sage Building Company | res'd remodel. 1st fl: new stair & reconfigure closets. proposed 2nd fl at the rear: a master bedroom with a closet, a bathroom and a deck.Details
res'd remodel. 1st fl: new stair & reconfigure closets. proposed 2nd fl at the rear: a master bedroom with a closet, a bathroom and a deck. | $200,000 |
| Apr 29, 2014 | Completed final sign-off Dec 2015 | 83 Springfield Dr | horizontal addition: lower level-conversion of family room into bedroom, addition of new family room. relocate (e) stairs. new stairs from family room and from garage to kitchen. upper level-expand master bedroom.Details
horizontal addition: lower level-conversion of family room into bedroom, addition of new family room. relocate (e) stairs. new stairs from family room and from garage to kitchen. upper level-expand master bedroom. | $100,000 | |
| Mar 14, 2014 | Completed final sign-off Nov 2016 | 1188 Noe St | Northpoint Builders | horizontal & vertical extension.1/fl-rear expansion convert kitchen,bedroom&office into a grt room w/kitchen,sitting&dinning areas.frt area remains as is.(n)2/fl-a stairway leads to 2 bedrooms(frt),a bathrm,laundry closet& a mstr bedrm(back) w/ bath, closet and a small back deck.Details
horizontal & vertical extension.1/fl-rear expansion convert kitchen,bedroom&office into a grt room w/kitchen,sitting&dinning areas.frt area remains as is.(n)2/fl-a stairway leads to 2 bedrooms(frt),a bathrm,laundry closet& a mstr bedrm(back) w/ bath, closet and a small back deck. | $600,000 |
| Jun 13, 2013 | Completed final sign-off Nov 2016 | 146 Joost Av | J..H. Construction Co./John A Huerta Co | remodel & expand 1st floor: kitchen remodel, new interior courtyard, bedroom & bathroom, new partial 2nd floor on rear-facing side (not visible from street) with new master bedroom, bathroom & walk in closet & a small deck.Details
remodel & expand 1st floor: kitchen remodel, new interior courtyard, bedroom & bathroom, new partial 2nd floor on rear-facing side (not visible from street) with new master bedroom, bathroom & walk in closet & a small deck. | $190,575 |
| Mar 8, 2013 | Completed final sign-off Oct 2013 | 248 Utah St | J..H. Construction Co./John A Huerta Co | tenant improvements, partitions, restroom and pantry upgrade, replace extg exterior doors. mechanical permit.Details
tenant improvements, partitions, restroom and pantry upgrade, replace extg exterior doors. mechanical permit. | $105,000 |
| Dec 22, 2011 | Completed final sign-off May 2013 | 1121 Alabama St | Northpoint Builders | residential remodel. 3'-2" horizontal addition @ rear w/new deck & stair to rear yard. relocate interior stair to second story unit. remodel bathrooms & kitchens in upper & lower units.Details
residential remodel. 3'-2" horizontal addition @ rear w/new deck & stair to rear yard. relocate interior stair to second story unit. remodel bathrooms & kitchens in upper & lower units. | $250,000 |
| Nov 4, 2011 | Never finaled issued Mar 2012, no final | 28 Montcalm St | Northpoint Builders, J..H. Construction Co./John A Huerta Co | supplemental to work under permit#201106228702. horizontal extension @ ground floor with (n) first floor deck above. (n) stair & deck to rear yard.Details
supplemental to work under permit#201106228702. horizontal extension @ ground floor with (n) first floor deck above. (n) stair & deck to rear yard. | $15,000 |
| Oct 14, 2011 | Expired or cancelled cancelled Sep 2020 | 2146 Mission St | J..H. Construction Co./John A Huerta Co | convert retail grocery store to full service restaurant. change of use. construct new kitchen, dining araa & ada compliant restrooms.Details
convert retail grocery store to full service restaurant. change of use. construct new kitchen, dining araa & ada compliant restrooms. | $110,000 |
| Sep 20, 2011 | Expired or cancelled expired Apr 2018 | 383 27th St | 4th story addition. minor additions @ 2nd & 3rd floors. extension to existing deck. sprinkler system & monitoring systems under separate applications.Details
4th story addition. minor additions @ 2nd & 3rd floors. extension to existing deck. sprinkler system & monitoring systems under separate applications. | $350,000 | |
| Aug 10, 2011 | Completed final sign-off Jan 2013 | 2416 Gough St | remove interior service stair from 1st to 2nd fl and (e) forced air hvac system, replace w/ new hydronic heating system. remodel 2 bathrooms & 1 powder room, & kitchen. add two new dormers on 3rd fl. minor elec. and lighting work to be performed in ref. to above work.Details
remove interior service stair from 1st to 2nd fl and (e) forced air hvac system, replace w/ new hydronic heating system. remodel 2 bathrooms & 1 powder room, & kitchen. add two new dormers on 3rd fl. minor elec. and lighting work to be performed in ref. to above work. | $130,000 | |
| Jun 22, 2011 | Completed final sign-off May 2013 | 28 Montcalm St | Northpoint Builders | remove & replace (e) windows. remove & replace rear portion of 1st fl. add dormer on 2nd fl. new rear addition on ground level & new deck & stair to rear yard. foundation & framing under seperate permit.Details
remove & replace (e) windows. remove & replace rear portion of 1st fl. add dormer on 2nd fl. new rear addition on ground level & new deck & stair to rear yard. foundation & framing under seperate permit. | $100,000 |
| Oct 25, 2010 | Completed final sign-off Oct 2011 | 105 Bache St | remodeled kitchen, no load bearing members affected, no change to bldg envelope. in basement, replace existing door and change existing window to a new doorDetails
remodeled kitchen, no load bearing members affected, no change to bldg envelope. in basement, replace existing door and change existing window to a new door | $40,000 | |
| Oct 1, 2008 | Completed final sign-off Mar 2009 | 2555 Leavenworth St | E & J General Building Contractor Co | #107 - replace full height window w/ sliding door, remove existing wall furring, replace window, extend wall & enclose closet w/ door, add new lighting, relocate strip heater.Details
#107 - replace full height window w/ sliding door, remove existing wall furring, replace window, extend wall & enclose closet w/ door, add new lighting, relocate strip heater. | $22,000 |
| Jan 8, 2008 | Never finaled issued Jan 2008, no final | 980 Corbett Av | J..H. Construction Co./John A Huerta Co | revision to original p/a #2005.08.11.0076. (n) windows @ third level to change to sliding doors. this changes the roof to a roof deck.Details
revision to original p/a #2005.08.11.0076. (n) windows @ third level to change to sliding doors. this changes the roof to a roof deck. | $3,000 |
| May 23, 2007 | Expired or cancelled cancelled Jan 2008 | 335 Jones St | facade repair & store front @ 335 jones only. no structural work. sprinkler work under separate permit and ti work under separate permitDetails
facade repair & store front @ 335 jones only. no structural work. sprinkler work under separate permit and ti work under separate permit | $18,000 | |
| Feb 2, 2006 | Expired or cancelled expired Dec 2017 | 308 Seacliff Av | construct 5' - 1 1/2" tall stucco faced wall along street edge of property with (2) metal gatesDetails
construct 5' - 1 1/2" tall stucco faced wall along street edge of property with (2) metal gates | $10,000 | |
| Dec 13, 2005 | Never finaled issued Dec 2005, no final | 765 Monterey Bl | replace (e) door @ street front w/a wood window.Details
replace (e) door @ street front w/a wood window. | $2,000 | |
| Jun 22, 2005 | Completed final sign-off Oct 2007 | 24 Hill St | reconfiguration of interior space, demo 2 rooms at rear of bldg, relocation of some windows, add exterior staircase to 1st foor, add balcony at rear of bldg.Details
reconfiguration of interior space, demo 2 rooms at rear of bldg, relocation of some windows, add exterior staircase to 1st foor, add balcony at rear of bldg. | $150,000 | |
| Jun 22, 2005 | Completed final sign-off Oct 2007 | 523 16th Av | horizontal addition- rear addition at ground & first floor; roof deck over (n) addition. remodel 1stDetails
horizontal addition- rear addition at ground & first floor; roof deck over (n) addition. remodel 1st | $350,000 | |
| Feb 11, 2005 | Expired or cancelled expired Feb 2007 | 300 Seacliff Av | Plath & Company Inc | demo of an exist sunroom & its replacement w/a new structure in the same envelope,Details
demo of an exist sunroom & its replacement w/a new structure in the same envelope, | $100,000 |
| Oct 19, 2004 | Expired or cancelled expired Jan 2007 | 2682 Broadway | James Gallagher Construction | toilet room and mechanical room added on basement level revision to permit #200305285651Details
toilet room and mechanical room added on basement level revision to permit #200305285651 | $15,000 |
| Oct 17, 2002 | Expired or cancelled expired Jan 2007 | 283 Jersey St | expand (e) garage. add dormer. add one bath. remodel one bath. repair (e) 2nd fl. deck. add windscreDetails
expand (e) garage. add dormer. add one bath. remodel one bath. repair (e) 2nd fl. deck. add windscre | $150,000 |