Manouchehr Ghanbari
- Listed as
- architect, engineer
- Firm
- T W Tuffwall, Inc.
- Based in
- Orinda
- On San Francisco permits
- Nov 2012 to Jul 2026
12 permits since 2000 (engineer on 8 permits, architect on 4 permits): 8 completed, 1 in progress, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 29, 2026 | In progress filed Jul 2026, not yet issued | 100 Stockton St | 1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing.Details
1st and 3rd floor - tenant improvement at ground and 3rd floors including demo and construction of interior partitions and doors, electrical, hvac and plumbing. | $14,150,000 | |
| Apr 2, 2021 | Completed final sign-off Feb 2022 | 1861 Union St | Lennen Commercial Builders Inc | interior renovation of (e) retail store. demolition and construction of non load bearing partitions and layout.Details
interior renovation of (e) retail store. demolition and construction of non load bearing partitions and layout. | $850,000 |
| Feb 11, 2021 | Never finaled issued Nov 2021, no final | 532 Sutter St | Lennen Commercial Builders Inc | tenant improvement: level 2 new internal staircase to comply with egress. replace utilities. new cannabis retail on ground floor. basement will be unoccupied (for utility maintenance only). exterior work per plans. mech/plumbing under seperate permit.Details
tenant improvement: level 2 new internal staircase to comply with egress. replace utilities. new cannabis retail on ground floor. basement will be unoccupied (for utility maintenance only). exterior work per plans. mech/plumbing under seperate permit. | $850,000 |
| Oct 21, 2020 | Completed final sign-off Sep 2021 | 2174 Union St | Constructive Building Services Inc Dba C | interior t.i.: new non-load bearing partitions, hvac, electrical, plumbing, structural, lhghtin g& millwork. retail floor fixtures. fire life-safety deferreed.no change in zoning, use or occupancy.Details
interior t.i.: new non-load bearing partitions, hvac, electrical, plumbing, structural, lhghtin g& millwork. retail floor fixtures. fire life-safety deferreed.no change in zoning, use or occupancy. | $250,000 |
| Jan 24, 2019 | Completed final sign-off Aug 2019 | 428 Grove St | remove all work per nov#201793504. no other work under this permit.Details
remove all work per nov#201793504. no other work under this permit. | $1,500 | |
| Oct 16, 2018 | Never finaled issued Feb 2021, no final | 185 Bay Shore Bl | Level Land Builders Inc., Ultra Construction | installation of premanufactured paint booth in existing repair shop. ** maher: n/a **Details
installation of premanufactured paint booth in existing repair shop. ** maher: n/a ** | $25,000 |
| Jul 11, 2016 | Completed final sign-off Jul 2016 | 428 Grove St | revision to 201503241678, remove wall at ground fl kitchen from the scope of workDetails
revision to 201503241678, remove wall at ground fl kitchen from the scope of work | ||
| Mar 24, 2015 | Completed final sign-off Jul 2016 | 428 Grove St | to legalize the (e) in-law into 2 family residence. ordinance# 43-14. 1 bedroom, 1 bath & 1 kitchen in 2nd unit.Details
to legalize the (e) in-law into 2 family residence. ordinance# 43-14. 1 bedroom, 1 bath & 1 kitchen in 2nd unit. | $5,000 | |
| May 16, 2014 | Completed final sign-off Jul 2015 | 3555 Broderick St | West Coast Premier Construction Inc | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 - add shear wall and strong steel frame on 1st story (compliance with mahner ordinance no.155-13 not required)Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 - add shear wall and strong steel frame on 1st story (compliance with mahner ordinance no.155-13 not required) | $50,000 |
| Apr 22, 2014 | Completed final sign-off Dec 2014 | 428 Grove St | open wall for combustion air. replace space heater. replace existing single window to double window. repair damaged wood deckDetails
open wall for combustion air. replace space heater. replace existing single window to double window. repair damaged wood deck | $12,000 | |
| Dec 9, 2013 | Completed final sign-off Apr 2015 | 19 Ramona Av | Pacific Engineering & Construction Inc. | mandatory seismic retrofit (structural upgrade)Details
mandatory seismic retrofit (structural upgrade) | $20,000 |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 85 Cresta Vista Dr | R M Construction | move kitchen from front to rear of house new cabinets, counters, remove walls between extg kitchen and hall and rear office/bedroom, close door and build closet in extg living room/bedroom, replace patio door at rear of house, electrical and plmg to tie in to extg and build shear wall in basementDetails
move kitchen from front to rear of house new cabinets, counters, remove walls between extg kitchen and hall and rear office/bedroom, close door and build closet in extg living room/bedroom, replace patio door at rear of house, electrical and plmg to tie in to extg and build shear wall in basement | $45,000 |