Adel Poursharif
- License
- E21459
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E21459 at the Board for Professional Engineers
- Listed as
- engineer
- On San Francisco permits
- Feb 2021 to Apr 2021
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Lennen Commercial Builders Inc (2)
- Architects
- Thoms R. Hughes (2)
- Engineers
- Omar Leonel Garza (2), Richard Plump (2)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 2, 2021 | Completed final sign-off Feb 2022 | 1861 Union St | Lennen Commercial Builders Inc | interior renovation of (e) retail store. demolition and construction of non load bearing partitions and layout.Details
interior renovation of (e) retail store. demolition and construction of non load bearing partitions and layout. | $850,000 |
| Feb 11, 2021 | Never finaled issued Nov 2021, no final | 532 Sutter St | Lennen Commercial Builders Inc | tenant improvement: level 2 new internal staircase to comply with egress. replace utilities. new cannabis retail on ground floor. basement will be unoccupied (for utility maintenance only). exterior work per plans. mech/plumbing under seperate permit.Details
tenant improvement: level 2 new internal staircase to comply with egress. replace utilities. new cannabis retail on ground floor. basement will be unoccupied (for utility maintenance only). exterior work per plans. mech/plumbing under seperate permit. | $850,000 |